ML20094E103

From kanterella
Jump to navigation Jump to search
Forwards Vogtle Electric Generating Plant Unit 1,Cycle 6 COLR, Rev 1
ML20094E103
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/02/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094E106 List:
References
LCV-492-B, NUDOCS 9511070064
Download: ML20094E103 (1)


Text

_ _ _ _.

_. ~

m -.... _. - __

_.m Georg;a Power Company 40 inverness Center Parkway e

Post O%co Box 1295 Birmingham, Alabama 35201 Telephone 205 877 7122 L

Georgia Power C. K. McCoy Vice President. Nuclear November 2, 1995 Vogtle Protect the southem electic system LCV-492-B Docket No. 50-424 U. S. Nuclear Regulatory Commission ATTN. Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT REVISION TO CORE OPERATING LIMITS REPORT In accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby submits the enclosed revision to the Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant, Unit I Cycle 6.

Please contact this office if you have any questions.

Sincer y, h ' ll '

l C. K. McCoy CKM/HWM Enclosure cc:

Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle N?'053 f0 5

9511070064 951102 1

PDR ADOCK 05000424 P

PDR i

__