Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083N135 + (ML20083N135)
- 05000318/LER-1983-005, Forwards LER 83-005/03L-0 + (ML20083N139)
- ML20083N149 + (ML20083N149)
- 05000318/LER-1983-005-03, /03L-0:on 830107,during Surveillance Testing, Shutdown Cooling Flow Lost.When Circulation Actuation Signal Manually Initiated,Operating Low Pressure Safety Injection Pump Stopped.Caused by Inadequate Procedure + (ML20083N157)
- 05000324/LER-1982-135-03, /03L-0:on 821227,low Pressure Microswitch of Primary Containment Isolation Sys HPCI Steam Supply Pressure Instrument 2-E41-PSL-N001D Would Not Actuate During Test PT-02.1.2P.Caused by End of Component Life + (ML20083N166)
- ML20083N175 + (ML20083N175)
- ML20083N178 + (ML20083N178)
- ML20083N182 + (ML20083N182)
- ML20083N183 + (ML20083N183)
- ML20083N185 + (ML20083N185)
- ML20083N191 + (ML20083N191)
- ML20083N192 + (ML20083N192)
- ML20083N193 + (ML20083N193)
- ML20083N194 + (ML20083N194)
- 05000395/LER-1982-064, Forwards LER 82-064/03L-0.Detailed Event Analysis Encl + (ML20083N195)
- ML20083N199 + (ML20083N199)
- ML20083N206 + (ML20083N206)
- ML20083N208 + (ML20083N208)
- ML20083N209 + (ML20083N209)
- ML20083N214 + (ML20083N214)
- ML20083N215 + (ML20083N215)
- ML20083N218 + (ML20083N218)
- ML20083N219 + (ML20083N219)
- 05000395/LER-1982-064-03, /03L-0:on 821223,nuclear Sampling Sys Valves 9398A (B) Failed to Close within Required Isolation Time Identified in Surveillance Requirement 4.6.4.3.Caused by Crud Buildup on Valve Seats.Crud Buildup Dislodged + (ML20083N222)
- ML20083N225 + (ML20083N225)
- ML20083N228 + (ML20083N228)
- ML20083N234 + (ML20083N234)
- ML20083N237 + (ML20083N237)
- ML20083N239 + (ML20083N239)
- ML20083N243 + (ML20083N243)
- ML20083N244 + (ML20083N244)
- B11115, Forwards Amend 7 to Environ Rept,Providing Responses to All Remaining Review Questions & Updates & Corrections to Info in Environ Rept + (ML20083N246)
- ML20083N248 + (ML20083N248)
- ML20083N252 + (ML20083N252)
- ML20083N255 + (ML20083N255)
- ML20083N256 + (ML20083N256)
- 05000325/LER-1982-044, Forwards Updated LER 82-044/03L-2 + (ML20083N257)
- RBG-14-208, Interim Deficiency Rept DR-89 Re Malfunction of Primary knife-type Disconnect Mfg by Rte Delta Corp.Initially Reported on 821222.Addl Info Provided in Manufacturer .Investigation Continuing.Next Rept Expected by 830317 + (ML20083N259)
- ML20083N261 + (ML20083N261)
- ML20083N262 + (ML20083N262)
- ML20083N263 + (ML20083N263)
- ML20083N264 + (ML20083N264)
- ML20083N265 + (ML20083N265)
- ML20083N266 + (ML20083N266)
- ML20083N274 + (ML20083N274)
- ML20083N276 + (ML20083N276)
- ML20083N284 + (ML20083N284)
- ML20083N285 + (ML20083N285)
- ML20083N286 + (ML20083N286)
- NRC-95-0047, Comment on GL, Pressure Locking & Thermal Binding of Safety Related Power-Operated Gate Valves. Draft GL Should Be Revised to Permit Some Use of Plant Operating Experience as Basis for Engineering Judgement + (ML20083N289)
- ML20083N298 + (ML20083N298)