Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094R302 + (ML20094R302)
- ML20094R312 + (ML20094R312)
- ML20094R317 + (ML20094R317)
- ML20094R319 + (ML20094R319)
- 05000220/LER-1984-009, :on 840713,loss of Plant Process Computer Caused Each Acurex Channel to Become Inoperable.Channels Disconnected from Computer & Manually Restored to Operable Status.Software Changed to Avoid Future Error + (ML20094R321)
- ML20094R325 + (ML20094R325)
- 05000247/LER-1984-007, :on 840711,during Continuous Fire Watch, Personnel Failed to Watch Cable Spreading Room for 4 H. Personnel Reinstructed + (ML20094R334)
- ML20094R350 + (ML20094R350)
- ULNRC-03297, Withdraws 950224 Application for Amend to TS Surveillance Requirement 4.6.1.7.4 & Associated Bases to Delete Requirement to Verify Quarterly That Measured Leakage Rate Is Less than 0.05 Times Max Allowable Leakage Rate + (ML20094R355)
- ML20094R359 + (ML20094R359)
- ML20094R362 + (ML20094R362)
- ML20094R367 + (ML20094R367)
- ML20094R369 + (ML20094R369)
- ML20094R372 + (ML20094R372)
- ML20094R395 + (ML20094R395)
- ML20094R400 + (ML20094R400)
- ML20094R405 + (ML20094R405)
- ML20094R432 + (ML20094R432)
- ML20094R444 + (ML20094R444)
- ULNRC-03298, Provides Commitment to Convert to Improved Std Tech Specs, Using Process Discussed at 951114 Meeting + (ML20094R459)
- 3F1195-26, Advises TS Change Request 199 Re Rated Thermal Power Level Increase to 2568 Mwt Should Read as Listed + (ML20094R466)
- LIC-95-0223, Forwards Response to Request for Addl Info to Assist Closure of NRC Staff Review of Individual Plant Exam Submittal + (ML20094R491)
- LIC-95-0220, Forwards Fort Calhoun Station Performance Indicators Rept for Oct 1995 + (ML20094R495)
- ML20094R498 + (ML20094R498)
- ML20094R506 + (ML20094R506)
- ML20094R508 + (ML20094R508)
- ML20094R513 + (ML20094R513)
- 05000336/LER-1995-041, :on 951030,SI & Containment Spray Sys Valves Operational Readiness Test Identified Potential for Placing EDG in Overloaded Condition.Caused by Deficient Procedure. Implemented Procedure Change to Sp 21136 + (ML20094R522)
- 05000271/LER-1995-017, :on 950922,TS 4.6.E Was Not Met Due to Components Not Included in IST Program Scope.Performed Comprehensive Review of IST Program Scope to Verify Compliance W/Asme/Ansi OMa-1988 Parts 1,6 & 10 + (ML20094R529)
- HL-5079, Forwards Rev 2 to Ei Hatch Nuclear Plant Unit 1,Cycle 16 COLR & Rev 0 to Ei Hatch Nuclear Plant Unit 2,Cycle 13 Colr + (ML20094R530)
- ML20094R532 + (ML20094R532)
- ML20094R535 + (ML20094R535)
- ML20094R553 + (ML20094R553)
- ML20094R563 + (ML20094R563)
- ML20094R567 + (ML20094R567)
- PY-CEI-NRR-2005, Advises That Investigation Has Been Conducted Into Denial of Site Access Concerns at Facility + (ML20094R569)
- ML20094R572 + (ML20094R572)
- ML20094R573 + (ML20094R573)
- B15462, Provides Revised Repair Plan Re Check Valve 3RCS*V146 + (ML20094R586)
- ML20094R592 + (ML20094R592)
- ML20094R593 + (ML20094R593)
- ML20094R596 + (ML20094R596)
- BVY-95-126, Documents Actions Taken by Util to Evaluate Small Leak in Svc Water Piping & Request Relief from Requirement to Perform Immediate Code Repair,Per GL 95-05 + (ML20094R599)
- 05000334/LER-1984-008, :on 840706,reactor Shutdown Bank Rods Tripped on Pressurizer Low Pressure Trip Signal.Caused by Surveillance Test Performed W/Reactor Trip Breakers Closed. Personnel Counseled.Procedure to Be Revised + (ML20094R613)
- 05000334/LER-1984-007, :on 840704,containment Recirculation Cooling Coils Chilled Water Sys Outlet Isolation Valve Failed Shut, Causing Containment Temp to Reach 105.08 F.Caused by Failed Pneumatic Valve Diaphragm + (ML20094R623)
- ML20094R634 + (ML20094R634)
- ML20094R639 + (ML20094R639)
- BSEP-95-0536, Informs NRC of Util Intent to Convert Current TS of Plant to Format Contained in NUREG-1433, Sts,Ge Plants,BWR/4, Rev 1 + (ML20094R649)
- ML20094R672 + (ML20094R672)
- JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles + (ML20094R694)
- ML20094R698 + (ML20094R698)