Responds to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp Facilities at Long Island City,Ny;Houston, Tx & Carol Stream,Il. Bechtel Conducting Audit & Matl Property Tests
ML20082V229
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/23/1983
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 GN-287, IEB-83-06, IEB-83-6, NUDOCS 8312200029
Download: ML20082V229 (6)


Text

_ _ _ - _ _ _ _ - __ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ ___

e Goorg a Pour Corrpany 333 P+trari Asenue Atw% G. m 7a 30';,08 T4fhone 404 f2C. 7 7?6 uw, m es PoM Cf; e Bor 4 w ,

A!Wta Geer 13 'd302 Georgia Power E E L am oe< ~ n. w v w e e w et November 23, 1983 United States Nuclear Regulatory Commission

Reference:

Office of Inspection and Enforcement RII: JP0:

Region II - Suite 3100 50-424 101 Marietta Street 50-425 Atlanta, Georgia 30303 Attention: Mr. James P. O'Reilly File: X7BC24 Log: GN-287 Gentlemen:

The following is submitted in response to ItE Bulletin 83-06, "Non-conforming Materials Supplied by Tube-Line Corporation Facilities at Long Island City, New York; Houston, Texas; and Carol Stream, Illinois:"

The attached list contains all ASME III Code materials supplied by Tube-Line Corporation to the Vogtle Electric Generating Plant (VEGP) through primary vendors as of 11/i8/83. Sub-vendors have been contacted and re-quested to provide information regarding any ASME code materials supplied by Tube-Line Corporation used in VEGP components. This information will be provided to the NRC when it becomes available.

Georgia Power Company has submitted one fitting from each heat of material supplied by Tube-Line Corporation to the Vogtle Project Architectural -

Engineer and "N" Certificate Holder, Bechtel Power Corporation, for chemical and physical property analysis. Copies of the Certified Material Test Reports (CMTR's) were sent with each fitting. Bechtel will conduct a Supplier Quality Audit of Tube-Line Corporation and their sub-suppliers to verify by objective evidence that a program for material traceability was established during the time of manufacture and that no welding was performed on the fittings.

If the audit produces satisfactory results, the sample of fittings from the jobsite will be tested for chemical and physical properties.

After satisfactory completion of the Tube-Line audit and material property tests, Bechtel will recommend that the Vogtle Project invoke Code Case N-242-1 in order to make the remainder of the fittings (other than the sample tested) supplied by Tube-Line acceptable for ASME Section III applications.

Code Case N-242-1 has been accepted by the USNRC as discussed in Regulatory Guide 1.85.

<hN Pv '

0312200029 831123 PCR ADOCK 05000424 G PDR

. . 1 Mr. James P. O'Reilly i

50-424/50-425 November 23, 1983 Page 2 This reply contains no proprietary information and may be placed in the NRC's Public Document Room.

Very truly yo ,

~

. O. Foster REF/00F/cc D. O. Foster states that he is the Vice President and General Manager of Vogtle i Project and is authorized to execute this oath on behalf of Georgia Power l Company and that to the best of his knowledge and belief the facts set forth ir.

this letter are true.

GPC.: .

,f ,

D . I) . Foster Sworntoandsubscritedbeforemethisfj day of November,1983.

Natsy Pubile.Ceords.Stsee at teres v W 5rhsM Expires March 21.1935 attachment xc: U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 O. Batum J. A. Bailey E. D. Groover L. T. Gucwa M. Malcom G. Bockhold, Jr.

P. D. Rice

JThe following ASME Ill materials, supplied by Tube-Line Corporation, have been

! received at the Vogtle Electric Generating Plant as of 11/18/83. System 1 designations are not made until the materials are released from storage and in-j stalled in the plant.

I  ; Description Quantity 1" Elbow, BW, seamless, 90 LR, S/160, SA-403, WP304L, Class 1 150 3/4" 150 1" i 127

-1 u

jgu 126 2"- 169 1" Elbow, BW, seamless, 90* LR, S/40S, SA-403,'WP304L',-Class 2~ 200 3/4" .

200 1" 200 1)" v 200 2" , , x . 200 1" Elbow, BW, seamless, 45 LR, S/160, SA-403, WP304L, Class 1 80 3/4" 81 i 1" 80 1 11" 80 2" 78 1" Elbow, BW, seamless, 45 LR, S/40S, SA-403, WP304L, Class 2 100 3/4" 100

"' 100 1"

11" 98 2" 100 1" Tee, BW, seamless,'S/160, SA-403, WP304L, Class 1 50 3/4" 100 l '? 50 l'"i "

50 2" 50 1" Tee, BW, seamless, S/405, SA-403, WP304L, Class 2 100 4

3/4" . 100 1" 100 11" 100

'2" 100 1" Cap, BW, seamless, S/40S, SA-403, WP304L. Class 2 50 3/4" 50 1" 50 11" 50 2" 50 3/4"xi" Reducer, concentric, BW, seamless, S/40S, SA-403, WP304L, Class 2 40 1"x3/4" 50 1"x)" 40

~"

ll"x1" "

50

.11"x3/4" - 40 ll"xi" 20 2"x11" 100 2"x1" 50 2"x3/4" "

30 2 "x i 20 3/4"xi" Reducer, eccentric, BW, seamles's, S/40S, SA-403, WP304L, Class 2 5 1"x3/4" 5

1"xi" "

5

c.

