ML20080P731

From kanterella
Jump to navigation Jump to search
Submits Summary Description of Vehicle Control Measures in Response to 10CFR73 Rule, Protection Against Malevolent Use of Vehicles at Npps. Encl Withheld
ML20080P731
Person / Time
Site: Peach Bottom  
Issue date: 02/28/1995
From: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Bernero R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 9503080106
Download: ML20080P731 (1)


Text

.e Gwald R. Reiney vics Pusadent Pstch Bottom Atomic Power st" ton PECo Energy Company AD 1. Box 208 I

Delta. PA 17314-9739 i

717 456 7014 1

3ebruary 28,1995 ' ?

I i

l Mr. Robert M. Beinero, Director Office of Nuclear Material Safety and Safeguards 3

U.S. Nuclear Regulatory Commission

/

Washington, DC 20555 10CFR73.55(c)(?)(1)

]

Docket Nos.

50-277 50-270 License Nos.

OPR-44 DPR-56

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Summary Description of Vehicle Control Measures in i

Response to 10CFR73 Rule, " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants" l

i Dear Mr. Bemero; l

On August 1,1994, the NRC issued Final Rule 10CFR73, " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants," which amended the NRC's regulations concerning the design basis threat for radiological sabotage to include the use of a land vehicle by adversaries for i

transporting personnel and their hand-carried equipment to the proximity of vital areas, and to include a land vehicle bomb. 10CFR73.55(c)(9)(l) requires that licensees submit a summary description of the proposed vehicle control measures and the results of the vehicle bomb comparison as stipulated in 10CFR73.55(c)(7) and 10CFR73.55(c)(8), respectively, by February 28, l

1995. Enclosed is the required " Summary Description" for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The " Summary Description" does not contain Safeouards Information.

4 However, the supporting documentation provided as attachments to the " Summary Description" does coritain.Safeouards Information. Therefore, this information must be controlled accordingly as required by 10CFR73.21, and is not for public disclosure.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, l

a c y/e Gerald R. Rainey Vice President, l

Peach Bottorg Atomic Power Station l

A]Oh GRR/DRM/ GAB:saj Enclosures cc:

USNRC, Document Control Desk, Washington, DC (w/o attachments)

T. T. Martin, Administrator, Region I, USNRC (w/o attachments)

W. L Schmidt, USNRC Senior Resident inspector (w/o attachments)

/

f I

i CCN-95-14020 9503080106 950228

~

l l

PDR ADOCK 05000277 F

PDR t