Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095L098 + (ML20095L098)
- ML20095L102 + (ML20095L102)
- ML20095L105 + (ML20095L105)
- ML20095L108 + (ML20095L108)
- 0CAN088415, Requests Withdrawal of 840725 Notice of Violation & Proposed Imposition of Civil Penalty.Corrective Actions Initiated Prior to Enforcement Action,Including Augmenting QA Staff,Retraining QC Staff & Increasing Vendor Surveys + (ML20095L111)
- 05000455/LER-1992-002-10, :on 920410,containment Ventilation Isolation Occurred Due to Voltage Transient.Caused by Lightning Strike.All ESF Actuations Reset + (ML20095L117)
- 05000271/LER-1992-013, :on 920410,maint of Filled Discharge Piping for CS Surveillance Test Missed.Caused by Personnel Error. No Immediate Corrective Action Necessary + (ML20095L118)
- ML20095L119 + (ML20095L119)
- 05000334/LER-1992-005, :on 920402,surveillance of River Water for Component Cooling Water HX Was Missed.Caused by Personnel error.RW-645 Was Verified in Correct Position + (ML20095L126)
- ML20095L132 + (ML20095L132)
- ML20095L134 + (ML20095L134)
- 3F1295-18, Forwards Crystal River Unit 3 Seismic Evaluation Rept for USI A-46, Rev 0 + (ML20095L141)
- ML20095L146 + (ML20095L146)
- 05000454/LER-1992-002-11, :on 920403,loss of One of Two ESF Unit Crossties Noted.Caused by Personnel Error.Review of Electrical non-technical Surveillances Performed & Procedures Revised + (ML20095L149)
- NRC-95-4616, Submits Responses to RAI on AP600 Design Certificate Program + (ML20095L164)
- ML20095L165 + (ML20095L165)
- ML20095L169 + (ML20095L169)
- ML20095L173 + (ML20095L173)
- ML20095L176 + (ML20095L176)
- ML20095L182 + (ML20095L182)
- ML20095L184 + (ML20095L184)
- ML20095L190 + (ML20095L190)
- ML20095L194 + (ML20095L194)
- ML20095L195 + (ML20095L195)
- ML20095L197 + (ML20095L197)
- ML20095L207 + (ML20095L207)
- ML20095L208 + (ML20095L208)
- ML20095L212 + (ML20095L212)
- ML20095L214 + (ML20095L214)
- ML20095L218 + (ML20095L218)
- ML20095L221 + (ML20095L221)
- ML20095L223 + (ML20095L223)
- BECO-LTR-95-127, Forwards Response to NRC RAI Re Internal Event Analysis in Response to GL 88-20 + (ML20095L224)
- ML20095L230 + (ML20095L230)
- ML20095L233 + (ML20095L233)
- ML20095L237 + (ML20095L237)
- ML20095L240 + (ML20095L240)
- ML20095L253 + (ML20095L253)
- PLA-2281, Special Rept:On 840528,during Startup Test 14.2, Reactor Vessel Injections, Two RCIC Sys Actuations Resulted in Injection of Water Into Rcs.Current Usage for Affected Nozzles Less than 0.70 + (ML20095L262)
- ML20095L268 + (ML20095L268)
- LD-92-060, Forwards Draft Sys 80+ Tier 1 Design Descriptions & Insps, Tests,Analyses & Acceptance Criteria for Sys 80+ Std Design.Meeting Requested on 920512 to Discuss Encl Design Descriptions + (ML20095L271)
- LD-92-063, Forwards Info to Supplement 920325 Responses to NRC Request for Addl Info Re Analysis of Ruptured Reactor Coolant Pump Seal Cooler Tube & Single Failure Assumptions for Analysis of moderate-energy-line Break + (ML20095L282)
- BECO-84-138, Submits 1984 Main Breakwater Surveillance Rept. No Damage or Major Stone Movement Occurred to Structure Since 1983 Rept.Photographs & Two Oversize Drawings Encl.Aperture Cards Available in PDR + (ML20095L296)
- ML20095L313 + (ML20095L313)
- LD-92-057, Forwards Draft Section 7 of Distribution Sys Design Guide, Discussed at Mechanical & Piping Sys Audit Meeting on 920422-23 in Charlotte,Nc,Per Commitment in Vendor + (ML20095L314)
- ML20095L335 + (ML20095L335)
- ML20095L337 + (ML20095L337)
- ML20095L339 + (ML20095L339)
- ML20095L341 + (ML20095L341)
- ML20095L348 + (ML20095L348)
- ML20095L350 + (ML20095L350)