Interim Deficiency & Part 21 Repts,Item 178 Re Stainless Steel Sockolettes & Weldolettes Supplied by Guyon Alloys, Inc Not in Accordance W/Nca 3800.Initially Reported on 840619.Next Rept by 840915
ML20094E190
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/16/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-239, REF-PT21-84-386-000 178, PT21-84-386, PT21-84-386-000, NUDOCS 8408090131
Download: ML20094E190 (4)


Text

.

s.

.,a 6I

~

CD&L Carolina Power & Light Company

._ o

+.o uu P.O. Box 101, New Hill, N.C.

27562 July 16, 1984 Mr. James P. O'Reilly NRC-239 United States Nuclear Regulatory Commission Region II 101 Mrietti. Street, hrthwest (Suite 2900)

Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - S00,000 KW - UNIT 1 SOCK 0LETS AND WELD 0LETS -

QUESTIONABLE STARTING MATERIAL, ITEM 178

Dear Mr. O'Reilly:

Attached is an interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on June 19, 1984.

CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by September 15, 1984.

Thank you for your consideration in thic matter.

Yours very truly, m kg -W- -

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/ jam l

Attachment l

cc: Messrs. G. Maxwell /R. Prevstte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) l dpMCl* cot

  • l l

8408090131 840716 "7

I PDR ADOCK 05000400 JUC f

g l

s em j

CAROLINA POWER & LIGHT COMPANY SilEAR0" UARRIS NUCLEAR POWER PLANT UNIT NO. 1 i

INTERIM REPORT

~

i SOCK 0LETS AND WELD 0LETS -

QUESTIONABLE STARTING MATERIAL 5

ITEM 178 4

JULY 16, 1984 REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21 i

I'

[

P

- ~, - - -,

e,---

-.s---

.,,+-~w

-n-, - +..,,,m.-~~<-

--..n.,

e e-s.,, - -+-

..m n.-,.-,

.-,n.,

n

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit No. 1, 10CFR50.55(e) and 10CFR, Part 21 reportable deficiency. Stainless steel sockolets and weldolets j

nct supplied in accordance with NCA 3800.

ITEM:

1" and 1/2" ASME III Code Class 2 Weldolets and Sockolets.

SUPPLIED BY:

Guyon Alloys, Inc., 950 S. 4th St., Harrison, New Jereey 07029 NATURE OF DEFICIENCY:

Bonney Farge, the fitting manufacturer, performed an internal review and found that the material was not supplied in accordance with NCA 3800.

(The mill test report was not verified by Bonney Forge testing.)

DATE PROBLEM OCCURRED:

CP&L was notified by Guyon Alloys on May 29, 1984 that the documentation was deficient.

DATE PROBLEM REPORTED:

On June 19, 1984, CP&L (Mr. K. V. Hate') notified the NRC (Mr. A. Hardin) that this item was reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.

SCOPE OF PROBLEM:

139 each 1" and 1/2" weldolets and sockolets.

SAFETY IMPLICATION:

Since the documentation does not meet ASME Code requirements, the potential exists for failure if the fittings are installed in an ASME Class 2 or 3 line.

REASON DEFICIENCY IS REPORTABLE:

The materials were incorrectly qualified as ASME Class 2.

e:o CORRECTIVE ACTION:-

Of the 139 fittings received, 132 are segregated, tagged with hold tags, and are in the process of being returned to the vendor. Four (4) each have

.been scrapped, two (2) each have been downgraded for use in Non-ASME lines, and one (1) each has not been accounted for yet; however, a search for this fitting is continuing.

FINAL REPORT:

The final report on this item is pending the return of the 132 fittings to the vendor, locating and disposition of the unaccounted for fitting, and the vendor's preventive measures. A final report is projected to be issued by September 15, 1984.