Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E442 + (ML20095E442)
- ML20095E444 + (ML20095E444)
- 05000333/LER-1984-016, :on 840621,both 4 Kv Emergency Bus Undervoltage Relays on 10500 Bus (Div I) Found Outside Tech Spec Limits. Cause Not Stated.Procedure Placed in New Format Highlighting Tech Spec Requirements + (ML20095E450)
- ML20095E452 + (ML20095E452)
- ML20095E454 + (ML20095E454)
- ML20095E457 + (ML20095E457)
- ML20095E464 + (ML20095E464)
- ML20095E467 + (ML20095E467)
- ML20095E470 + (ML20095E470)
- ML20095E478 + (ML20095E478)
- ML20095E481 + (ML20095E481)
- ML20095E487 + (ML20095E487)
- ML20095E489 + (ML20095E489)
- ML20095E495 + (ML20095E495)
- 05000278/LER-1990-003-02, :on 900306,reactor Scram Occurred Due to Main Turbine Trip.Caused by Improper Setting of Timer Due to Deficient Test Procedure.Procedure Revised + (ML20095E507)
- ML20095E511 + (ML20095E511)
- HL-5083, Provides Comments on Suppl 1 to GL 83-11, Licensee Qualification for Performing Safety Analyses + (ML20095E514)
- ML20095E517 + (ML20095E517)
- ML20095E520 + (ML20095E520)
- 05000454/LER-1995-010-08, :on 951113,chemistry Sample for Lcoar Was Not Done within Specified Time Limit Due to de-energized Closed Valve.Closed Circuit Breaker & Sample Was Taken + (ML20095E530)
- ML20095E533 + (ML20095E533)
- ML20095E542 + (ML20095E542)
- 05000454/LER-1995-006-10, :on 951028,surveillance Was Missed During SG Tube Insp.Caused by Cognitive Personnel Error.Counselled Cognizant Engineer on Responsibilities Re SG Work + (ML20095E544)
- ML20095E546 + (ML20095E546)
- ML20095E553 + (ML20095E553)
- ML20095E561 + (ML20095E561)
- ML20095E565 + (ML20095E565)
- ML20095E566 + (ML20095E566)
- RBG-18595, Interim Deficiency Rept DR-221 Re Cylinder Head Fire Deck Wall Thickness of Standby Diesel Generators.Interim or Final Status Rept Will Be Provided by 841101 + (ML20095E588)
- ML20095E589 + (ML20095E589)
- ST-HL-AE-1121, Third Interim Deficiency Rept Re Corrosion in Safety Injection Sys Pipe Weld.Initially Reported on 831020.Next Rept Will Be Submitted by 841116 + (ML20095E590)
- ML20095E591 + (ML20095E591)
- ML20095E594 + (ML20095E594)
- ML20095E597 + (ML20095E597)
- ML20095E608 + (ML20095E608)
- ML20095E614 + (ML20095E614)
- ML20095E615 + (ML20095E615)
- ML20095E616 + (ML20095E616)
- NRC-95-4608, Provides Three Copies of Licensee Response to NRC RAI on Wcobra/Trac Computer Code + (ML20095E638)
- RC-95-0212, Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing + (ML20095E650)
- ML20095E654 + (ML20095E654)
- ML20095E660 + (ML20095E660)
- RBG-42264, Responds to Request for Addl Info Re Drywell Bypass Leakage + (ML20095E663)
- 05000325/LER-1995-014, :on 950712,unplanned Esfa Occurred Due to Low Voltage Spike on B Reactor Protection Sys.Replaced Voltage Regulators on All Four RPS MG Sets + (ML20095E665)
- NRC-95-4606, Forwards AP600 MAAP4 Benchmarking Plan.Plan Describes Comprehensive Plan to Address All Outstanding MAAP4 Issues, Including Benchmarking & Thermal/Hydraulic Concerns + (ML20095E666)
- ML20095E672 + (ML20095E672)
- ML20095E680 + (ML20095E680)
- ML20095E688 + (ML20095E688)
- ML20095E693 + (ML20095E693)
- ML20095E702 + (ML20095E702)
- ML20095E704 + (ML20095E704)