_ _ _ _ _

q,-

y Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 j

l i

April 26,1995 Generic Letter 89-10 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT l

Docket No. 50-263 License No. DPR-22 Commitments Conceming NRC Inspection Report 50-263/95003 for closure of NRC Generic Letter 89-10, " Safety-Related Motor-Operated Valve Testina and Surveillance" Generic Letter 89-10 (June 28,1989), " Safety-Related Motor-Operated Valve Testing and Surveillance" requested holders of operating licenses to provide additional assurance of the l

capability of safety-related motor-operated valves (MOVs) and position-changeable MOVs in safety-related systems. An inspection to verify the completeness of licensee commitments made in response to Generic Letter 89-10 was conducted by Sonia Burgess, and others of the NRC Region - Ill Staff, during the period of April 17 - 21,1995 (NRC Inspection Report No. 50-263/95003). During this on-site inspection, enhancements to the Monticello MOV Program (the Monticello program to address the issues and concems identified in Generic Letter 89-10 and its supplements) were identified. In order to support timely closure of Generic Letter 89-10 issues for the Monticello plant, the following commitments to the NRC are established to incorporate the identified enhancements:

1.

A minimum of nine (9) supplemental (non baseline) differential pressure tests will be performed prior to the end of the third refueling outage following this inspection. Information will be collected and assessed in accordance with the MOV program document.

2.

Periodic Verification frequency will be increased to once per cycle for Recirculation Pump discharge valve MO-2-53B until the performance margin can be increased to greater than 25E 3.

The stem lubrication degradation study will be enhanced by increasing the sample size from the present 6 tests to a minimum of 10 tests.

9505030482 950426 PDR ADDCK 05000263 0

PDR g(p 0

k-3 c,.

t USNRC NORTHERN STATES POWER COMPANY April 26,1995 Page 2 Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

.h/>lkon

/f Williarn J Hill-Plant Manager Monticello Nuclear Generating Plant c:

Regional Administrator-Ill, NRC NRR Project Manager, NRC t

Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg b

e I

[$

A

.e-q.4 e ; g) '

)

TRANSMITTAL MANIFEST I

i NORTHERN STATES POWER COMPANY;

}

NUCLEAR 1.lCENSING DEPARTMENT l

MONTICELLO NUCLEAR GENERATING PLANT '

- Commitments Concoming NRC Inspechon Report 50-263/95003

'i for Closure of NRC Generic Letter 89-10 " Safety-Related t

Mgior-Operated Valve Testina and Surveillance" '

Correspondence Date:_ April 27,1995 l

i

- Monticello Intemal Site Distribution Special Instructions Kaleen Hilsenhoff......USAR File.................Yes_x_ No Steve Ludders..........NRC Commitment.....Yes_x_ No -

Lila imholte............... Monti OC Sec..........Yes No_x_ - 11, No dist to OC members below if YES i

Mel Opstad............... Monti SAC Sec..........Yes No_x_ - 5

{

  1. Mail Room.............. Monti Posting............Yes No_x_ - 7

)

Monticello Intemal Site Distribution:

  • Monti Document Control File J C Grubb, NGSS, OC.

W J Hill, Plant MGR, SAC, OC L L Nolan, GSSA, OC C A Schibonski, GSE, OC B D Day, MGR MTC, OC M F Hammer, GSM, OC W A Shamla, NQD J E Windschill, GSRS, OC Monti Site Lic File M W Onnen, GSO, OC Steve Ray, SR Res insp, NRC Tom Fallgren NSP Intemal Distribution -

)

E L Watzi R O Anderson, Dir LMI, SAC Mike Wadley, Pl T E Amundson, Dir NQD, SAC Rick Wirkkala, Pl Communications Dept Yes No_x__

j Extemal NSP Distribution

'{MgRg}

Kris Sanda, State of Minn i

Regional 1dmin-lli,NRC J E Silberg

'l T J Kim, NRR-PM, NRC Sonia Burgess, NRC Region 111 i

  • Advance Distribution made by Site Licensing l

i Manifest Date: April 27,1995 i

I i

i

+ '

i, 4

l