TS Change Requests 93-12-0,94-46-0,94-51-0,94-52-0 & 94-53-0 to Licenses NPF-39 & NPF-85,changing Affecting TS Administrative Section 6.0
ML20078L281
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/21/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078L286 List:
References
NUDOCS 9411290143
Download: ML20078L281 (3)


Text

. .

Station support Department ci__ 10CFR50.90 PEco Energy Company Nuciear Group Headquarters 965 Chesterbrook Ocutevard Wayne. PA t9087-5691 November 21,1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request Nos.

93-12-0, 94-46-0, 94-51-0, 94-52-0, 94-53-0 Changes Affecting TS Administrative Section 6.0 Gentlemen; PECO Energy Company is submitting Technical Specificatiom (TS) Change Request Nos.93-124, 94-464,94-51-0,94-52-0, and 94-53-0 in accordance with 10CFR50.90, requesting changes to the TS (i.e., Appendix A) of Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2.

The proposed changes to the LGS, Unit 1 and Unit 2, TS, are as follows.

93-12-0, "NEEDS Organization Title Changes" 94 46 0, " Minimum Sh!ft Crew Composition" 94-51-0, " Delete Independent Technical Review Section from TS" 94-52-0, " Delete NRB Review Section from TS" 94-53-0, " Delete NRB Audit Section from TS" Information supporting these TS Change Requests are contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS TS are contained in Attachment 2. The proposed changes are indicated by a vertical bar in the margin of the affected TS page. These TS Chango Requests are being submitted under affirmation, and the associated affidavit is enclosed.

These TS Change Requests are being submitted concurrent with a PECO Energy request to reduce commitments to the LGS Quality Assurance Program de,uiption in accordance with 10 CFR 3 50.54(a)(3) by letter from G. A. Hunger dated Noveinber 21,1994. The proposed reduction in j commitnient ano these TS Change Requests are independent from each other. However, approval l for both requests are required for PECO Energy implementation.

We request that, if approved, these TS Change Requests for LGS, Units 1 and 2, be approved prior to January 3,1995 and become effective immediately upon issuance.

280012 9411290143 941121 PDR ADOCK 05000352 '

\

}I l P PDR

Nov:mber 21,1994 Page 2 If you have any questions, please do not hesitate to cor' tact us.

Very truly yours, 410 .

G. A. Hunger Jr.,

p.

Director - Liconain Attachments Enclosure cc: T. T. Martin, Administrator, Region 1, USNRC (w/ attachments and enclosure)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments and enclosure)

R. R. Janati, PA Bureau of Radiological Protection (w/ attachments and enclosure)

COMMONWEALTH OF PENNSYLVANIA .

ss.

COUNTY OF CHESTER W. H. Smith, Ill, being first duly sworn, deposes and says: That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the enclosed Technical Specifications Change Request Nos. 93-12-0,94-46-0,94-51-0,94-52 0, and 94-53-0, " Changes Affecting TS Administrative Section 6.0," for Limerick Generating Station, Unit 1 and Unit 2 Facility Operating Ucense Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

/

'V Vice President Subscribed and swc rn to before me this day of fM 994.

I

) 00/.

O kdNi9/6L

/ / h Nota'ry'Public Notvu!Seaf E&o A Svuonfbtar/ Pifate Trix'yennTan,Chester County My Cortvr.is%m EN'eG July 10.1C95