Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20081E099 + (ML20081E099)
- NLS9000308, Forwards Info to Demonstrate Util Ability to Obtain Funds for Payment of Deferred Insurance Premiums.Supporting Documentation Encl + (ML20081E107)
- ML20081E133 + (ML20081E133)
- ML20081E138 + (ML20081E138)
- 05000528/LER-1995-001, :on 950215,plant Switchyard Voltage Dropped Below Administratively Imposed Limit of 525 Kv for Approx 2.5 Minutes & Caused TS LCO 3.0.3 to Exist.Prepared Personnel for Potential Voltage Drops + (ML20081E142)
- ML20081E143 + (ML20081E143)
- ML20081E154 + (ML20081E154)
- ML20081E157 + (ML20081E157)
- ML20081E158 + (ML20081E158)
- ML20081E160 + (ML20081E160)
- ML20081E162 + (ML20081E162)
- ML20081E165 + (ML20081E165)
- ML20081E167 + (ML20081E167)
- ML20081E170 + (ML20081E170)
- ML20081E176 + (ML20081E176)
- ML20081E179 + (ML20081E179)
- 05000373/LER-1995-007, :on 950216,noted That Quarterly TS Surveillances for Fourth Quarter 1994 Had Not Been Performed.Caused by Personnel Error.Surveillances Performed + (ML20081E183)
- 05000298/LER-1995-006, :on 950209,SRMs Documented as Not Having Been Calibrated in Accordance W/Stated Requirements of Tss.Caused by Personnel Error.Srm Quarterly Calibration Surveillance Procedure Revised & SRM Recalibrated + (ML20081E196)
- ML20081E197 + (ML20081E197)
- ML20081E198 + (ML20081E198)
- ML20081E199 + (ML20081E199)
- ML20081E207 + (ML20081E207)
- ML20081E211 + (ML20081E211)
- ML20081E230 + (ML20081E230)
- ML20081E234 + (ML20081E234)
- ML20081E236 + (ML20081E236)
- ML20081E240 + (ML20081E240)
- ML20081E242 + (ML20081E242)
- ML20081E243 + (ML20081E243)
- ML20081E247 + (ML20081E247)
- ML20081E248 + (ML20081E248)
- ML20081E249 + (ML20081E249)
- ML20081E251 + (ML20081E251)
- ML20081E253 + (ML20081E253)
- ML20081E257 + (ML20081E257)
- ML20081E262 + (ML20081E262)
- ML20081E263 + (ML20081E263)
- ML20081E264 + (ML20081E264)
- ML20081E266 + (ML20081E266)
- ML20081E268 + (ML20081E268)
- ML20081E269 + (ML20081E269)
- ML20081E272 + (ML20081E272)
- 3F0395-15, Forwards Documents That Util Referenced & Used During 950301 Mgt Meeting to Discuss Performance at Facility,Including G Boldt Rept on Actions Taken or Planned in Response to Mgt Review Panel Rept of 941231 & Event Free Operation Program + (ML20081E276)
- ML20081E289 + (ML20081E289)
- 05000457/LER-1995-002-06, :on 950215,identified That Suction & Return Sensing Lines to Monitor Not Connected to Monitor.Caused by Procedural Deficiency & Personnel Error.Rev Made to ILRT Procedure & Personnel Counselled/Trained + (ML20081E295)
- ML20081E352 + (ML20081E352)
- ML20081E362 + (ML20081E362)
- ML20081E379 + (ML20081E379)
- 05000457/LER-1995-001-09, :on 950215,operations Unable to Perform Accumulator Blowdown on 2A MSIV Active Train.Caused by Equipment Failure.Insps Performed on All MSIV Nitrogen Isolation Valves + (ML20081E408)
- ML20081E409 + (ML20081E409)
- ML20081E413 + (ML20081E413)