n Arizona Public Service Company PO. DOX 21666 e PHOENIX, ARIZONA 85036
~
February 3, 1984 ANPP-2d790-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. f. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 82-46 A 50.55(e) Potentially Reportable Deficiency Relating To ITT-Barton Pressure Transmitters Supplied By CE Do Not Meet Overpressure Requirements.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between J. Eckhardt and G.
Pickworth on August 24, 1982.
(B) ANPP-21837, dated September 15, 1982 (Interim Report)
(C) ANPP-22279, dated November 15, 1982 (Time Extension)
(D) ANPP-22731,. dated January 14, 1983 (Time Extension)
(E) ANPP-23274, dated March 17, 1983 (Revised Interim Report)
(F) ANPP-23889, dated May 25, 1983 (Time Extension)
(G) ANPP-27605, dated August 22, 1983 (Revised Interim Report)
(H) ANPP-28484, dated December 22, 1983 (Revised Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by References (B), (E),
(G), and (H) and Time Extensions were requested by References (C), (D) and (F). At that time, it was estimated that a Final Report would be available by February 14, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 15, 1984, a t which time a complete report will be submitted.
There is no new irformation or change to the Interim Report at this time.
Very truly your
{
Mi fl LAA 9402290102 840203 PDR ADOCK 05000 E. E. Van Brunt, Jr.
S APS Vice President, Nuclear ANPP Project Director EEVB/TRB:ru cc: See Page Two
,,.L t -27 s 0
4.
. Mr. T. W.-Bishop DER 82-46 Page'Two cc:
Richard DeYoung, Director Office of Inspection-and Enforcement U. S. Nuclear Regulatory-Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide
-D. B. Fasnacht-A. - C. Rogers B. S. Kaplan
.J. Vorees J. R. Bynum P. P. Klute
~ A. C. Gehr W. J. Stubblefield W. G. Bingham-
.R. L. Patterson R. W. Welcher H. D. Foster D.
R.' Hawkinson L'. E. - Vorderbrueggen.
G. A. Fiorelli S.-R.
Frost JJ. Self D. Canady L'
' Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339