Interim Deficiency Rept DER 84-18 Re Wiring Errors on LPSI Pump B CS-3 Switch.Initially Reported on 840326.Final Rept Will Be Transmitted by 840912
ML20096G036
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/20/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30278-TDS, DER-84-18, NUDOCS 8409100319
Download: ML20096G036 (2)


Text

- _ _ _ _.

0 IlECEiVED fH10 Arizona Public Service Company G8415 23 Pli I: 34 REGIO!IVI?F August 20, 1984 ANPP-30278-TDS /IRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-18 A 50.55(e) Potentially Reportable Deficiency Relating To Wiring Error On LPSI

'B' Pump CS-3 Switch.

File: 84-019-026; D.4.33.2 Re ference: (A) Telephone conversation between P. Narbut and T. Bradish on March 26, 1984 (B) ANPP-29315, dated April 18, 1984 (Interim Report)

(C) ANPP-29664, dated June 6,1984 (Time Extension)

(D) ANPP-29974, dated July 16, 1984 (Time Extionsion)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by August 22, 1984.

APS is currently reviewing the Final Report. It is expected a Final Report will be transmitted to the NRC by September 12, 1984.

There is no new infctmation or change to the Interim Report at this time.

Very truly yours, E. E. Van Brunt, J.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:nj cc: See Page Two 8409100319 840820 PDR ADDCK 05000528 i

S PDR Q

K-J 7

7

?. 6

.Mr. T. W. Bishop DIR 84-18 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A.' C. Rogers L. A. Souza D. E. Fowler T.' D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L.-Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman i

S. R. Fmet J. Self M. Woods T. J. Bloom Records Center Institute of Nucicar Power Operations 1100_ Circle 75 Parkway, Suite 1500 Atlantc., GA 30339 l

i-

-.