Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080L556 + (ML20080L556)
- NPL-95-0091, Forwards Copies of, 1994 Annual Results & Data Rept, for Plant,Submitted in Accordance W/Ts 15.6.9.1.B Per Requirements of 10CFR50.59(b).Contains Info Re Operational Highlights of Plant Operations During 1994 + (ML20080L559)
- ML20080L568 + (ML20080L568)
- 05000311/LER-1983-017, Supplemental LER 83-017/03X-1:on 810515,during Startup & Cycle 1 Operations,Leakage Past Pressurizer PORVs & Pressurizer Overpressure Protection Sys Values Observed. Cause Not Stated.Porvs Modified + (ML20080L571)
- ML20080L572 + (ML20080L572)
- ML20080L573 + (ML20080L573)
- ML20080L582 + (ML20080L582)
- 05000339/LER-1983-070-03, /03L-0:on 830826,pump Flowrate Not Measured Per ASME Xi,Subsection Iwp Requirements.Caused by ASME XI Iwp Requirement Inadvertently Deleted During Rev to Testing Procedure + (ML20080L584)
- ML20080L586 + (ML20080L586)
- ML20080L588 + (ML20080L588)
- ML20080L593 + (ML20080L593)
- ML20080L600 + (ML20080L600)
- ML20080L615 + (ML20080L615)
- ML20080L618 + (ML20080L618)
- W3P83-3089, Forwards Amend 33 to OL Application,Consisting of Amend 33 to FSAR + (ML20080L622)
- ML20080L626 + (ML20080L626)
- ML20080L635 + (ML20080L635)
- ML20080L636 + (ML20080L636)
- ML20080L637 + (ML20080L637)
- ML20080L642 + (ML20080L642)
- ML20080L647 + (ML20080L647)
- ML20080L651 + (ML20080L651)
- ML20080L652 + (ML20080L652)
- ML20080L653 + (ML20080L653)
- ML20080L656 + (ML20080L656)
- ML20080L666 + (ML20080L666)
- ML20080L671 + (ML20080L671)
- ML20080L678 + (ML20080L678)
- ML20080L686 + (ML20080L686)
- 05000324/LER-1983-059-03, /03L-0:on 830822,discovered Automatic Depressurization Sys Initiation Logic a Switch 2E11-PS-N016A Would Not Respond to Applied Test Signal.Caused by Corrosion of Switch Internals & Setpoint Drift + (ML20080L688)
- 05000327/LER-1983-111-03, /03L-0:on 830831,while Performing SI-102,diesel Generator 1A2 Found W/Oil in Glycol Expansion Tank.Caused by Oil on Top of Water from Prior Lube Oil Cooler Leak & Failed Cylinder Head.Coolant Replaced + (ML20080L693)
- ML20080L695 + (ML20080L695)
- RBG-16052, Forwards Suppl 6 to Environ Rept - OL Stage.Review Questions Attached to NRC Renumbered.Affidavit of Svc Encl + (ML20080L700)
- ML20080L706 + (ML20080L706)
- ML20080L708 + (ML20080L708)
- 05000328/LER-1983-114-03, /03L-0:on 830823,during Testing of Safety Injection Sys (SIS) & Centrifugal Charging Pumps (Ccp),Sis Pump 2A & Both CCPs Failed to Meet Min Head Curve Requirements.Caused by Normal Pump Operation + (ML20080L710)
- IR 05000348/2020402 + (ML20080L713)
- 05000389/LER-1983-049-01, /01T-0:on 830911,while Performing Valve Lineup Checks for Startup,Svc Air Containment Isolation Valves V28794 & V18796 Found Open.Caused by Personnel Error.Valves Shut + (ML20080L714)
- ML20080L715 + (ML20080L715)
- 05000251/LER-1983-013-03, /03L-0:on 830825,while Performing Safeguards Test, Emergency Load Sequencer 4A Failed.Caused by Normal End of Life for open-circuited Timer 4A.Agastat Relay Replaced & Sequencer Tested & Returned to Svc + (ML20080L717)
- ML20080L720 + (ML20080L720)
- 05000416/LER-1983-123-01, /01T-0:on 830906,inadequate Design Flow Paths Identified from Drywell Cooler Drip Pans to Leak Detection Monitor.Caused by Inadequate Sys Design.Mods Completed + (ML20080L735)
- A09958, Discusses Review of RI-91-A-0243 Re Activities at Millstone Unit 2 + (ML20080L737)
- ML20080L739 + (ML20080L739)
- ML20080L741 + (ML20080L741)
- ML20080L743 + (ML20080L743)
- ML20080L750 + (ML20080L750)
- ML20080L751 + (ML20080L751)
- 05000416/LER-1983-127-03, /03L-0:on 830822,during Surveillance Testing, Control Room Ventilation Radiation Monitor Channel B & Channel C hi-hi Setpoints Exceeded Allowable Values.Caused by Instrument Drift + (ML20080L763)
- 05000366/LER-1983-081-03, /03L-0:on 830829,during Performance of Procedure HNP-2-3309,personnel Determined HPCI Turbine Exhaust Diaphragm Pressure Switch Out of Calibr.Caused by Instrument Setpoint Drift.Switch Recalibr + (ML20080L764)
- 05000366/LER-1983-092-03, /03L-0:on 830831,RHR Svc Water Pump 2A Declared Inoperable After Motor Bearing Began to Overheat While Trying to Make Up Water to Circulating Water Flume.Caused by Partially Blocked Cooling Water Line + (ML20080L766)