' OPERATING DATA REPORT 50-348 f
DOCKET NO.
DATE 5/b/s4 COMPLETED BY J.D. Woodard TELEPHONE (205) 899-5156 OPERATING STATUS Notes
- 1. Unit Name:
.Tonenh M.
Farlev - Unit 1
- 2. Reporting Period:
July, 1984
- 1) Cumulative' data since 2652 12-1-77, date of'
- 3. Licensed Thermal Power (MWt):
860 commercial. operation.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
MO
- 6. Maximum Dependable Capacity (Gross MWe):
841.8 797.1
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through "I) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr to-Date Cumulative 744 5,111 58,439
- 11. Hour:In Reporting Period 744.0 3,332.8 38,456 j
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0
- 0.0 3.650.0 l
- 14. Hours Generator On Line 744.0 3.248.0 37.351.4
- 15. Unit Reserve Shutdown Hours 0.0
.0. 0 0.0
- 16. Gross Thermal Energy Genented (MWH) 1,973,062 8,174,380 94,275',906
~17. Gross Electrical Energy Generated (MWH) 637,754 2,628,266 29,971,276
.18. Net Electrical Energy Generated (MWH) 605,750 2,466,846 28,167,908
- 19. Unit Service Factor 100.0 63.6 63.9
- 20. Unit Availability Factor inn _n 63.6 63.9
- 21. Unit Capacity Factor (Using MDC Net) 102.1 60.6 60.5
- 22. Unit Capacity Factor (Using DER Net) 98.2 58.2 58.1 0.0 2.4
.14.3 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
N/A i
i
/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Co mercial Operation):
Forecast Achieved INITIAL CRITICALITY 8-6-77 8-9-77 INITIAL ELECTRICITY 8-20-77 8-18-77 COMMERCIAL OPERATION 12-1-77 12-1-77 l
8408200611 840731 1-DR ADOCK 05000348
)
PDR t
I
50-348 DOcm NO.
UNIT I
6/84 DATE J. D. Woodard COMPLETiD BY TELEPHONE (205) 899-5156 MONTil July. 1984 DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 816 813 g,
g7 815 gg 814 2
816 3
814 19 816 4'
at5 20 5
815 21 813 814 I
6 Ris 22 816 814 7
23 g
816 24 814 815 9
R11 25 813 814 10 26 11 810 27 815 815 816 12 813 818 33 3
14 814 30 815 813 Is sia 33 812 16 etSTRt1GONS On this form:t. list the svenp daily umt puwer !cvelin MWe-Net for e:ch day in the reporting month. Campute to
, the ne:re:t whole mepwust.
s (907)
UNIT SilU100WNS AND FOWOL REI)UCTIONS I)MKET NO. -
48
,7 i
IIA IE August 6, 1984 REPORT &lONfil July. 1984 COhlPLETEI) py J.
). WOOdard j
TEl.EPilONE (205) 899-5156 i
)
i i
=
F.
i
.E g g
s'j utensee Ev, j%
No.
Dale g
3g
, gig I' vent p
gu Cause & Cuneceive
'E Acliini to
)
t-fE gE j syg g Repent a to V
,g pg,,,,,g,y,g,,c, 6
I I
THER E WERE NC Uf IT SHl TDOWN s OR.
SIGNIFICANT POWER REDUCTIl lNS DURING THE MONTH OF JULY.
l i
1 i
1 j
i i
i i
i I
3 3
4 l
F: rooted Reason:
kleihud:
Ealiibis G Insinutsions i
S: Seleeduled A Eigulpment Failuse(Emplain) 1 klanual for Psepasasiini of D ia is nlaineenance seiTest 2 Efanual Sceaan.
Enuy Sliccis fus 8.itensee j
C.Refuchog 3 Aulianatic Scsans.
then Repini(1.ER)l7ile INUREG-l p Hegulainsy Hesisiciiine 4 Oslect (Engdain) 01611 j
E Opesaios Training A ikense Emandnasion i
F-Adminisesasive 5
G Opcealiensal Einst (Emplain)
(9/77) ll-Oslics (Eaplaise) 1..sinbis 1 Sanie Souece
Malling Address Alab ma Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabarila Power t*v scu:~en, e ectr c s, e' August 14, 1984 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the July 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Techi.ical Specifications.
As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very tru f4
&l
/
/
R.
. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RII (1 copy) i l
.r624
'lr.
i JOSEPH M. FARLEY NUCLEAR PLANT-UNIT 1.
N'RRATIVE
SUMMARY
OF OPERATIONS A
July, 1984 There were no unit shutdowns or significant power reductions during the month of July.
The following major safety-related maintenance was' performed in the month of July:
1.
Performed miscellaneous corrective and preventive maintenance on diesel generators.
t
.. _ ~ ~