g OPERATIN8 DATA REPORT DOCKET NO 50-369-DATEMay 15. 1995 DPERATINS STATUS CCMPLETED BY R.A. Williams
~
TELEPH0flE 704-382-5346
- 1. Unit Nase: McGuire 1 2.' Reporting Period: April 1, 1995-April 30, 1995
- 3. Licensed Thersal Power (MWti 3411
- 4. Naseplate Rating (6ross MWelt 13056 Notes *Naseplate Rating
- 5. Design Electrical Rating (Net FWe):
1180 (Gross MWel calculated as
- 6. Maximus Dependable Capacity (Gress MWels 1171 1450.000 MVA
.90 power
- 7. Marlaus Dependable Capacity (Net MWe):
1129 factor per Page ill,
- 8. If Changes Occur in Capacity Ratings (Itess Nusber 3 through 71 Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWel
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Cate Cuaulative
- 11. Hours in Reporting Period 719.0 2879.0 117575.0
- 12. Nusber Of Hours Reactor Was Critical 719.0 2848.7 83208.1
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Benerator On-Line 719.0 2839.5 82352.1
- 15. Unit Resene Shutdown Hours - - -
- 16. Gross Thersal Energy 6enerated (MWH) 2448229 9630657 257453083
- 17. Gross Electrical Erergy Generated (MWH) 842615 3332706 88484429
- 18. Net Electrical Energy Generated (MWH) 8108B2 3200205 84515573
- 19. Unit Service Factor 100.0 98.6 70.0
- 20. Unit Availability Factor 100.0.
98.6 70.0
- 21. Unit Capacity Factor (Using MDC Natl 99.9 98.7 62.6
- 22. Unit Capacity Factor (Using DER Net) 95.6 94.4 60.9
- 23. Unit Forced Outage Rate 0.0 1.4 14.1
- 24. Shutdown Scheduled 2ver Next 6 Months (Type, Date, and Duration of Each):
None i
- 25. If Shut Down At End Of Report Perled. Istimated Date of Startup:
- 26. Units in Test Status (Prior to Cossercial Operation):
Forecast Achieved INiilAL CRITICALITY INiilAL ELECTRICITY COMERCIAL OPERATION 9505220285 950515
~
PDR ADOCK 05000369 R
1 OPERAi!N6 DATA REPORT DDCKET NO 50-369 UNIT McGuire 1 DATE May 15,1995 COMPLETED BY R.A. Williani TELEPHONE 704-382-5346 MONTH April. 1995 M1 AVERAGE DAILY POWER LEVEL DAl AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-Net) 1 1129 17 1129 2
1128 10 1128 3
1128 19 1120 4
1130 20 1128 9
1129 El 1129 6
1128 22 1127 7
1131 23 1122 8
1133 24 1122 9
1134 25 1124 10 1132 26
!!22 11
!!28 27 1126 12 1131 28 1123 13 1131 29 1119 14 1128 30 1124 13 1129 16 1130
UNIT SHUTDOWNS RND POWER REDUCTIONS DOCKET NO.
50-369-UNIT NAME nwulat. 1 DATE ud/1d/93 REPORT MONTH April 1995 COMPLETED BY x.
A.
Williams.
TELEPHONE t/usi-sez-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulaton Restriction 4-Other (Explain)
File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same source H-Other (Explain)
.o m
.... =.
1 k
i 1
l DOCKET: 50-369 UNIT: McGuire 1 i
Date:
05/15/95
]
NARRATIVE
SUMMARY
MONTH: April 1995 McGuire Unit 1 began the month of April operating at 100% full power.'The unit
)
operated at or near 100% full power for the entire month.
1
.l l
i
)
l i
i l
Prepared by:
R.
A. Williams
.j Telephone: (704)-382-5346 1
ll f
~
J MONTHLY REFUELING INFORMATION REOUEe,T 1.
Facility name: McGuire.
Unit 1 2.
Scheduled next refueling shutdown: December 1995 3.
Scheduled restart following refueling January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 151 8.
Present licensed fuel pool capacity:.1463 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodated by j
present licensed capacity: March 2006 DUKE POWER COMPANY DATE: Mav 15. 1995 Wame of
Contact:
R.
A.
Willinma Phone:
f7041-382-5346
n
(
.C OPERATING DATA PEPORT DOCKET NO-50-370 DATE May 15. 1995 OPERATIMESTATUS COMPLETEDBY R.A. Williams' TELEPHONE 704-382-5346 e
- 1. Unit Nase: McGuire 2 i
- 2. Reporting Period: April 1, 1995-April 30, 1995
- 3. Licensed Thereal Power (MNt):
3411
- 4. Naseplate Rating (6ross MWel 13056 Notes eNaseplate Rating
- 5. Design Electrical Rating (Net MWelt 1180 (6ross MWel calculated as
- 6. Maxieus Dependable Capacity (6 toss MWe):
1171 1450.000 MYA x.90 power
- 7. Maxieus Dependable Capacity (Net MWeh 1129 factor per Page lit, l
S. If Changes Occur in Capacity Ratings (Itees Nueber 3 Through 71 Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
10.ReasonForRestrictions,ifany:
This Month Yr.-to-Date Cueulative
- 11. Hours In Reporting Period 719.0
.2879.0 97871.0
- 12. Nueber Of Hours Reactor Was Critical 585.8 2503.9 76056.7
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
.--0---
- 14. Hours Generator On-line 581.2 2453.2 75037.8 13.UnitReserveShutdownHours
--0--
--0--
~0--
16.GrossTherealEnergyBenerated(MWH) 1953193 8196577 246041991'
- 17. Gross Electrical Energy Generated (MWH) 681837
'2866397-85913995
- 18. Net Electrical Energy Generated (MWH) 653409 2752841 82375187
- 19. Unit Service Factor 80.8 85.2 76.7
- 20. Unit Availability Factor 80.8 85.2 76.7
- 21. Unit Capacity Factor (Using MDC Net) 80.5 84.7 73.8'
- 22. Unit Capacity Factor (Using DER Net) 77.0 81.0 71.3
- 23. Unit Forced Outage Rate 19.2 6.1 6.6 -
- 24. Shutdoen Scheduled Over West 6 Months (Type, Date, and Duration of Eacht:
None
- 25. If Shut Bonn At End Of Report Period. Estiaated Date of Startups
-26. Units in Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCRITICALITy INITIAL ELECTRICITY COMftERCIAL OPERATION
i,.
L.
t OPERATING DATA REPORT DOCKET ND 50-370 lm!T McGuire 2 DATE May 15. 1995 COTLETED BY R.A. Willines TELEPHONE 704-302-5346 MONTH Aoril,1995 E
AVERAGE DAILY POWER LEVEL LA1 AVERAGE DAILY POWER LEVEL (Me-Wel)
(Me-Neil 0
17 1149 2.
0 18 1148 3
0 19 1149 4
0 20 1148 5
0-21 1149 6
19 22 1147 7
9'1 23 1141 8
!!47 24 1142 9
1152 25 1144 10
!!51 26 1143 1147 27 1145 12 1150 28 1143 13 1151 29 1139 14 1146 30 1145 15 1148 16 1149 1
- _1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370
~
UNIT NAME^ Mwuix5 2 DATE ud/1d/93 REPORT MONTH April 1995 COMPLETED BY K.
A.
Williams-TELEPHONE (sus;-3e2-d346 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT T FJ4 COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2
95 1 F
137.83 A
CF VALVEX RESIDUAL HEAT REMOVAL CONTROL VALVE LEAK (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent U Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative
-(5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
e 4
DOCKET: 50-370 UNIT:
McGuire 2 Dates. 05/15/95 NARRATIVE
SUMMARY
MONTH: April 1995 McGuire Unit'2 began the month of April in a outage due to a residual heat removal control valve leak. The unit was placed on-line 04/06/95 at 1850. The unit returned to 100% full power on 04/07/95 at 2330 and operated at or near 100% power the remainder of the month.
Prepared by: R. A. Williams Telephsne: (704)-382-5346
A MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire.
Unit 2 2.
' Scheduled next refueling shutdown: April 1996 3.
Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date (s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pools all 8..Present licensed fuel pool capacity: 1463 Size of requested or planned increases 9.
Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
May 15.
1995 Name of
Contact:
R.
A.
Willinmn Phone:
(7041-392-5346 I
m-e-