Inservice Testing Program Second Ten-Year Interval San Onofre Units 2 & 3 Pump Relief Requests 13 & 14
ML20078L438
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/22/1994
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20078L435 List:
References
NUDOCS 9411300036
Download: ML20078L438 (8)


Text

.__ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .

4

. INSERVICE TESTING PROGRAM SECOND TEN-YEAR INTERVAL SAN ONOFRE UNITS 2 AND 3 PUMP RELIEF REQUEST No. 13 1

SYSTEMS Units 2 & 3 Emergency Chilled Water (ECW), Component Cooling Water (CCW), Diesel Generator Fuel Oil (DGF0), Containment Spray System (CSS), Low Pressure Safety Injection (LPSI)

COMPONENTS ECW Pumps P160 and P162; CCW Seismic Make-up Pumps P1018 and P1019; DGF0 Transfer Pumps P093, P094, P095, P096 j CSS Pumps P012 and P013; LPSI Pumps P015 and P016;  ;

CLASS 2 and 3 I

F_ UNCTION To provide flow to safety systems.

TEST REQUIREMENTS Per OM-6 4.6.1.1:

lhe total loop accuracy for pressure and flow rate shall be j i 2% of full scale.

Per 0M-6 4.6.1.2.a:

The full-scale range of each analog instrument shall not be greater than three times the reference value.

BASIS FOR RELIEF Chilled Water Pumps, CCW Seismic Makeup Pumps, and DGF0 Transfer Pumps (See Table 1) l Relief is requested from the full scale range requirements of OM-6 4.6.1.2.a for the ECW Pumps, the CCW Seismic Make-up Pumps suction pressure gauges, and the DGF0 Transfer Pumps discharge pressure guages. The instruments listed in Table 1 do not meet the OM-6 4.6.1.2.a requirement (e.g., the full-scale range of each instrument shall not be greater than three times the reference value). As seen in Table 1, the ratios of Range / Reference Value vary from 3.3 to 6.2.

However, the manufacturer's stated accuracy for each pressure Page 1 of 5 9411300036 941122 PDR ADOCK 05000361 O PDR

INSERVICE TESTING PROGRAM SECOND TEN-YEAR INTERVAL SAN ON0FRE UNITS 2 AND 3 PUMP RELIEF REQUEST No. 13 instrument listed in Table 1 exceeds the OM-6, paragraph 4.6.1.1, required accuracy (plus or minus two percent of full scale) for pressure instruments by a factor of four. The combination of range and accuracy yields a reading that is significantly better than the reading achieved from instruments that meet the minimum Code requirements. Thus, installing a gauge that meets the 4.6.1.2.a requirements results in unnecessary labor with little or no benefit in monitoring capabilities.

Containment Spray and Low Pressure Safety Injection Pumps (See Table 2)

Relief is requested from the full scale range requirements of OM-6 4.6.1.2.a under certain scenarios for CSS pump suction pressures and LPSI pump suction and discharge pressures. For routine quarterly tests, which are performed on miniflow, these gauges meet the Code required limits. However, during refueling outages, the water from the Refueling Water Storage '

Tanks (RWSTs), which provide suction head to the pumps, is transferred to the refueling canal. This lowers the water level in the RWSTs and thus the reference suction pressure for the Inservice Tests (ISTs). In these circumstances of reduced suction pressure, the gauges do not always meet the 4.6.1.2.a requirements (i.e., they read less than one-third of full scale, See Table 2).

The reference discharge pressure readings are greater than one-third of the instrument range during the miniflow tests conducted quarterly. However, additional full flow tests are conducted at cold shutdown intervals in accordance with NRC Generic Letter 89-04. During these full flow tests, due to the lower RWST level and the change in system line-up, the reference discharge pressure drops below one-third of full scale of the installed instrumentation. As a consequence, the limits of 4.6.1.2.a are not met during the full flow tests.

The manufacturer's stated accuracy for each pressure instrument listed in Table 2 exceeds the OM-6, paragraph 4.6.1.1, required accuracy (plus or minus two percent of full scale) for pressure instruments by a factor of eight. Again, the combination of range and accuracy yields a reading that is significantly better than the reading achie.ed from instruments that meet the minimum Code requirements. Thus, Page 2 of 5

INSERVICE TESTING PROGRAM SECOND TEN-YEAR INTERVAL SAN ONOFRE UNITS 2 AND 3 PUMP RELIEF REQUEST No. 13 installing a gauge that meets the 4.6.1.2.a requirements results in unnecessary labor and radiation exposure with little or no benefit in monitoring capabilities.

