Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000219/LER-1983-019-03, /03L-0:on 831114,during Surveillance of Standby Gas Treatment Sys,Reactor Bldg Ventilation Valve V-28-22 Failed to Close on Isolation Initiation Signal.Caused by Piece of Piston Breaking Off.Piston Repaired + (ML20083F093)
- 05000387/LER-1983-152-01, /01T-0:on 831201,engineering Found Analyzed Drawdown Time of Secondary Containment to Be Longer than 60 FSAR Limit.Cause Unknown.Substantial Testing & Possible Mods Being Pursued + (ML20083F098)
- 05000220/LER-1983-044-01, /01T-0:on 831128,reactor Bldg Penetration Found Unsealed.Caused by Shrinking of Sealing Matl Forced Out of Penetration Due to Pressure Differential.Fire Watch Established.Penetration Resealed + (ML20083F104)
- 05000272/LER-1983-059-03, /03L-0:on 831128,air Lock Interior Door at Elevation 130 Ft Exhibited Leakage Rate Greater than Allowed by Tech Specs.Caused by Outer Seal of Interior Door Not Seated Properly in Groove.Personnel Retrained + (ML20083F105)
- ML20083F107 + (ML20083F107)
- ML20083F108 + (ML20083F108)
- ML20083F111 + (ML20083F111)
- ML20083F112 + (ML20083F112)
- ML20083F114 + (ML20083F114)
- ML20083F121 + (ML20083F121)
- ML20083F122 + (ML20083F122)
- ML20083F123 + (ML20083F123)
- ML20083F125 + (ML20083F125)
- 05000272/LER-1983-058-03, /03L-0:on 831118,air Lock Exterior Door Exhibited Leakage Rate Greater than Allowed by Tech Specs.Air Lock Declared Inoperable.Caused by Loose Door Latch Assembly.Door Latch Assembly Tightened + (ML20083F129)
- 05000272/LER-1983-057-03, /03L-0:on 831115,containment Hydrogen Analyzer Channel 11 Exhibited Low Output During Routine Calibr Checks & Declared Inoperable.Caused by Failed Detector.Detector Replaced & Calibr + (ML20083F132)
- ML20083F133 + (ML20083F133)
- ML20083F134 + (ML20083F134)
- ML20083F135 + (ML20083F135)
- ML20083F141 + (ML20083F141)
- ML20083F145 + (ML20083F145)
- ML20083F149 + (ML20083F149)
- 05000336/LER-1983-030-01, /01T-0:on 831205,fuel Movement Took Place in Spent Fuel Pool,While Credit Taken for Facility Encl Bldg B Filtration Sys (Ebfs).Ebfs Inoperable Due to Installation of Temporary Wall Not Seismically Qualified + (ML20083F153)
- PLA-1987, Updated Interim Deficiency Rept Re Scram Discharge Vol Vent & Drain Valve Waterhammer.Testing & Subsequent Analysis Will Be Completed in Mar 1984.Util Will Submit Final Rept by Apr 1984 + (ML20083F156)
- 05000361/LER-1983-148-03, /03L-0:on 831122,diesel Driven Fire Pump Starting Battery Found to Have Low Electrolyte Level & Pump P220 Declared Inoperable.Caused by Evaporation of Electrolyte. Battery Refilled & Station Procedure Revised + (ML20083F160)
- ML20083F161 + (ML20083F161)
- ML20083F173 + (ML20083F173)
- ML20083F182 + (ML20083F182)
- ML20083F188 + (ML20083F188)
- A830024, Forwards Comments in Response to SALP Board 830823 Meeting & SALP Rept as Jointly Reviewed at Facilities on 831004 + (ML20083F194)
- ML20083F199 + (ML20083F199)
- ML20083F200 + (ML20083F200)
- ML20083F201 + (ML20083F201)
- ML20083F203 + (ML20083F203)
- ML20083F209 + (ML20083F209)
- ML20083F210 + (ML20083F210)
- ML20083F215 + (ML20083F215)
- ML20083F217 + (ML20083F217)
- ML20083F221 + (ML20083F221)
- ML20083F228 + (ML20083F228)
- ML20083F230 + (ML20083F230)
- ML20083F233 + (ML20083F233)
- 05000361/LER-1982-172-03, /03L-0:on 821212,review of Records Showed That Monthly Fire Hose Surveillance Test S023-X111-54,due 821212, Not Completed.Caused by Procedural & Training Inadequacies. Surveillance Completed on 830103 + (ML20083F236)
- ML20083F239 + (ML20083F239)
- 05000361/LER-1982-177-03, /03L-0:review of 1982 Records Revealed That Monthly Surveillance Test S023-X111-49 for Fire Doors Due on 820409 & 0609 Not Completed.Caused by Administrative Oversight.Surveillance Completed on 820412 & 0615 + (ML20083F246)
- 05000247/LER-1983-043-01, /01T-0:on 831129,while Performing Containment Spray Pump Test,Motor Operated Valves 869A & B Found Locked Closed Instead of Open,Rendering Sys Inoperable.Caused by Operator Error.Personnel Reinstructed + (ML20083F249)
- 05000361/LER-1983-093-03, /03L-0:review of Records Showed That Annual Surveillance Test S023-3-3.36.1 for 10 Fire Suppression Valves Due 830209 Not Completed.Caused by Valves Having Been Removed from Svc.Surveillance Completed on 831005 + (ML20083F250)
- ML20083F254 + (ML20083F254)
- ML20083F255 + (ML20083F255)
- 05000272/LER-1983-023, Supplemental LER 83-023/01X-1:on 830602,notification Received from Westinghouse of Potential Unreviewed Safety Question Re Operation at Full Power Following Extended Reduced Power Operation.Procedures Implemented + (ML20083F259)
- ML20083F263 + (ML20083F263)
- PLA-1967, Final Deficiency Rept Re Suppression Pool Temp Monitoring Sys (Spotmos).Initially Reported on 821015.Modified Installation Configuration Tested.Review of Test Results Will Be Completed by End of Mar 1984 + (ML20083F267)