Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094D452 + (ML20094D452)
- ML20094D459 + (ML20094D459)
- ML20094D460 + (ML20094D460)
- ML20094D465 + (ML20094D465)
- ML20094D467 + (ML20094D467)
- ML20094D468 + (ML20094D468)
- ML20094D470 + (ML20094D470)
- 05000483/LER-1995-006, :on 951002,plant Had to Be Shutdown Due to Excessive RCS Leakage & FW Isolation Signal Due to High SG Level.Applied Weld Overlay Per ASME Code Case N-504 + (ML20094D472)
- ML20094D473 + (ML20094D473)
- 05000424/LER-1995-005-02, :on 951002,ESF Chillers Inoperability Lead to Unit Operation Per TS 3.0.3.Reset Essential Chiller Instantaneous Overcurrent Relay Trip Setpoints in Both Units + (ML20094D477)
- ST-HL-AE-5223, Clarifies Util Position on NUMARC 87-00 Guidance 4.2.3.1(c) on Page 22 of 48 of Attachment 1 to Th Cloninger Ltr to NRC + (ML20094D481)
- ML20094D484 + (ML20094D484)
- ML20094D488 + (ML20094D488)
- NRC-95-0066, Informs of Deletion of Two Commitments Made in Response to Insp Rept 50-341/93-22 + (ML20094D489)
- ML20094D492 + (ML20094D492)
- ML20094D493 + (ML20094D493)
- ML20094D496 + (ML20094D496)
- ML20094D500 + (ML20094D500)
- ML20094D501 + (ML20094D501)
- B15414, Startup Test Rept for Cycle 13 + (ML20094D505)
- ML20094D510 + (ML20094D510)
- ML20094D512 + (ML20094D512)
- B13988, Requests Relief from ASME Code,Section IX Requirements, Paragraph QW410.7 to Change Frequency & Dwell Time of Oscillation Affect Fracture Toughness by Influencing Heat Input of Vol of Weld Metal Per Unit Length of Weld + (ML20094D517)
- ML20094D519 + (ML20094D519)
- ML20094D530 + (ML20094D530)
- ML20094D534 + (ML20094D534)
- DCL-91-279, Forwards Public Version of Corporate Erpip,Including Rev 11 to 1.1,Attachments (Atts) 4,6,8 & 10,rev 6 to 1.2,ATT 3,rev 2.2 & Rev 5 to 3.1.W/911213 Release Memo + (ML20094D535)
- ML20094D543 + (ML20094D543)
- ML20094D545 + (ML20094D545)
- ML20094D558 + (ML20094D558)
- ML20094D562 + (ML20094D562)
- ML20094D563 + (ML20094D563)
- ML20094D575 + (ML20094D575)
- DCL-84-261, Public Version of Revs to Vol III of San Luis Obispo County Emergency Response Std Operating Procedures (Sop),Including Section III.01, SOP Emergency Svcs Director. W/Felton 840802 Release Memo + (ML20094D577)
- ML20094D579 + (ML20094D579)
- ML20094D581 + (ML20094D581)
- ML20094D585 + (ML20094D585)
- HL-1981, Advises of Change in Designation of Fingerprint Coordinator, Effective 920102.L Mitchell (Manager of Corporate Security) Will Assume Fingerprint Responsibilities.Change Effected to Provide Central Repository for Fingerprints + (ML20094D586)
- ML20094D593 + (ML20094D593)
- ML20094D599 + (ML20094D599)
- ML20094D606 + (ML20094D606)
- HL-1975, Responds to NRC Re Concerns Noted in Insp Rept 50-366/91-22 Re Failure to Implement Limitorque 10CFR21 Recommendations.Corrective Actions:Personnel Counseled & Documentation for 20 motor-operated Valves Reviewed + (ML20094D611)
- ML20094D613 + (ML20094D613)
- ML20094D616 + (ML20094D616)
- ML20094D617 + (ML20094D617)
- ML20094D622 + (ML20094D622)
- ML20094D623 + (ML20094D623)
- ML20094D627 + (ML20094D627)
- RBG-18-295, Final Deficiency Rept DR-165 Re Traceability of Copper Bus Bar,Supplied by Southern Metals Corp & Gulf Coast Supply. Matl Upgraded to Category I & Acceptable in Class IE Equipment.Condition Not Reportable Under 10CFR50.55(e) + (ML20094D631)
- ML20094D633 + (ML20094D633)
- ML20094D636 + (ML20094D636)