Summary Even though the existing installed station instruments do not -

meet the Code range requirements of OM-6 4.6.1.2.a. their overall accuracy exceeds the Code requirements. Thus, the combination of range and accuracy of the installed instrumentation provides for the acquisition of repeatable data that meets the intent of the Code. The reference values listed in the Tables are based on historical data, and although future values may be lower than the values listed, the overall Code accuracy requirements would be met or exceeded under all conditions under which an IST would be performed.

The requirement to install temporary instrumentation to meet the letter of the Code requirements for range and accuracy imposes an undue burden on the plant staff resources, a risk of increased dose, and testing expense without a corresponding improvement in plant safety or quality.  :

ALTERNATE TESTING: Use installed instrumentation for inservice testing as listed on the attached tables.

Page 3 of 5 I

l

PUMP RELIEF REQUEST NO. 13 TABLE 1 Pump Parameter Instrument Reference Instr. Range Error Permitted As Installed Accuracy value(2) (Range /Ref. by Code (*) at Full Scale Value) (error at full scale)

Emergency Chilled Water Pumps l P160 Suction PI-9883B 27 psig 0-160 1.62 psig 0.5% (0.8 psig)

P162 Pressure PI-9883A (5.9)

Component Cooling Water Seismic Make-up Pumps P1018 Suction PI-6566 9.0 psig 0-30 0.54 psig 0.5% (0.15 psig)

P1019 Pressure PI-6565 (3.3)

Diesel Generator Fuel Oil Transfer Pumps P093 Discharge PI-5973 9.7 psig 0-60 0.58 psig 0.5% (0.3 psig)

P094 Pressure PI-5975 (6.2)

P095 PI-5976 P096 PI-5974 III Reference values are based on historical data for like pumps. Future values may be lower, but overaii u de accuracy requirements would be met or exceeded under all conditions under which an IST would be performed.

(2) The information in this column represents the gauge error permitted by the Code (3 times reference value X Code required accuracy of 2%).

i Page 4 of 5 l -

PUMP RELIEF REQUEST NO. 13 TABLE 2 Pump Parameter Instrument Nominal Worst Case Instr. Error As Installed Accuracy Quarterly (U Refueling Range Permitted at Full Scale Reference Reference (U (Rang Ref. by Code (4 (error at full scale)

, Value[')

Containment Spray System Pumps P012 Suction PI-9087 30 psig 19.7 psig 0-75 1.18 psig 0.25% (0.19 psig)

P013 Pressure PI-9085 (3.8)

LPSI P015 Suction PI-9081 31 psig 13 psig 0-60 0.78 psig 0.25% (0.15 psig)

.P016 Pressure PI-9083 (4.6)

P015 Disch Pressure PI-9082 215 psig 149 psig 0-500 8.94 psig 0.25% (1.25 psig)

P016 PI-9084 (3.4)

(U Reference values are based on historical data for like pumps. Future values may be lower, but overall Code accuracy requirements would be met or exceeded under all conditions under which an IST would be performed.

(2) The information in this column represents the gauge error permitted by the Code (3 times reference value X Code required accuracy of 2%) .

(3) For worst case' refueling reference. Gauges all meet the Code requirements under " normal" quarterly conditions.

Page_5 of 5

. INSERVICE TESTING PROGRAM SECOND TEN-YEAR INTERVAL SAN ONOFRE UNITS 2 AND 3 PUMP RELIEF REQUEST No. 14 SYSTEM: Units 2 & 3 Salt Water Cooling (SWC)

COMPONENTS: SWC Pumps P112, 113, 114, and 307 CLASS 3 FUNCTION To transfer heat from the Component Cooling System to the ultimate heat sink (Pacific Ocean) during normal and emergency conditions.

TEST REQUIREMENTS OM-6 6.1 reads as follows:

"If deviations fall within the Alert Range of Table 3, the frequency of testing specified in paragraph 5.1 shall be doubled until the cause of the deviation is determined and-the condition corrected. If deviations fall within the Required Action Range of Table 3, the pump shall be declared inoperable until the cause of the deviation has been determined and the condition corrected." Table 3b places the Alert Range for Differential Pressure (DP) for vertical line shaft pumps at 0.93 to <0.95 of the Reference DP, and the Required Action Range at <0.93 (and >1.10).

