' s,,
o l OUISIANA P O W E R & L i G H T.! 242 oEtAnoNoe sinEer R O. BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345 uTiuTIES SYSTEM April 5, 1984 W3K84-0817 Q-3-A35.07 T r @SDWM T m
[J!!
APR I 31984 Mr. John T. Collins Regional Administrator, Region IV y
U. S. Nuclear Regulatory Commission h,
8 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
Telecon C. Hooper (LP&L) and W. Crossman (NRC IV) on February 15, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Potentially Reportable Deficiency No. 153
" Boston Insulated Wire and Cable Company (BIWC), QA Program Deficiencies" Final Report On February 15, 1984, a problem with the subject Vendor's Quality Assurance Program was reported as PRD No. 153.
Further evaluation of the previously described condition indicates this condition is not considered reportable pursuant to 10CFR50.55(e).
EVALUATION Investigation into results of the audit conducted in January 1984 and a reaudit of BIWC in March 1984 identified the following:
The January 1984 audit was terminated early due to a blizzard being a.
imminent. No post audit conference was conducted for presentation of the auditors concerns due to a lack of availability of management personnel.
b.
A reaudit in March 1984 verified the Vendors' program to be satisfactory and B.I.W.C. was reinstated'on the Qualified Suppliers List.
Additionally, those concerns from the January 1984 audit were presented '
to BIWC management who were able to satisfactorily answer the concerns.
8404190102 840405 1 E~17 PDR ADOCK 050003B2
_S-PDR
~
w.
.y Mr. John T.-Collins April 5, 1984 W3K84-0817 Page 2 If the January 1984 audit had contained a post audit conference with BIWC management, the concerns would have been resolved at that time as verified by the March 1984 reaudit. Therefore, this item is considered not reportable.
Very truly yours, T. F. Gerrets Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20355 Director.
Office of-Management Information and Program Control U. S. Nuclear Regulatory Commission Washington,~D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130
' Records Center Institute of Nuclear-Power Operations 1100 circle.75 Parkway, Suite _1500' Atlanta, Georgia 30339 Mr. W. A. Cross-7910 Woodmont= Avenue Suite 1200 Bethasda, Maryland.
20814
-o'"
a