Responds to NRC Re Violations Noted in IE Insp Rept 50-289/83-19.Corrective Actions:Production & QC Personnel Reinstructed in Requirements for Proper Installation & Insp of Supports
ML20080S441
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/16/1983
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20080S413 List:
References
5211-83-265, NUDOCS 8310180372
Download: ML20080S441 (2)


Text

.

GPU Nuclear Corporation

- Nuclear  :::,ome:r8os Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

September 16, 1983 5211-83-265 Dr. Thomas E. Murley Region I, Regional Administrator U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Inspection Report No. 83-19 Notice of Violation Response Attachment A to this letter is the GPUN response to Appendix A of Inspection Report 50-289/83-19 " Notice of Violation".

Sincerely, H. D. Hukill Director, TMI-l HDH: CJS:vj f Attachment cc: R. Conte Sworn and E abscribe2 to Before ne this //,* day of September, 1983.

( -

Notary Public MIA E. PARK, Notary PuWS me wn, DewMa Cou* F"-

,. .., ps Nov. 3,1986 GPU Nuclear Corooration is a subsi'J iary of the General Public Utilities Corporation 8310180372 831005 PDR ADOCK 05000289 (D PDR

41 . .

ATTACHMENT A FINDING:

10 CFR 50, Appendix B, Criterion X, and the GPU Nuclear Corporation Opera-tional Quality Assurance Plan, Section 6.2.1.1, require inspections of

. activities affecting quality to verify conformance with documented procedures and drawings.

Contrary to the above, as of July 8, 1983 2dequate inspection of activities affecting quality to verify conformance with documented procedures and drawings was not conducted in that an anchor bolt associated with modifi-cation task RM-133, Engineering Change Memorandum 198, Main Steam Rupture Restraint to Protect EFW Pipe, did not have full thread engagement of the nut as required by Mechanical Corrective Procedure 1410-Y-61, Revision 0; and a weld associated with the same modification was of a smaller size than that specified by drawing ID-411-24-001. The nonconforming conditions were accepted by Quality Control inspection as documented on Anchor Installation Document RM-13H-B and Plant Inspection Report Number CS/30776/81.

This is a Severity Level V violation (Supplement I).

RESPONSE

I. Corrective ~ Steps Taken and Results Achieved During the NRC inspection in which the violation was identified, Quality Control on July 7, 1983 issued MNCR 0194-83 in order to initiate corrective action for the two conditions noted in the violation. These specific conditions were subsequently evaluated by Technical Functions and found to be acceptable in the as-found configuration. It was noted that the conditions were not in full conformance with the applicable requirements.

II. Corrective Steps Which Have Been Taken to Avoid Further Violations The cognizant' production and quality control personnel have been reinstructed in the requirements for proper installation and inspection of these supports

- in order' to prevent recurrence of the violation.

III. Date When Full Compliance Will Be Achieved Full compliance was achieved on September 6, 1983