Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087A258 + (ML20087A258)
- ML20087A260 + (ML20087A260)
- ML20087A268 + (ML20087A268)
- ML20087A269 + (ML20087A269)
- ML20087A270 + (ML20087A270)
- 05000277/LER-1991-039, :on 911206,excessive Leakage Noted in RHR Sys B Loop Injection Check Valve &/Or Associated Bypass Valve. Caused by Obstruction in Valve Seating Area.Valve Disassembled & Repaired + (ML20087A272)
- ML20087A287 + (ML20087A287)
- ML20087A296 + (ML20087A296)
- RC-95-0192, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-395/95-09.Corrective Actions Addressed in Attached Ler.W/O LER + (ML20087A303)
- 05000445/LER-1991-029, :on 911204,handswitch Positions for Steam Supply Valves Left in pull-to-lock After Entering Mode 3, Defeating Automatic Function of Valves,Per TS 3.0.4.Caused by Personnel Error.Personnel Counselled + (ML20087A313)
- 05000395/LER-1995-003, :on 950421,vol in Na Hydroxide Storage Tank Was Above TS Limits Due to Inadequate Procedural Guidance. Operations Personnel Drained Approx 60 Gallons from Tank to Restore Level to Middle of Specified Range + (ML20087A316)
- ML20087A319 + (ML20087A319)
- 05000354/LER-1991-020-01, :on 911207,personnel Received Indication of HPCI Isolation During Steam Line Warmup Following HPCI Outage.Caused by Improper Wiring of Temp Detector.Wiring Corrected & Delta-T Circuits Inspected + (ML20087A322)
- 05000445/LER-1991-031, :on 911206,containment Ventilation Isolation Automatically Occurred Due to Overconservative Radiation Monitor Setpoint.Alarm Setpoint Recalculated & Procedure for Radioactive Effluent Releases Will Be Reviewed + (ML20087A332)
- ML20087A342 + (ML20087A342)
- ML20087A354 + (ML20087A354)
- ML20087A363 + (ML20087A363)
- ML20087A364 + (ML20087A364)
- ML20087A375 + (ML20087A375)
- ML20087A376 + (ML20087A376)
- ML20087A383 + (ML20087A383)
- ML20087A400 + (ML20087A400)
- ML20087A402 + (ML20087A402)
- ML20087A414 + (ML20087A414)
- ML20087A415 + (ML20087A415)
- ML20087A418 + (ML20087A418)
- NLS9100800, Informs That All Mods Associated W/Item I.D.1 of Suppl 1 to NUREG-0737 Completed Prior to Startup from 1991 Refueling Outage Which Ended on 911217 + (ML20087A425)
- ML20087A426 + (ML20087A426)
- ML20087A433 + (ML20087A433)
- 05000285/LER-1991-029, :on 911202,deficiency Discovered in Personnel Air Lock Leak Rate Testing & Procedure.Caused by Past Inadequate Procedure Change Reviews.All Type B Leak Rate Test Procedures Will Be Reviewed + (ML20087A442)
- 05000333/LER-1991-028, :on 911128,reactor Shutdown & Cooldown Was Not Completed within Time Required.Caused by Personnel Error. Operating Procedure 65 Will Be Revised & Event Will Be Discussed W/Licensed Operators + (ML20087A445)
- ML20087A448 + (ML20087A448)
- 05000302/LER-1991-017, :on 911202,quadrant Power Tilt Exceeded Steady State Limit in TS & Reactor Tripped on High Pressure.Caused by Incorrect Operator Training & Lack of Cautions in Procedure.Lesson Plan Revised + (ML20087A450)
- 05000298/LER-1991-018, :on 910323,4160 Volt Circuit Breaker 1CN Failed to Open Upon Actuation of Breaker Control Switch Roller Mechanism.Caused by Hardened Lubricant.Trip Latch & Cam Rollers of All 4160 Volt Breakers Removed + (ML20087A458)
- ML20087A464 + (ML20087A464)
- 0CAN129106, Requests Extension of Completion Date to Review Fire Penetration Seals from 911231 to 920331.Extension Needed to Review Existing & Recently Conducted Vendor Fire Test Repts + (ML20087A467)
- ML20087A473 + (ML20087A473)
- ML20087A484 + (ML20087A484)
- ML20087A486 + (ML20087A486)
- ML20087A488 + (ML20087A488)
- TXX-9130, Final Deficiency Rept CP-90-07 Re Safeguards Bldg Overtemp Condition.Initially Reported on 900608.Unit 1 Design Mods Incorporated Into Unit 2 Piping Insulation Spec + (ML20087A495)
- ML20087A503 + (ML20087A503)
- JPN-92-001, Responds to Diagnostic Evaluation Team Rept,Provided Via NRC .Five Major Initiatives Will Be Undertaken Re Capital Improvements,Mgt Changes,Engineering Organizational Changes & Nuclear Generation Business Plan + (ML20087A507)
- ML20087A509 + (ML20087A509)
- ML20087A512 + (ML20087A512)
- ML20087A514 + (ML20087A514)
- ML20087A519 + (ML20087A519)
- ML20087A520 + (ML20087A520)
- ML20087A526 + (ML20087A526)
- ML20087A528 + (ML20087A528)
- ML20087A529 + (ML20087A529)