Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087P025 + (ML20087P025)
- ML20087P028 + (ML20087P028)
- ML20087P029 + (ML20087P029)
- 0CAN128304, Forwards Public Version of Amend 9 to Emergency Plan.W/O Encl.W/Jm Felton 840323 Release Memo + (ML20087P030)
- ML20087P032 + (ML20087P032)
- ML20087P040 + (ML20087P040)
- ML20087P046 + (ML20087P046)
- ML20087P049 + (ML20087P049)
- ML20087P052 + (ML20087P052)
- ML20087P053 + (ML20087P053)
- ML20087P057 + (ML20087P057)
- ML20087P058 + (ML20087P058)
- ML20087P060 + (ML20087P060)
- ML20087P061 + (ML20087P061)
- ML20087P071 + (ML20087P071)
- ML20087P077 + (ML20087P077)
- ML20087P078 + (ML20087P078)
- ML20087P083 + (ML20087P083)
- ML20087P085 + (ML20087P085)
- ML20087P088 + (ML20087P088)
- ML20087P090 + (ML20087P090)
- ML20087P095 + (ML20087P095)
- ML20087P097 + (ML20087P097)
- ML20087P108 + (ML20087P108)
- ML20087P111 + (ML20087P111)
- ML20087P112 + (ML20087P112)
- ML20087P114 + (ML20087P114)
- ML20087P115 + (ML20087P115)
- ML20087P116 + (ML20087P116)
- ML20087P117 + (ML20087P117)
- ML20087P118 + (ML20087P118)
- ML20087P120 + (ML20087P120)
- ML20087P121 + (ML20087P121)
- ML20087P125 + (ML20087P125)
- ML20087P126 + (ML20087P126)
- ML20087P128 + (ML20087P128)
- ML20087P129 + (ML20087P129)
- ML20087P130 + (ML20087P130)
- ML20087P133 + (ML20087P133)
- ML20087P147 + (ML20087P147)
- ML20087P148 + (ML20087P148)
- ML20087P151 + (ML20087P151)
- ML20087P158 + (ML20087P158)
- ML20087P159 + (ML20087P159)
- ML20087P162 + (ML20087P162)
- B11073, Clarifies Info on TMI Action Item II.F.1.6 Re Hydrogen Monitor Measurement Capabilities.Ser & 830314 Confirmatory Order Should Be Revised to Reflect Status.Item Completed + (ML20087P163)
- 0CAN038407, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/84-01 & 50-368/84-01.Corrective Actions:Current Work Planning Staff Being Augmented to Strengthen Maint Planning Function + (ML20087P166)
- ML20087P172 + (ML20087P172)
- 05000370/LER-1984-007, :on 840119,leak Check of in-core Detectors Not Performed within 31 Days Prior to Installation.Caused by Personnel Error & Procedural Deficiency.Procedure Revised. Personnel Counseled + (ML20087P177)
- AECM-84-0177, Responds to IE Bulletin 83-08, Electrical Circuit Breakers...Reactor Trip Sys. GE Confirmation of Supplying Eight safety-related Breakers W/Undervoltage Trip Features Still Pending.Extension Until 840601 Requested + (ML20087P182)
- 0CAN038406, Responds to NRC Re Violation & Deviation Noted in IE Insp Repts 50-313/83-34 & 50-368/83-34.Corrective Actions:Instrument Removed from Controlled Access,Tagged Out of Svc & Recalibr W/O Adjustment + (ML20087P184)