ML20094D460
| ML20094D460 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/01/1995 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20094D463 | List: |
| References | |
| GL-88-20, LCV-0590-C, LCV-590-C, NUDOCS 9511060001 | |
| Download: ML20094D460 (2) | |
Text
_ _ - _ _ - _ _ _
Georg,a Powe: Company 40 inverness Center Parkway Post Once Box 1295 Birm.ngham Atabama 35201 Te4ephone 205 877 7'22 m
Georgia Power C. K. McCoy Vce Pres: dent. Nuclear November 1, 1995 L CV-0590-C Docket Nos. 50-424 50-425 U. S Nuclear Regulatory Commission ATTN. De
'ent Control Desk Washingt -
C. 20555 Gentlemen:
\\
VOGTLE ELECTRIC GENERATING PLANT INDIVIDUAL PLANT EXAMINATION OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES In accordance with the requirements of Generic Letter 88-20 and Supplement 4 to the Generic Letter, enclosed is the Individual Plant Examination of External Events (IPEEE)
Report for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. The IPEEE has been completed and documented as requested by the provisions of the Generic Letter. For seismic events, the EPRI developed seismic margins method was utilized. Internal fires were evaluated by performing a Level I fire PRA. High winds, external floods, and transportation and nearby facilities accidents were evaluated by the screening type approach as permitted for plants that meet the 1975 Standard Review Plan criteria. The content and format is presented in accordance with the recommendations of NUREG-1407, Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities.
The major fmding of this examination is that VEGP has no fundamental weaknesses or vulnerabilities to severe accident risk from the exter nal events reviewed in this examination.
OEM 6 5,i' oh p 9511060001 951101 g(h DR ADOCK 05000424
\\\\0 PDR y
9 4
P
.~
O k
GeorgiaI?owerb U. S. Nuclear Regulatory Commission Page 2 Mr. C. K. McCoy states that he is a vice president of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company and that, to the best of his knowledge and belief, the facts set forth in this letter and enclosure are true.
GEORGIA POWER COMPANY By:
[,
O//
~
C. K. Mc[oy Sworn to and subscribed before me this 3/ hy ofb Ol141L
,1995.
CAM Y
l Notary Pub ic CKM/KWK/gmb cc:
Georgia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commissiom Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident inspector, Vogtle LCV-0590-C 700775