Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094D992 + (ML20094D992)
- ML20094D995 + (ML20094D995)
- ML20094D999 + (ML20094D999)
- ML20094E002 + (ML20094E002)
- ML20094E007 + (ML20094E007)
- ML20094E008 + (ML20094E008)
- LIC-95-0202, Responds to NRC Re Violations Noted in Insp Rept 50-285/95-14 on 950813-0923.Corrective Actions:Contractor Craft on Site Given Remedial Training on SO-G-107 Requirements + (ML20094E010)
- ML20094E014 + (ML20094E014)
- ML20094E015 + (ML20094E015)
- ML20094E020 + (ML20094E020)
- ML20094E026 + (ML20094E026)
- ML20094E027 + (ML20094E027)
- RBG-41481, Forwards Matl Requested in for Upcoming Licensed Operator Exams + (ML20094E031)
- ML20094E041 + (ML20094E041)
- BVY-95-114, Provides Addl Info Re GL 88-20, IPE for Severe Accident Vulnerabilities 10CFR50.54(f) + (ML20094E051)
- A04142, Forwards Addl Info in Response to NRC 840619 Request Re Amend 2 to Probabilistic Safety Study + (ML20094E060)
- ML20094E067 + (ML20094E067)
- ML20094E069 + (ML20094E069)
- ML20094E071 + (ML20094E071)
- BSEP-95-0570, Forwards Core Shroud Reinspection Plan Unit 2 B212R1 Outage Feb 1996 + (ML20094E078)
- ML20094E086 + (ML20094E086)
- ML20094E093 + (ML20094E093)
- ML20094E096 + (ML20094E096)
- ML20094E097 + (ML20094E097)
- ML20094E098 + (ML20094E098)
- ML20094E103 + (ML20094E103)
- ML20094E104 + (ML20094E104)
- ML20094E112 + (ML20094E112)
- ML20094E114 + (ML20094E114)
- TXX-4219, Responds to NRC Re Alleged Improper Const Practices Involving Main Condensers.Qa Program Not Invoked Because Main Condenser Not safety-related,but Activities Monitored Closely.Leakage Testing & Detection Discussed + (ML20094E125)
- 05000266/LER-1991-015, :on 911128, a SG Main Steam Isolation Bypass Valve Was Left Open.Caused by Procedural Inadequacy W/ Inservice Test IT-280.Valve Was Immediately Shut + (ML20094E126)
- LIC-95-0111, Discusses ISI Program Plan for FCS Including Both IST Program & Inservice Insp NDE Program + (ML20094E131)
- 05000338/LER-1991-020, :on 911031,discovered Shared Svc Water Sys May Not Have Been Able to Provide Design Flow to Accident Unit Recirculation Spray Hxs.Caused by Personnel Error.Spray Valves Opened + (ML20094E138)
- 05000362/LER-1991-008-02, :on 911129,missed Firewatch Discovered.Caused by Personnel Error.Firewatch Supervisors Increased Monitoring of Roving Firewatch Personnel.Personnel Involved Received Disciplinary Action + (ML20094E143)
- ML20094E144 + (ML20094E144)
- BECO-84-105, Part 21 Rept Re Twisted Shielded Pair Cable in Nutherm Intl, Inc Analog Trip Cabinets C2228A1,C2228A2,C2229B1 & C2229B2. Initially Reported on 840713.Caused by Poor Workmanship. Cables Exhibiting Defects Replaced + (ML20094E148)
- RBG-36-153, Forwards Rev 1 to River Bend Station 1992 Emergency Preparedness Evaluated Exercise Scenario Scheduled for 920226 + (ML20094E151)
- ML20094E155 + (ML20094E155)
- ML20094E165 + (ML20094E165)
- 05000440/LER-1991-025, :on 911212,liquid Penetrant Testing Revealed Crack in Weld Upstream of High Point Vent Valve on HPCS Sys Test Return Line.Caused by Having Insufficient Weld Metal & Contour.Other Welds to Be Inspected + (ML20094E187)
- ML20094E190 + (ML20094E190)
- 05000458/LER-1991-021, :on 911208,reactor Protection Sys Actuation Occurred Due to Operator Failure to Verify Scram Discharge Vol Level.Abnormal Operating Procedure AOP-0001 Revised + (ML20094E195)
- 05000327/LER-1991-025, :on 911214,jumpers Were Discovered on a Train Closure Circuitry That Were Not Removed Following Outage Maint Activities.Caused by Personnel Not Following Proper Procedures.Disciplinary Action Taken + (ML20094E197)
- 05000327/LER-1991-027, :on 911213,manual Closure of MSIV Resulted in Inadvertent Cooldown of Rcs.Caused by Intermittent Failure of Steam Dump Valve Controller Resulting in Opening of Two Steam Dump Valves.Potentiometer Replaced + (ML20094E200)
- 05000482/LER-1991-026, :on 911212,CR Ventilation Isolation Received When Key for RM Gk RE-004 Was Not Placed Fully in Bypass Position.Discussion of LER Will Be Included in Licensed Operator Requalification Training by 920430 + (ML20094E202)
- AECM-84-0382, Special Rept 84-027/0:on 840615,fire-rated Penetrations AE-258D,AE-257D & AE-6D Opened to Implement Design Change package.Seven-day Limiting Condition for Operation Time Limit Exceeded.Fire Watch Established + (ML20094E203)
- 05000254/LER-1991-025-01, :on 911211,reactor Scram Occurred Due to Turbine Stop Valve Closure.Caused by Misaligment of 1A FW Regulating Valve Causing Valve to bind.1A FW Regulating Valve Diassembled & Repaired + (ML20094E208)
- 05000301/LER-1991-006-01, :on 911217,when Panel D22 Deenergized,Reactor Trip Breaker Opened,Resulting in Reactor Trip & Actuation of Crossover Steam Dump Sys.Caused by Loose Cable Termination. All Terminations check-tightened + (ML20094E213)
- 05000285/LER-1991-031, :on 911216,determined That Connections to Personnel Air Lock Bulkheads for Leak Testing Potentially Outside Original Design Requirements.Caused by Lack of Procedures.Danger Tags Hung on Door + (ML20094E214)
- ML20094E220 + (ML20094E220)
- 05000289/LER-1984-003-01, :on 840702,12 Penetrations in Instrument Shop Floor Identified as Not Having fire-rated Penetration Seals. Caused by Inadequate Supervision of Contractor Personnel During Installation.Insp Procedure Changed + (ML20094E221)