Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080S207 + (ML20080S207)
- ML20080S212 + (ML20080S212)
- 05000416/LER-1984-005, :on 840119,during Performance of Special Test of Drywell Purge Compressor a Logic Relays,Compressor Inadvertently Started.Cause Unknown.Maint Order Initiated to Reperform Test & Troubleshoot Circuit + (ML20080S213)
- RBG-16-100, Interim Deficiency Rept DR-126.Investigation Not Completed. Next Rept Will Be Submitted by 831114 + (ML20080S216)
- RBG-16-120, Final Deficiency Rept DR-80 Re Defective Piston Skirt Castings Installed in Emergency Diesel Generator Engines Supplied by Transamerica Delaval.Initially Reported on 821124.Piston Skirts Replaced.Also Reported Per Part 21 + (ML20080S218)
- AECM-83-0669, Forwards Responses to Informal NRC Concerns on Containment Structural Integrity Test Per 830706 Conference W/Bechtel & Nrc.Test Performed in Compliance W/Provisions of Reg Guide 1.18,Rev 1 + (ML20080S220)
- ML20080S223 + (ML20080S223)
- ML20080S225 + (ML20080S225)
- ML20080S237 + (ML20080S237)
- ML20080S243 + (ML20080S243)
- ML20080S244 + (ML20080S244)
- AECM-84-0052, Informs That ASME Code Matl Not Received from Tube-Line Corp,Per IE Bulletin 83-06.Carbon Steel Tube-Line Flanges Purchased from Consolidated Pipe & Supply for nonsafety- Related Applications.Corrected Copy + (ML20080S245)
- ML20080S247 + (ML20080S247)
- ML20080S248 + (ML20080S248)
- ML20080S250 + (ML20080S250)
- ML20080S251 + (ML20080S251)
- ML20080S261 + (ML20080S261)
- ML20080S265 + (ML20080S265)
- ML20080S271 + (ML20080S271)
- ML20080S283 + (ML20080S283)
- ML20080S285 + (ML20080S285)
- AECM-83-0654, Provides Addl Info on SER Confirmatory Item 1.10(4) Re Soil Structure Interaction,In Fulfillment of Commitments Made in Response to NRC .Util Committed to Utilizing Elastic half-space Methodology + (ML20080S288)
- ML20080S307 + (ML20080S307)
- ML20080S311 + (ML20080S311)
- GO2-83-823, Submits Interim Response to NRC Re Violations Noted in IE Insp Rept 50-397/83-14.Corrective Actions: Quality Class I & II Peds Undergoing Reevaluation.Sample Program Expected to Be Completed by 830930 + (ML20080S322)
- ML20080S326 + (ML20080S326)
- ML20080S330 + (ML20080S330)
- ML20080S350 + (ML20080S350)
- ML20080S352 + (ML20080S352)
- ML20080S358 + (ML20080S358)
- AECM-84-0147, Application for Amend to License NPF-13,changing Tech Specs Re APRM Setpoint + (ML20080S359)
- ML20080S362 + (ML20080S362)
- ML20080S363 + (ML20080S363)
- ML20080S367 + (ML20080S367)
- PLA-1864, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-18.Corrective Actions:Importance of Complying W/Plant Procedures & Radiation Work Permit Requirements Stressed & Incorporated Into Training Course + (ML20080S369)
- ML20080S372 + (ML20080S372)
- ML20080S388 + (ML20080S388)
- ML20080S389 + (ML20080S389)
- ML20080S393 + (ML20080S393)
- ML20080S397 + (ML20080S397)
- RBG-17-067, Forwards Response to Informal Questions Re FSAR Chapter 13 Raised by Licensee Qualification Branch Based on Review of .Info Necessary to Complete Input to SER + (ML20080S405)
- ML20080S411 + (ML20080S411)
- ML20080S421 + (ML20080S421)
- ML20080S423 + (ML20080S423)
- ML20080S424 + (ML20080S424)
- ML20080S432 + (ML20080S432)
- 05000397/LER-1984-005, :on 840123 & 0208,inadvertent Auto Start of HPCS Diesel Generator DG-1C Occurred.Caused by Failure to Properly Tag Out Unit for Maint Activity.Personnel Retrained + (ML20080S439)
- ML20080S441 + (ML20080S441)
- ML20080S444 + (ML20080S444)
- 05000261/LER-1984-001, :on 840126,source Range Detector Channel N-31 Failed High,Causing Shutdown Bank Trip.Caused by Detector Shorting Out.Detector Replaced + (ML20080S447)
- ML20080S449 + (ML20080S449)