BASIS FOR RELIEF: Relief is requested from the lower level Alert Range and Required Action Range for vertical line shaft pump DP, as applicable to Salt Water Cooling Pumps P112, P113, P114, and P307.

The SWC pumps operate well above the flow and pressure differential assumed in the safety analysis. The margin from the current reference DPs to the DP required by the safety analysis limits is shown in the following table. The design operability curve for the pump with the least margin-(2P307) is also attached. It can be seen that any pump degraded by the 7% necessary to place it into the required action range per 0M-6 (Column 3) would still be well above the safety analysis limits (Column 4).

Page 1 of 3

4

. INSERVICE TESTING' PROGRAM .

SECOND TEN-YEAR INTERVAL -l

~

SAN ONOFRE UNITS 2 AND 3 PUMP RELIEF REQUEST No. 14  ;

i CURRENT REQUIRED SAFETY- MARGIN FROM REFERENCE ACTION LIMIT REFERENCE TO .

PUMP DP (FT) DP (FT) DP (FT) SAFETY. LIMIT N  ;

2P112 90.9 84.5 60.0 34%

2P113 82.2 76.4 59.0 28%

2P114 81.4 75.7 60.0 26%

2P307 78.0 72.5 60.0 23%

3P112 80.4 74.8 49.0 39%  !

3P113 81.2 75.5 .48.5- 40%

3P114 79.5 73.9 48.9 38%

- 3P307 88.7 82.5 47.5 46%

i 1)' Margin to safety = (Reference DP.- Safety Limit DP)/ Reference DP j The maintenance and operation history of the SWC pumps show that  :

the pumps will enter the Alert and/or Required Action Ranges very i early in the life cycle following a pump overhaul. Normal flow i through an operating pump is approximately 17,000 gpm, and j Inservice Tests (ISTs) are typically performed at ap3roximately 1 15,000 gpm. After normal conditions of pumping the lighly dilute slurry of ocean salt water and entrained sand, DP degrades- '

relatively quickly due to the expected erosion of pump internals and the opening up of internal-clearances. On a rotating basis, one SWC pump'per unit is operating continuously, so that these i pumps accumulate many operating hours under these conditions -

between quarterly tests. This results in the pumps entering the 1 Alert Range of <95% reference DP while using only a small portion  ;

of the margin to the safety limits, and with virtually no degradation from the intended safety function. Being in the Alert  !

(or Required Action) Range results in a nonproductive cycle of-  ;

increased surveillance testing and additional maintenance activity -l with no benefit in improved safety. The-wear mechaaism of the  !

pumps is expected and well understood. The DPs (anil other i parameters, including vibration and spectra) are trended and l analyzed to ensure. that no additional problems are accurring. '

1 The requirement to perform corrective action when the pump J parameters reach the Code Alert limits imposes an undue burden on l the plant staff-resources and an undue expense without h corresponding improvement in plant safety or qur.lity. .Even in the worn condition,- when the DP is below the Alert or Raquired Action limits of Table 3b, the SWC pumps are considered to be operating satisfactorily. Requiring repair or adjustment each time the lower limits of Table 3b are reached is unnecessary because the pumps can continue to operate satisfactorily for a substantial Page 2 of 3 l 1

. 1

. I l

. INSERVICE TESTING PROGRAM SECOND TEN-YEAR INTERVAL SAN ON0FRE UNITS 2 AND 3 l l

PUMP RELIEF REQUEST No. 14 range below the Code limits and meet all safety performance requirements.

ALTERNATIVE TESTING:

Revise the evaluation ranges of these pumps as follows:

Alert Range: 0.87 to <.90 of reference DP Required Action Range: <0.87 (and >1.10) of reference DP This would still maintain a minimum of 10% margin to the safety limits in the most conservative case (2P307). Vibration limits would remain as required in OM-6 Table 3a.

l l

l Page 3 of 3

ea *+m* ,

.l

+f-... + - . -++of..'.

=+,u. -  ; 9.
:g w-*-

-  ; _, _ .;_ y - --

=f l :w.=.E,.m..a

t2#

s m

  1. a. -- .:g.s=r.
-:~~~~

_ UNII 2 - SALT WATER C0t t l IH9E25ss=isfis e=====r ~=istss5E.1 2P307 BYRON J6 m 4:2 4 y=.3

.-3 h a -

f

=.. , _ ,

- _. : g;=Y.;,'p

        • :-+m-.-ia:: ** ~^Z*~.nn=* -
  • =

. 3- . -

m,:. ; tr:

i

_ . =.,

. ;.ir r .2*1 ---

1:=:n. _._.._ '_=:- r -

._a. .y . - -.

r.- . _ . . - .g. .

