Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093E524 + (ML20093E524)
- ML20093E525 + (ML20093E525)
- ML20093E530 + (ML20093E530)
- ML20093E531 + (ML20093E531)
- ML20093E532 + (ML20093E532)
- ML20093E533 + (ML20093E533)
- ML20093E536 + (ML20093E536)
- ML20093E543 + (ML20093E543)
- ML20093E544 + (ML20093E544)
- ML20093E547 + (ML20093E547)
- ML20093E550 + (ML20093E550)
- ML20093E553 + (ML20093E553)
- RC-95-0261, Monthly Operating Rept for Sept 1995 for VC Summer Nuclear Station + (ML20093E556)
- 05000423/LER-1995-016-02, :on 950911,A Train Quench Spray Pump Discharge Valve Exceeded TS Surveillence Periodicity Limit.Caused by Programmatic Error.Surveillance Tracking Procedure Revised + (ML20093E559)
- 05000361/LER-1984-051, :840829,safety Injection Tanks 10 & 7 Inoperable Due to Leakage Through Fill & Drain Valve.Caused by Installation of Valve Fuses on Tank 10 & Nitrogen Cover Pressure Exceeding Limits of Operation + (ML20093E561)
- ML20093E562 + (ML20093E562)
- ML20093E565 + (ML20093E565)
- ML20093E567 + (ML20093E567)
- ML20093E571 + (ML20093E571)
- ML20093E572 + (ML20093E572)
- ML20093E577 + (ML20093E577)
- ML20093E584 + (ML20093E584)
- 3F0584-07, Responds to NRC Re Violations & Deviation Noted in IE Insp Rept 50-302/84-09.Corrective Actions:Surveillance Procedure SP-317 Reperformed Using Other Calibr Instrumentation & RCS Leakage Determined within Spec + (ML20093E596)
- ML20093E599 + (ML20093E599)
- U-120203, Final Deficiency Rept 55-84-05 Re Incorrect Matl Substitutions of Large Bore Pipe.Initially Reported on 840127.Applicant Determined Substitution Issue Not Reportable Under 10CFR50.55(e) + (ML20093E611)
- ML20093E620 + (ML20093E620)
- ML20093E621 + (ML20093E621)
- ML20093E623 + (ML20093E623)
- ML20093E624 + (ML20093E624)
- ML20093E625 + (ML20093E625)
- ML20093E630 + (ML20093E630)
- ML20093E633 + (ML20093E633)
- ML20093E637 + (ML20093E637)
- ML20093E640 + (ML20093E640)
- ML20093E641 + (ML20093E641)
- ML20093E644 + (ML20093E644)
- ML20093E647 + (ML20093E647)
- ML20093E650 + (ML20093E650)
- RBG-42059, Monthly Operating Rept for Sept 1995 for River Bend Station + (ML20093E653)
- L-20-115, CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations + (ML20093E657)
- ML20093E661 + (ML20093E661)
- 05000334/LER-1984-010, :on 840315,hydrogen Recombiner Inoperable Due to Thermal Blower Tripping During Flow Adjustment.Caused by Interference Due to Mispositioned Wire.Wire Repositioned & Maint Personnel Cautioned on Meter Work + (ML20093E662)
- ML20093E666 + (ML20093E666)
- ML20093E673 + (ML20093E673)
- A04078, Forwards Response to Bj Youngblood 840525 Request for Addl Info Re Evacuation During Emergency & Review of FSAR Section 3.9.3.W/one Oversize Drawing.Aperture Card Available in PDR + (ML20093E675)
- ML20093E690 + (ML20093E690)
- 05000413/LER-1984-010-02, :on 840901,reactor Control Rods from More than One Bank Withdrawn at Same Time.Caused by Procedural Deficiency.Main Reactor Trip Breakers Opened.Procedures Revised to Guard Against Similar Occurrences + (ML20093E692)
- ML20093E698 + (ML20093E698)
- ML20093E704 + (ML20093E704)
- 05000364/LER-1984-006, Forwards Pertinent Design Drawings for Diesel Generator 2B, in Response to N Merriweather Request Re LER 84-006-00. Oversized Aperture Card Encl + (ML20093E708)