Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000263/LER-1995-003-01, :on 950328,pipe & Cable Tray Supports Found Anchored to Shoring Plates Rather than Embedded Plates. Caused by Error in Original Const.Supports Modified or Analyzed & Meet Code Requirements + (ML20087H486)
- 0CAN049510, Submits Drug Testing Lab Performance Rept + (ML20087H488)
- ML20087H489 + (ML20087H489)
- ML20087H490 + (ML20087H490)
- ML20087H492 + (ML20087H492)
- AECM-84-0183, Forwards Description of Tech Spec Review Program,Per 840224 Request.Program Estimated to End on 840406.Formal Response Expected by 840409 + (ML20087H493)
- ML20087H495 + (ML20087H495)
- ML20087H497 + (ML20087H497)
- ML20087H498 + (ML20087H498)
- ML20087H501 + (ML20087H501)
- JAFP-95-0198, 1994 Radiological Environ Operating Rept Ja FitzPatrick Nuclear Power Plant + (ML20087H504)
- ML20087H505 + (ML20087H505)
- ML20087H507 + (ML20087H507)
- NRC-95-0045, Annual Radiological Environ Operating/ Monitoring Rept + (ML20087H512)
- ML20087H513 + (ML20087H513)
- ML20087H514 + (ML20087H514)
- 05000458/LER-1993-002, :on 930212,TS SR Not Properly Implemented in Logic Sys Functional Tests.Caused by Less than Adequate Reviews During Procedure Development Stage.Established Procedural Requirements + (ML20087H515)
- RBG-41475, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/95-11 on 950307-10.Corrective Actions:Maint Supervision Has Screened Preventive Maint Tasks Prior to Releasing Packages to Workers + (ML20087H517)
- ST-HL-AE-5073, Failure to Meet Requirements of TSs Due to Not Testing One Contact of Load Sequencer Relay + (ML20087H520)
- 05000498/LER-1995-004, :on 950328,failed to Meet Requirements of TS Due to Not Testing Contact of Load Sequencer Relay.Assembled Surveillance Credit Package for All Trains of Engineered Safety Features Diesel loss-of-offsite-power Surveillances + (ML20087H529)
- RBG-17198, Forwards Responses to Power Sys Branch Request for Addl Info Re Matl Contained in 831230 & 840210 Correspondence, Including Diesel Generator Operations Training & Fuel Oil Storage Tank.Changes Will Be Incorporated in FSAR Amend + (ML20087H530)
- ST-HL-AE-4982, Provides Addl Info Re Thermo-Lag Related Ampacit Derating. Encl Withheld + (ML20087H534)
- ML20087H540 + (ML20087H540)
- ML20087H542 + (ML20087H542)
- ML20087H544 + (ML20087H544)
- ML20087H548 + (ML20087H548)
- ML20087H549 + (ML20087H549)
- ML20087H550 + (ML20087H550)
- ML20087H551 + (ML20087H551)
- ML20087H554 + (ML20087H554)
- ML20087H557 + (ML20087H557)
- ML20087H560 + (ML20087H560)
- L-95-014, TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2 + (ML20087H561)
- 3F0895-15, Special Rept 95-01:on 950630,ODCM Required Waste Gas Analyzer (WGDA-1) Declared Inoperable & Unavailable for Greater than Seven Days Due to Deficiency in Microprocessor. Microprocessor Replaced & WGDA-1 Returned to Operation + (ML20087H566)
- 05000271/LER-1995-004, :on 950329,repair of Inoperable Vital Fire Barrier Penetration Fire Seal Was Incomplete.Caused by Work Control Process Failure.Established Continuous Fire Watch on One Side of Fire Barrier + (ML20087H567)
- ML20087H570 + (ML20087H570)
- ML20087H571 + (ML20087H571)
- LIC-95-0097, Forwards Corrected Versions of Response to NRC RAI Re Rv Structural Integrity & Updated Info on Weld Chemical Content,Estimated Fluence Projected Rtpts & Projected Use for FCS Rv Submitted by Util + (ML20087H572)
- 3F0495-05, Updates NRC Re Related Actions That FPC Performed Since Svc Water Sys Operational Performance Assessment Conducted from 941003-1110.Summary of Major Actions Taken or Planned in Stated Broad Categories Encl + (ML20087H575)
- ML20087H576 + (ML20087H576)
- ML20087H577 + (ML20087H577)
- ML20087H581 + (ML20087H581)
- ML20087H586 + (ML20087H586)
- ML20087H587 + (ML20087H587)
- NG-95-2546, Notifies That Actions Described in First Paragraph of Item I of GL 89-10 Completed + (ML20087H590)
- ML20087H594 + (ML20087H594)
- ML20087H607 + (ML20087H607)
- ML20087H609 + (ML20087H609)
- NRC-95-4444, Provides Westinghouse AP600 Long Term Cooling Test Facility Scaling Rept + (ML20087H612)
- ML20087H620 + (ML20087H620)
- RC-95-0107, Responds to 950316 Conference Call Between Plant,Nrc Project Manager & Idaho Falls.Informs That 10CFR50.55 Allows NRC to Grant Relief from Applicable ASME Code Requirements Provided Requestor Demonstrates Compliance W/Specified Requiremen + (ML20087H621)