Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L262 + (ML20078L262)
- ML20078L263 + (ML20078L263)
- BVY-94-116, Forwards Annual Cashflow Statements for Plant & Nine Sponsor Companies for Yr 1994 + (ML20078L268)
- ML20078L276 + (ML20078L276)
- ML20078L281 + (ML20078L281)
- ML20078L295 + (ML20078L295)
- ML20078L303 + (ML20078L303)
- ML20078L308 + (ML20078L308)
- ML20078L325 + (ML20078L325)
- ML20078L328 + (ML20078L328)
- ML20078L329 + (ML20078L329)
- ML20078L336 + (ML20078L336)
- ML20078L337 + (ML20078L337)
- ML20078L340 + (ML20078L340)
- ML20078L343 + (ML20078L343)
- ML20078L369 + (ML20078L369)
- ML20078L379 + (ML20078L379)
- ML20078L380 + (ML20078L380)
- ML20078L385 + (ML20078L385)
- ML20078L386 + (ML20078L386)
- ML20078L394 + (ML20078L394)
- PY-CEI-NRR-1907, Forwards Color Transparencies from Aerial Remote Sensing Programs Conducted at Plant in 1987,1988,1990 & 1992 Per Section 4.2.2.1 of Environ Protection Plan,App B to License NPF-58 + (ML20078L395)
- ML20078L415 + (ML20078L415)
- BSEP-95-0014, Requests NRC Concurrence W/Cp&L Plans for Future Insps of FW Spargers for Bsep,Units 1 & 2.As Described in Encl,Cp&L Plans to Perform Visual Exam of FW Spargers in Lieu of Liquid Penetrant Testing Reqired by NRC + (ML20078L420)
- ML20078L432 + (ML20078L432)
- ML20078L438 + (ML20078L438)
- NG-94-4196, Confirms Completion of Operator Training in Response to Generic Ltr 94-02 + (ML20078L444)
- 05000237/LER-1983-066-03, /03L-0:on 830918,MSIV 2D 2.5 Closure Time Exceeded Tech Spec Requirement of 3 to 5 S.Caused by Timing Mechanism Out of Adjustment.Mechanism Adjusted + (ML20078L447)
- ML20078L448 + (ML20078L448)
- NRC-94-0122, Provides Addl Info Re Confirmatory Action Ltr on 931225 Turbine Event.List of Areas Covered by Turbine Sys Plant Walkdown Encl + (ML20078L450)
- NRC-94-0124, Comments on NRC SE of Fermi 2 Restart Action Plan Issues Closeout Per Confirmatory Action Ltr on 931225 Turbine Event + (ML20078L451)
- ML20078L454 + (ML20078L454)
- ML20078L456 + (ML20078L456)
- ML20078L466 + (ML20078L466)
- ML20078L470 + (ML20078L470)
- 05000282/LER-1994-009-01, :on 941029,design Basis Reconstitution Effort Uncovered Design Deficiency in Containment Isolation Function.Caused by Oversight During Original Plant Design. Procedures Revised + (ML20078L476)
- ML20078L478 + (ML20078L478)
- ML20078L487 + (ML20078L487)
- ML20078L495 + (ML20078L495)
- ML20078L497 + (ML20078L497)
- ML20078L504 + (ML20078L504)
- ST-HL-AE-4939, Forwards Revised Epips,Including Rev 4 to 0ERP01-ZV-EF07,rev 3 to 0ERP01-ZV-EF08,rev 2 to 0ER01-ZV-EF09,rev 3 to 0ERP01-ZV-EF18,rev 2 to 0ERP01-ZV-EF19,rev 2 to 0ERP01-ZV-EF20.W/o Encl + (ML20078L511)
- ML20078L517 + (ML20078L517)
- ML20078L520 + (ML20078L520)
- ML20078L521 + (ML20078L521)
- NG-94-4114, Monthly Operating Rept for Oct 1994 for Duane Arnold Energy Ctr + (ML20078L529)
- ML20078L532 + (ML20078L532)
- SECY-19-0055, SRM-SECY-19-0055: Crediting Options for Operator Actions and Law Enforcement Response + (ML20078L540)
- 05000374/LER-1994-008-09, :on 941019,reactor Scram Occurred Due to electro-hydraulic Control Line Break.Caused by Faulty Connector on EHC Permanent Magnet Generator 30 Volt Dc Power Supply.Connector Repaired + (ML20078L545)
- RC-94-0302, Forwards Modified NPDES Permit SC0030856 for VC Summer Nuclear Station.Submittal Provides Updated Info for Permit, Per Operating License NPF-12,App B + (ML20078L547)
- ML20078L548 + (ML20078L548)