Georgia Pow 2r Company 40 invarness Center Parkway -

Post 04ce Box 1295 3' Birmingham. Alabama 35201

- Telephone 205 877 7122 C.K.McCoy Georgia Power

&,p%l "* ' the sourhem eiectre system February 23, 1995 LCV-0573 Docket Nos. 424 50-425 U. S. Nuclear Regulatory Commission ATTN:- Document Control Desk Washington, D. C. 20555 -

Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT 1994 ANNUE REPORT - PART 1 In accordance with the applicable regulatory requirements, Georgia Power Company ,

hereby submits Part I of the 1994 Annual Report of operating information. Part 2 of the  :

1994 Annual Report will be submitted by May 1,1995. L Sincerely,  ;

C. K. McCoy CKM/JLilgmb  :

Enclosure:

Annual Report - Part I cc: Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator -

Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle  ;

Mr. E. S. Beckjord, Director, Office of Nuclear Regulatory Research 000cca 9503020348 941231 / [p '

PDR ADOCK 05000424 fj j R PM p

l b ,

ggC GENg -

s GEORGIA POWER

+

A

COMPANY

! PLANT VOGTLE UNITS 1 & 2

! 1994 l ANNUAL REPORT PART 1 -

DOCKET NUMBERS 50-424/425 LICENSE NUMBERS NPF-68/81 i

VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 NRC DOCKETS 50-424/425 OPERATING LICENSE NPF-68/81 1994 ANNUAL REPORT PART1 TABLE OF CONTENTS ZAG.E I. INTRODUCTION 1 II. TECHNICAL SPECIFICATION 6.8.1.2 ANNUAL REPORTS ,

A. TECHNICAL SPECIFICATION 6.8.1.2a - REPORT OF 2 PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR.

B. TECHNICAL SPECIFICATION 6.8.1.2b - REPORT OF 3 PRIMARY COOLANT'S EXCESSIVE SPECIFIC ACTIVITY C. TECHNICAL SPECIFICATION 6.8.1.2c - REPORT OF 4 LEAKAGES GREATER THAN OR EQUAL TO 0.005 MICROCURIES i

l i

I ,

[,. VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1994 ANNUAL REPORT PART 1 INTRODUCTION The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia, at a site ,

34 miles southeast of Augusta. The Unit 1 operating license was initially received on January 16,1987 and Commercial Operation started on May 31,1987. Unit 1 is in its sixth fuel cycle. Unit 2 received its ;

initial operating license on February 9,1989, and began commercial operation on May 19,1989. Unit 2 is currently in its fourth refueling outage.

i i

f i

f r

1 1

II A VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1994 ANNUAL REPORT- PART 1 TECIINICAL SPECIFICATION 6.8.1.2a REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR

  1. PERSONNEL (>100 MREM) TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Reactor Operations & Surv.

Maint. & Construction 3 0 3 0.643 .000 1.453 Operations 13 0 0 4.911 .015 0.009 Health Physics & Lab 1 0 0 0.526 .000 0.017 Supervisory & Office Staff 0 0 0 0.066 .022 0.219 Engineering Staff 0 0 0 0.102 .011 0.050 Routine Plant Maintenance Maint. & Construction 11 0 32 6.989 .043 11.314 operations 4 0 0 2.574 .012 0.051 Health Physics & Lab 49 1 4 12.056 .170 1.655 Supervisory & Office Staff 0 0 0 0.163 .057 0.546 Engineering Staff 0 0 0 0.599 .007 0.277 Inservice Inspection Maint. & Construction 8 0 13 2.834 0.000 3.405 Operations 0 0 0 0.002 0.000 0.000 Health Physics & Lab 0 0 0 0.000 0.000 0.000 Supervisory & Office Staff 1 0 20 0.107 0.000 8.860 Engineering Staff 0 0 1 0.104 0.000 0.335 Special Plant Maintenance

  • Maint. & Construction 119 1 132 41.507 0.244 54.847 Operations 11 1 1 4.051 0.248 0.155 Health Physics & Lab 30 0 58 10.181 0.070 17.940 Supervisory & Office Staff 3 1 15 1.667 0.115 5.403 Engineering Staff 5 0 3 1.426 0.081 1.475 Waste Processing Maint. & Construction 0 0 1 0.020 .000 0.163 Operations 2 0 1 0.860 .000 0.323 Health Physics & Lab 1 0 4 0.847 .011 1.743 Supervisory & Office Staff 0 0 0 0.002 .000 0.001 Engineering Staff 0 0 0 0.000 .000 0.155 Refueling Maint. & Construction 7 0 20 1.842 0.000 5.696 Operationns 2 0 0 0.733 0.021 0.000 Health Physics & Lab 1 0 3 0.467 0.000 1.596 Supervisory & Office Staff 0 0 4 0.175 0.000 0.923 Engineering Staff 1 0 3 0.296 0.000 0.946 2

II A YOGTLE ELECTRIC GENERATING PLANT- UNITS I & 2 1994 ANNUAL REPORT- PART 1 TECIINICAL SPECIFICATIOri 6.8.1.2a ,

REPORT OF PERSONNEL EXPOSURE GREATER THAN 100 MREM /yr ,

CONTINUED:

  1. PERSONNEL (>100 MREM) TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Totals Maint, & Construction 148 1 201 53.835 0.287 76.878 operations 32 1 2 13.130 0.296 0.537 Health Physics & Lab 82 1 69 24.077 0.251 22.950 Supervisory & Office Staff 4 1 39 2.179 0.194 15.953 Engineering Staff 6 0 7 2.527 0.099 3.238 Grand Totals 272 4 318 95.749 1.127 119.557 Total radiation exposure is 216.233 Ram (108.117 Rem per unit) which constitutes 100% of the site exposure for the year.
  • - Refers to special maintenance not usually performed during normal operations.

Most major maintenance is associated with outages. Examples of special maintenance performed in 1994 include: reactor coolant pump motor work, steam generator cleaning and testing, installation of reactor head shielding, and seal welding of safety injection check valves, i

2A l

1

II B

~

I VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 1994 ANNUAL REPORT- PART 1 TECHNICAL SPECIFICATION 6.8.1.2b REPORT OF PRIMARY COOLANT'S EXCESSIVE SPECIFIC ACTIVITY There were no instances of Units 1 or 2 exceeding the dose equivalent iodine limits or the total specific activity limits, as specified in Technical Specifications, Section 3.4.8, during 1994.

)

)

3

l

.- II C VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 1994 ANNUAL REPORT- PART I TECHNICAL SPECIFICATJON 6.8.1.2e REPORT OF LEAKAGES GREATER THAN OR EQUAL TO 0.005 MICROCURIES As required by Technical Specifications Section 3.7.9, leak tests were performed on sealed sources with activity greater than 100 microcuries of beta and/or gamma, or 5 microcuries of alpha radiation. The test results revealed less than 0.005 microcuries of removable contamination or leakage.

4