s Attachment to TXX-95128 Page 1 of 10 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
05/10/1995 COMPLETED BY:
Ed Sirols TELEPHONE:
817 897 5664 OPERATING STATUS 1.
REFORTING PERIOD: APRIL 1995 GROSS HOURS IN REPORTING PERIOD: 719 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
- DESIGN ELECTRICAL RATING (MWe-Net): 1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 354 1,846 33,059 6.
REACTOR RESERVE SHUTDOWN HOURS O
O 2,440 7.
HOURS GENERATOR ON LINE 278 1,768 32,514 8.
UNIT RESERVE SHUTDOWN HOURS O
O O
9.
GROSS THERMAL ENERGY GENERATED (MWH) 697,466 5,737,572 104,672,678
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 224,340 1,917,756 34,814,383
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 201,915 1,825,332 33,188,779
- 12. REACTOR SERVICE FACTOR 49.3 64.1 80.0
- 13. REACTOR AVAILABILITY FACTOR 49.3 64.1 85.9
- 14. UNIT SERVICE FACTOR 38.6 61.4 78.7
- 15. UNIT AVAILABILITY FACTOR 38.6 61.4 78.7
- 10. UNIT CAPACITY FACTOR (USING MDC) 24.4 55.1 69.8
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 24.4 55.1 69.8
- 18. UNIT FORCED OUTAGE RATE 10.1 1.8 4.6 l
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, A *!D DURATION OF EACH) :
Refueling Outage began March 4,1995 and ended April 18,1995.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE GC STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED 9505220306 950515 PDR ADOCK 05000445 R
p-Attachment to TXX 95128 Page 2 of 10 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897-5664 MONTH : APRIL 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 30 4
0 20 213 5
0 21 279 6
0 22 474 7
0 23 782 8
0 24 856 9
0 25 856 10 0
26 939 11 0
27 1099 12 0
28 1099 13 0
29 1101 14 0
30 1107 a
15 0
31 16 0
Attachment to TXX 95128 Page 3 of 10
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50-445 UNIT:
CPSES1 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897 5664 MONTH : APRIL 1995 DAY TIME REMARK / MODE 04/01 0000 Unit started the month in MODE 6.
04/02 0134 Unit entered MODE 5.
04/11 2102 Unit entered MODE 4.
04/13 0930 Unit entered MODE 3.
04/16 0532 Unit entered MODE 2.
04/17 2308 Unit entered MODE 1.
04/18 0107 Unit synchronized to the grid.
0502 Unable to establish feed flow due to a stuck closed Feedwater Bypass isolation Valve 1FW-0207. Unit taken off line and entered MODE 2.
04/19 1309 Feedwater Bypass isolation valve repaired and Unit entered MODE 1.
1415 Unit synchronized to the grid.
04/26 2200 Unit restored to full power, 04/30 2400 Unit ended the month in MODE 1 I
u Attachment to TXX 95128.
Page 4 of 10
^
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH 2
DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
05/10/1995 i
COMPLETED BY:
Ed Sirois i
TELEPHONE:
817/897-5664 MONTH : APRIL 1995 DAY TIME REMARK / MODE e
Fourth Refuelina Outaae Maior Work Scone
-Main Transformer 1MT2 Replacement
-Reactor Coolant Pump 1-04 Motor Changeout
-Upgrade of all four Reactor Coolant Pump Cartridge Seals
-Snubber Functional Testing
-Train A RHR Pump Coupling Design Modification Containment Spray Pumps (all four) Impeller Changeout
-Eddy Current Testing of Steam Generators 2 & 5
-Sludge Lancing of all four Steam Generators Trains A & B Diesel Generator Maintenance inspections
-Local Leak Rate Testing
-Core Funnel Inspections b
-HP Turbine Stop & Control Valve Inspections
-LP Turbine Stop & Control Valve Testing Eddy Current Testing of LP Turbine Blades
-Repair Groove on Main Generator Shaft
-RCS Check Valve Seat Leakage Testing l
-Train A & B Integrated Test Sequence h
t E
6
{
I b
l
.vv
.e..
-m-
~
,..m.e r.,---
x.-
~
Attachment to TXX-95128 -
Page 5 of 10 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897-5664 REPORT MONTH : APRIL 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON
- REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 1
950401 S
408.00 C
1 Refueling outage (1RFO4) continue.
2 950418 F
33.22 A
1 Repaired Feedwater Bypass isolation Valve.
- 1) REASON
- 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) -
3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)-
_g-F
-wM-9 n
te py-imumv-9y*-W 1--
W-w9-Ta M
m W
e
~
Attachment to TXX 95128 Page 6 of 10 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897 5664 OPERATING STATUS 1.
REPORTING PERIOD: APRIL 1995 GROSS HOURS IN REPORTING PERIOD: 719 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
- DESIGN ELECTRICAL RATING (MWe-Net): 1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 719 2,879 11,997 6.
REACTOR RESERVE SHUTDOWN HOURS O
O 2,154 7.
HOURS GENERATOR ON LINE 691 2,851 11,791 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERG.' GENERATED (MWH) 2,291,023 9,595,445 36,895,370
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 775,489 3,269,401 12,425,456
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 742,238 3,140,750 11,835,706
- 12. REACTOR SERVICE FACTOR 100.0 100.0 78.0
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 92.8
- 14. UNIT SERVICE FACTOR 96.1 99.0 77.3
- 15. UNIT AVAILABILITY FACTOR 96.1 99.0 77.3
- 16. UNIT CAPACITY FACTOR (USING MDC) 89.8 94.9 67.5
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 89.8 94.9 67.5
- 18. UNIT FORCED OUTAGE RATE 3.9 1.0 9.6
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
Attachment to TXX 95128 Page 7 of 10 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897 5664 MONTH : APRIL 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1118 17 1113 2
1117 18 1114 3
1111 19 1114 4
1113 20 1116 5
1116 21 1118 i
6 1118 22 1118 7
1116 23 1116 8
1100 24 1116 4
9 849 25 1118 10 8
26 1117 11 167 27 1115 12 945 28 1115 13 1116 29 1116 14 1117 30 1118 15 1119 31 16 1118
. + -
J Att:chment to TXX-96128 -
' Page 8 of 10 i
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817/897-5664 MONTH : APRIL 1995 DAY TIME REMARK / MODE 04/01 0000 Unit started the month in MODE 1.
04/10 0504 As a result of a latching mechanism failure on tha turbine overspeed device, the plant was taken off line and maintained in Mode 2 for repairs. Replaced the
'i overspeed trip device release-mechanism connecting rods.
04/11 0726 Unit returned to MODE 1.
0926 Unit synchronized to grid.
04/12 1500 Unit restored to full power.
04/30 2400 Unit ended the month in MODE 1.
P h
d' 4
y 4
l
~ -
Attachment to TXX-95128 Page 9 of 10
+
UNIT SHUTDOWNS AND POWER REDUCTIONS I
DOCKET NO.:
50-446
. UNIT:
CPSES 2 DATE:
05/10/1995 COMPLETED BY:
Ed Sirois 1
TELEPHONE:
- 817/897-5664 REPORT MONTH : APRIL 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 2
950410 F
28.37 A
1 Latching device failure. See previous page.
l i
- 1) REASON
' 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM j
D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) t t
m
_..,y--
e. -,
4
-s.
>,