1 li"x1" Reducer, eccentric, BW, seamless, S/40S, SA-403, WP304L, Class 2 5 +

ll"x3/4" "

5

.,~

li"xi" 5 2"xll" "

5 2"xl" "

5 2"x3/4" "

5 2"xi" 5 3" Flange, SW, RF, 2500#, S/160 Bore, SA-182, F316, Class 1 10 3/4" 25 1" 25 11" 25 2" 25 i" Flange, WN, RF, 2500#, S/160, SA-182, F316, Class 1 10 3/4" 20 1" 20 13" 20 2" 20 1" Flange, SW, RF, 1500#, S/160 Bore, SA-182, F316, Class 2 80 3/4" 100 1" 100 11" 100 2" 102 1" Flange, SW, RF,1500#, S/805 Bon., SA-182, F316, Class 2 10 3/4" 20 1" 20 11" 20 2" 20 1" Flange, SW, RF, 600#, S/40S Bore, SA-182, F316, Class 2 10 3/4" 20 1" 20 11" 20 2" 20 3" Flange, SW, RF, 300#, S/40S Bore, SA-182, F316, Class 2 150 3/4" 205 1" 200 11" 200 2" 200 3" Flange, SW, RF, 150#, S/40S Bore, SA-182, F316, Class 2 150 3/4" 200 1" 200 11" 200 2" 200 1" Flange, WN, RF,1500#, S/160, SA-182, F316, Class 2 50 3/4" 75 1" 75 11" 75 1-2" 75 i" Flange, WN, RF,1500#, S/40S, SA-182, F316, Class 2 50 3/4" 75 1" 75 li" 75 2" 75

\ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1 C 1" Flange', blin'd, RF, 2500#,' SA-182, F316, Class 1' 30 y .3/4" "

40 1" 40 m .4 .

11"- 40

2." . . 40

( 1" Flange, blind, RF, 1500#, SA-182, F316, Class 2 40

'3/4" >

50 t, '1"3. .

50 l i '.' 50 2" 50 1" Flange, blind, RF, 600#, SA-182, F316, Class 2 ~ 10 6

3/4" +

20 1" 20

~ 11" 20 2"' ."'

. . 20 .

1" Flange. blind, RF, 300#, SA-182, F316, Class 2 50-

~"

3/4" "

68 1" 75 li" 75 2" -" 75 ,

1" Flange, blind, RF,150#, SA-182, F316, Class 2 '

75 3/4" "

, 100 1" 100 li" <

100 2" 100 2" Flange, orifice, WN,'RF, 2500#, S/160, SA-182, F316, Class 1 5 pr.

-1". "

5 pr.

2" Flange,' orifice, WN, RF, -1500#, S/160,' SA-182, F316, Class 2 10 pr.

i 11" 19 pr.

I '

1". " "

10 pr.

3/4" 10 pr.

i

- 2" Flange, orifice, WN, RF,1500# S/80S, SA-182, F316, Class 2 4 pr.

li" 8 pr.

< 1" "

8 pr.

3/4" 4 pr.

=2" Flange, orifice, WN, RF, 600#, S/49S, SA-182, F316, Class 2 4 pr i

~11" -

4 pr.

~1" 4 pr.

3/4" . "

4 pr.

2" Flange, orifice, WN,. RF, 300#, S/40s, SA-182, F316, Class' 2 20 pr.

n -

jgn ' '

16 pr.

.1" "

20 pr.

3/4" . "

15 pr.

2" Flange, SW, FF, 300#, S/40S. Bore, SA-182, F316, Class 2 - 6

.jgn "

6 jn, u .

6 13/4" "

6

i" .

6 2" Flange, SW, FF,150#, S/40S, SA-182, F316, Class 2 6 11" 6 1" 6 3/4" "

6 1" .' 6 4" Slip-on, RF,150#, A-105, Grade 79 8 b

Some of the materials listed above have been installed in the following safety-related systems:

Nuclear Service Cooling Water System - Units 1 and 2 Safety Injection System - Units 1 and 2 Residual Heat Removal System - Unit 1 Containment Spray System - Units 1 and 2 Chemical Volume and Control Systeu - Units 1 and 2 Containment and Auxiliary Building Drain System - Radioactive - Unit 1 l

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _