Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN099101, Monthly Operating Rept for Aug 1991 for Arkansas Nuclear One Unit 1 + (ML20082U911)
- ML20082U913 + (ML20082U913)
- 05000373/LER-1983-143-01, /01T-0:on 831110,two Cables in Upper Drywell Found Damaged by Heat.Caused by Gaps in Insulation.Insulation Repaired & Inoperable Snubbers Replaced + (ML20082U914)
- ML20082U923 + (ML20082U923)
- ML20082U925 + (ML20082U925)
- ML20082U926 + (ML20082U926)
- ML20082U930 + (ML20082U930)
- ML20082U934 + (ML20082U934)
- ML20082U938 + (ML20082U938)
- ML20082U950 + (ML20082U950)
- ML20082U957 + (ML20082U957)
- RBG-16-484, Forwards Responses to Draft SER Open Items,Request for Addl Info Identified in 810805 & 1231 Ltrs & Positions on Licensing Review Group II Issues 1-ASB Through 5-ASB + (ML20082U965)
- ML20082U970 + (ML20082U970)
- ML20082U986 + (ML20082U986)
- B10969, Advises That Util Will Replace All Leaking Fuel Assemblies, Except One Assembly Classified as Probable Leaker,For Cycle 6 Operation,Per 831104 & 17 Ltrs + (ML20082U994)
- 05000461/LER-1991-004, :on 910819,reactor Core Isolation Cooling Sys Isolation Occurred.Caused by Rosemount Transmitter Failure. Failed Transmitter Replaced & post-maint Testing Satisfactorily Completed + (ML20082U995)
- ML20082V017 + (ML20082V017)
- ML20082V091 + (ML20082V091)
- ML20082V101 + (ML20082V101)
- ML20082V107 + (ML20082V107)
- ML20082V115 + (ML20082V115)
- ML20082V118 + (ML20082V118)
- ML20082V126 + (ML20082V126)
- ML20082V132 + (ML20082V132)
- ML20082V144 + (ML20082V144)
- ML20082V176 + (ML20082V176)
- ML20082V179 + (ML20082V179)
- ML20082V181 + (ML20082V181)
- ML20082V182 + (ML20082V182)
- HL-1810, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/91-19 & 50-366/91-19.Response Withheld (Ref 10CFR73.21) + (ML20082V183)
- ML20082V188 + (ML20082V188)
- NRC-95-4443, Provides Info in Response to Request That Licensee Decouple Surge Line & Mainsteam Line from Rcl in Piping Analysis Models & Provide Deadweight & Seismic Analyses for Surge Line + (ML20082V199)
- ML20082V202 + (ML20082V202)
- RC-95-0117, Provides Proposed Schedule for Sceg up-rate Licensing of Vsns W/Respect to Large Break LOCA Analyses + (ML20082V208)
- ML20082V210 + (ML20082V210)
- ML20082V212 + (ML20082V212)
- ML20082V215 + (ML20082V215)
- RBG-16-528, Interim Deficiency Rept DR-136 Re Gouge in Pipe in Class 1 Feedwater Sys.Evaluation Incomplete.Next Rept Expected by 840113 + (ML20082V217)
- FVY-83-124, Submits Addl Info Re Voltage & Frequency Setpoints Per 830805 Proposed Tech Specs for Limiting Conditions for Operation & Surveillance Criteria for Protection Equipment Added to Reactor Protection Sys + (ML20082V223)
- ML20082V226 + (ML20082V226)
- ML20082V229 + (ML20082V229)
- TXX-9510, Responds to NRC Re Violations Noted in Insp Repts 50-445/95-03 & 50-446/95-03 on 950221-24.Corrective Actions: Trending & Analysis Process Has Been Implemented to Provide Tool to Assess Problems & Allow Proactive Intervention + (ML20082V230)
- RBG-35-612, Monthly Operating Rept for Aug 1991 for River Bend Station, Unit 1 + (ML20082V231)
- ML20082V235 + (ML20082V235)
- ML20082V238 + (ML20082V238)
- ML20082V239 + (ML20082V239)
- ML20082V243 + (ML20082V243)
- ML20082V244 + (ML20082V244)
- ML20082V255 + (ML20082V255)
- ML20082V258 + (ML20082V258)
- ML20082V260 + (ML20082V260)