Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-16-085, Responds to Re Ultimate Capacity Analysis of Mark III Containments.Ultimate Capacities of Containment Equipment Hatch & Personnel Airlock Determined to Be 56 Psi & 72 Psi,Respectively + (ML20080P724)
- ML20080P726 + (ML20080P726)
- LIC-95-0056, Submits Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld + (ML20080P728)
- 05000261/LER-1983-024-01, /01T-0:on 830916,Tech Spec Instantaneous Release Limit for Radioiodine Exceeded Through Plant Stack.Cause Not Stated.Equipment Which Provided Pathway Shut Down.Iodine Level Remained Normal During Testing + (ML20080P729)
- ML20080P731 + (ML20080P731)
- ML20080P732 + (ML20080P732)
- 05000338/LER-1983-057-03, /03L-0:on 830903 & 12,Fire Door S71-19 Between Emergency Diesel Room 1H & Turbine Bldg Would Not Latch. Caused by Faulty Latching Mechanism & Misalignment.Latch Repaired & Realigned + (ML20080P733)
- ML20080P736 + (ML20080P736)
- ML20080P737 + (ML20080P737)
- 05000395/LER-1983-106-03, /03L-0:on 830904,post-accident Hydrogen Analyzer Panel a (XPN-7215A) Declared Inoperable When Calibr Rotometer Ball Bearing Indicator Lodged in Pressure Regulator.Caused by Personnel Error + (ML20080P738)
- 05000334/LER-1984-001, :on 840114,during Performance of Low Bearing Oil Pressure Trip,Main Turbine Tripped.Caused by Pressure Switch on Auto Stop Oil Header Actuating,Causing Actuation of Solenoid Valve.Switch Setpoint Checked + (ML20080P739)
- ML20080P740 + (ML20080P740)
- ML20080P741 + (ML20080P741)
- ML20080P742 + (ML20080P742)
- NRC-95-0018, Annual Operating Rept Jan-Dec 1994 for Fermi 2 + (ML20080P743)
- DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld + (ML20080P745)
- ML20080P746 + (ML20080P746)
- ML20080P751 + (ML20080P751)
- U-602423, Annual Environ Operating Rept Jan-Dec 1994 + (ML20080P753)
- ML20080P755 + (ML20080P755)
- ML20080P758 + (ML20080P758)
- ML20080P763 + (ML20080P763)
- ML20080P765 + (ML20080P765)
- ML20080P768 + (ML20080P768)
- PY-CEI-NRR-1919, Forwards Results of Vehicle Bomb Comparison & Vehicle Control Measures.Encl Withheld + (ML20080P769)
- ML20080P773 + (ML20080P773)
- ML20080P775 + (ML20080P775)
- ML20080P778 + (ML20080P778)
- ML20080P783 + (ML20080P783)
- ML20080P784 + (ML20080P784)
- NRC-95-4410, Forwards Y-12 Technical Data Sheet 2.2.10, U-2 Molybdenum Alloy, in Response to RAI 210.121 of NRC + (ML20080P788)
- ML20080P789 + (ML20080P789)
- ML20080P793 + (ML20080P793)
- GO2-95-037, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld + (ML20080P794)
- ML20080P795 + (ML20080P795)
- ML20080P797 + (ML20080P797)
- ML20080P808 + (ML20080P808)
- ML20080P816 + (ML20080P816)
- ML20080P817 + (ML20080P817)
- ML20080P822 + (ML20080P822)
- ML20080P827 + (ML20080P827)
- ML20080P828 + (ML20080P828)
- ML20080P829 + (ML20080P829)
- ML20080P831 + (ML20080P831)
- ML20080P834 + (ML20080P834)
- BECO-84-029, Forwards Rev 1 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rev Corrects Error Noted on Page 13 Re Plant Response to MSIV Closure + (ML20080P838)
- ML20080P841 + (ML20080P841)
- ML20080P842 + (ML20080P842)
- 05000361/LER-1983-120-03, /03L-0:on 830829 & 31,flow Control Valve 2FV-0318 for Iodine Removal Sys Failed to Open & Declared Inoperable.Caused by Cracked O-ring Allowing High Pressure Oil to Leak to Low Pressure Side + (ML20080P844)
- 05000361/LER-1984-004, :on 840116,train a Containment Purge Isolation Sys Spuriously Actuated.Caused by Subgroup Relay Actuation Voltage Transient on ESF Bus.No Corrective Action Planned as Minor Transients Expected in Test + (ML20080P845)
- ML20080P847 + (ML20080P847)