Monthly Operating Rept for Jul 1984
ML20094R573
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/31/1984
From: Mcdonald R, Woodward J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8408200611
Download: ML20094R573 (5)


Text

__

' OPERATING DATA REPORT 50-348 f

DOCKET NO.

DATE 5/b/s4 COMPLETED BY J.D. Woodard TELEPHONE (205) 899-5156 OPERATING STATUS Notes

1. Unit Name:

.Tonenh M.

Farlev - Unit 1

2. Reporting Period:

July, 1984

1) Cumulative' data since 2652 12-1-77, date of'
3. Licensed Thermal Power (MWt):

860 commercial. operation.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

MO

6. Maximum Dependable Capacity (Gross MWe):

841.8 797.1

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through "I) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

N/A This Month Yr to-Date Cumulative 744 5,111 58,439

11. Hour:In Reporting Period 744.0 3,332.8 38,456 j
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0

- 0.0 3.650.0 l

14. Hours Generator On Line 744.0 3.248.0 37.351.4
15. Unit Reserve Shutdown Hours 0.0

.0. 0 0.0

16. Gross Thermal Energy Genented (MWH) 1,973,062 8,174,380 94,275',906

~17. Gross Electrical Energy Generated (MWH) 637,754 2,628,266 29,971,276

.18. Net Electrical Energy Generated (MWH) 605,750 2,466,846 28,167,908

19. Unit Service Factor 100.0 63.6 63.9
20. Unit Availability Factor inn _n 63.6 63.9
21. Unit Capacity Factor (Using MDC Net) 102.1 60.6 60.5
22. Unit Capacity Factor (Using DER Net) 98.2 58.2 58.1 0.0 2.4

.14.3 l

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A i

i

/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Co mercial Operation):

Forecast Achieved INITIAL CRITICALITY 8-6-77 8-9-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77 l

8408200611 840731 1-DR ADOCK 05000348

)

PDR t

I

50-348 DOcm NO.

UNIT I

6/84 DATE J. D. Woodard COMPLETiD BY TELEPHONE (205) 899-5156 MONTil July. 1984 DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 816 813 g,

g7 815 gg 814 2

816 3

814 19 816 4'

at5 20 5

815 21 813 814 I

6 Ris 22 816 814 7

23 g

816 24 814 815 9

R11 25 813 814 10 26 11 810 27 815 815 816 12 813 818 33 3

14 814 30 815 813 Is sia 33 812 16 etSTRt1GONS On this form:t. list the svenp daily umt puwer !cvelin MWe-Net for e:ch day in the reporting month. Campute to

, the ne:re:t whole mepwust.

s (907)

UNIT SilU100WNS AND FOWOL REI)UCTIONS I)MKET NO. -

48

,7 i

IIA IE August 6, 1984 REPORT &lONfil July. 1984 COhlPLETEI) py J.

). WOOdard j

TEl.EPilONE (205) 899-5156 i

)

i i

=

F.

i

.E g g

s'j utensee Ev, j%

No.

Dale g

3g

, gig I' vent p

gu Cause & Cuneceive

'E Acliini to

)

t-fE gE j syg g Repent a to V

,g pg,,,,,g,y,g,,c, 6

I I

THER E WERE NC Uf IT SHl TDOWN s OR.

SIGNIFICANT POWER REDUCTIl lNS DURING THE MONTH OF JULY.

l i

1 i

1 j

i i

i i

i I

3 3

4 l

F: rooted Reason:

kleihud:

Ealiibis G Insinutsions i

S: Seleeduled A Eigulpment Failuse(Emplain) 1 klanual for Psepasasiini of D ia is nlaineenance seiTest 2 Efanual Sceaan.

Enuy Sliccis fus 8.itensee j

C.Refuchog 3 Aulianatic Scsans.

then Repini(1.ER)l7ile INUREG-l p Hegulainsy Hesisiciiine 4 Oslect (Engdain) 01611 j

E Opesaios Training A ikense Emandnasion i

F-Adminisesasive 5

G Opcealiensal Einst (Emplain)

(9/77) ll-Oslics (Eaplaise) 1..sinbis 1 Sanie Souece

Malling Address Alab ma Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabarila Power t*v scu:~en, e ectr c s, e' August 14, 1984 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the July 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Techi.ical Specifications.

As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very tru f4

&l

/

/

R.

. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) i l

.r624

'lr.

i JOSEPH M. FARLEY NUCLEAR PLANT-UNIT 1.

N'RRATIVE

SUMMARY

OF OPERATIONS A

July, 1984 There were no unit shutdowns or significant power reductions during the month of July.

The following major safety-related maintenance was' performed in the month of July:

1.

Performed miscellaneous corrective and preventive maintenance on diesel generators.

t

.. _ ~ ~