Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E542 + (ML20095E542)
- 05000454/LER-1995-006-10, :on 951028,surveillance Was Missed During SG Tube Insp.Caused by Cognitive Personnel Error.Counselled Cognizant Engineer on Responsibilities Re SG Work + (ML20095E544)
- ML20095E546 + (ML20095E546)
- ML20095E553 + (ML20095E553)
- ML20095E561 + (ML20095E561)
- ML20095E565 + (ML20095E565)
- ML20095E566 + (ML20095E566)
- RBG-18595, Interim Deficiency Rept DR-221 Re Cylinder Head Fire Deck Wall Thickness of Standby Diesel Generators.Interim or Final Status Rept Will Be Provided by 841101 + (ML20095E588)
- ML20095E589 + (ML20095E589)
- ST-HL-AE-1121, Third Interim Deficiency Rept Re Corrosion in Safety Injection Sys Pipe Weld.Initially Reported on 831020.Next Rept Will Be Submitted by 841116 + (ML20095E590)
- ML20095E591 + (ML20095E591)
- ML20095E594 + (ML20095E594)
- ML20095E597 + (ML20095E597)
- ML20095E608 + (ML20095E608)
- ML20095E614 + (ML20095E614)
- ML20095E615 + (ML20095E615)
- ML20095E616 + (ML20095E616)
- NRC-95-4608, Provides Three Copies of Licensee Response to NRC RAI on Wcobra/Trac Computer Code + (ML20095E638)
- RC-95-0212, Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing + (ML20095E650)
- ML20095E654 + (ML20095E654)
- ML20095E660 + (ML20095E660)
- RBG-42264, Responds to Request for Addl Info Re Drywell Bypass Leakage + (ML20095E663)
- 05000325/LER-1995-014, :on 950712,unplanned Esfa Occurred Due to Low Voltage Spike on B Reactor Protection Sys.Replaced Voltage Regulators on All Four RPS MG Sets + (ML20095E665)
- NRC-95-4606, Forwards AP600 MAAP4 Benchmarking Plan.Plan Describes Comprehensive Plan to Address All Outstanding MAAP4 Issues, Including Benchmarking & Thermal/Hydraulic Concerns + (ML20095E666)
- ML20095E672 + (ML20095E672)
- ML20095E680 + (ML20095E680)
- ML20095E688 + (ML20095E688)
- ML20095E693 + (ML20095E693)
- ML20095E702 + (ML20095E702)
- ML20095E704 + (ML20095E704)
- ML20095E708 + (ML20095E708)
- ML20095E712 + (ML20095E712)
- ML20095E717 + (ML20095E717)
- 05000445/LER-1995-005, :on 950831,power Operated Relief Valves Potentially Inoperable Due to non-conservative Setpoints. Raised PORV N Accumulator Low Pressure Alarm Setpoints to 90 Psig + (ML20095E720)
- ML20095E725 + (ML20095E725)
- 05000423/LER-1992-005, Discusses Omission of RCS Depressurization Function from TS Requirements for Remote Shutdown Capability,Per LER 92-005 Submitted Via .Caused by Administrative Oversight.Ts Change Will Be Processed & Valves Tested + (ML20095E726)
- 05000423/LER-1991-014, :on 910609,reactor & Subsequent Turbine Trip Occurred.Caused by phase-to-ground Fault on 345 Kv Sys Transmission Line & Loose Restraint Tap of Relay.Tap Screw & Wiring Repaired & Relay Returned to Svc + (ML20095E728)
- ML20095E731 + (ML20095E731)
- ML20095E734 + (ML20095E734)
- ML20095E735 + (ML20095E735)
- ML20095E741 + (ML20095E741)
- ELV-03653, Responds to NRC 920414 Telcon Request for Addl Info Re Thermal Design Flow & Analyses of Inadvertent Opening of SG Relief or Safety Valve,Steam Sys Supply Failure & Main Steam Line Break Info Used for Superheat Study + (ML20095E743)
- ML20095E747 + (ML20095E747)
- ML20095E750 + (ML20095E750)
- ML20095E752 + (ML20095E752)
- ML20095E758 + (ML20095E758)
- ML20095E760 + (ML20095E760)
- RBG-42272, Clarifies Intent to Match SR 3.0.2 Re Extensions to Surveillance Intervals Proposed in 951024 License Amend Request 95-21,to Generic Implementing Specs in NRC + (ML20095E770)
- RBG-18597, Interim Deficiency Rept DR-219 Re Design Loads of Conduit Supports.Interim or Final Status Rept Will Be Provided by 841101 + (ML20095E771)
- ML20095E772 + (ML20095E772)
- ML20095E775 + (ML20095E775)