+ . , ~ .-m .

r M

]

.=12.a.h_

== nt :nuu t::s MANUFACTURER CERTJ

. _ y .-- _-

[j  :~.f r_ . .w_2. =

2 :tg;; ;t:=I. --/ i--

)

iis -

==:=g;;

22 - _ . - - _

gp 349 f  : +

.u_.4 .;- - .t:

-L:=1-mfw ?*---+

xg! -- -

,.x

_7

= N-+- - !

33

, rt,, _ "---+-4-4++L +++.+++ .

++.-M '

= -

_2_,_,,,,,_

-;_ . _ g , --.

  • ";"~~*

C Ei 120 ~*

H

' N .: _

~*

is is=gsg - t==

E @

Es A "~~' ~ t .

  • ="_

55 100 -..

_1 O sg -

r-"- t=-. ~

i jij T.r t 4s -

~ ~ ~

C

%--- t s=  ::.=: - +-+ .

(ft) Es

=:J- *~~~

E5  : -.t-.=::=+ - ~~'

80 Is -

=

+

ig -

Of:: '

y=

e; ~

y =- _- 2.::-

- .n =

== .

g 60 -+-~

:

iti DESIGN .

-- n- OPERABILITY CURVE  %=

a --

3 4o

+--

n ---.-

_3_, =1 n= ,

~ -

~.

-1.. -
3

~

b '

b 5000 10,'000 15,'000 i==e .

~; 4

b+-~ -

~.T +

  • ~~- -

FLOW RATE (gpm) 1 REDRAWN ON CAD & INCORP. COMMENTS sh 0 ISSUED AS-BUILT A

NO DESCRIPTION NO DESCRIPTION DAl REFERENCES REVISIC SCE XX-XXX NEW 1/92 ,

g l

.. , ~ ... . . -. . - .. . . . . , . _ . .. ,..- - n .. _

~ ^

AWN. -T- *~ -- Q -G-Q s:Y

, v u_

i

.f.g ., . -- -.

. 4 [* ,,,.na >k ~. onW W,s.5,:A M, -

v % Ws.% -d.w *

...s..i'h .ec~ 1

%,Q l?[ AV >islf*QD,xw.*A. .-

e ,Q r ' '*es. . *

. M ,

  • d.b > -- j ^ 8
  • a suswa
d 1-~

..s Wr&ktIA & 9h.[.~L$W,D32 $33X!MM*~A'~ . . . - .

. wc:e u x' % s.'c' ~ w. . .m d D D R M ---- --

h Attachment to Pump Relief Request No. 14 __

LINGPUMP;IAG.NO. 5 REFERENCES gKSON S.N. 741-L-0436 5

,- F 1. MEMORANDUM FROM V.BARONE TO S.R. GOSSELIN, i "

~

r!=-< DATED JUNE 22,1992, (CDM #C920630S1057-4)

SUBJECT:

INSERVICE TESTING 0F PUMPS, DESIGN

]FIED TEST CURVE

!2 ^

  • 7 - - - - -
2. VENDOR DOCUMENT NUMBER S023-405-3A-56-0.

e ,

- 3. MEMORANDUM FOR FILE, PUMP DESIGN OPERABILITY

.- T' CURVES, SONGS 2/3, DATED OCTOBER 15,1992

- ' ~

(CDM #C921019S3006).

n -

~'

J.  %

N0TES: 1 a

T -

MIN. REQUIRED FLOW 13,750 GPM (REF.11 y _ MIN. REQUIRED TDH 62.73 FT (REF. 11 I

~~

- @ 13,750 GPM

. MCTC HEAD 92.0 FT (REF.2)

'S ~ ~

h ._.

@ 13,750 GPM i ..

DESIGN MARGIN 31.8%

-c m,,. 'x_ _

J. ]~~]

@ 13,750 GPM 4

__ , =:==

~'

7 .

THE DESIGN OPERABILITY CURVE WAS DEVELOPED

. Ebt= IN ACCORDANCE WITH THE METHODOLOGY SPECIFIED i mA - i. - - w IN REF.3 FOR THE AXIAL FLOW PUMPS, AND 1 2.1 Ex ENVELOPES THE MINIMUM DESIGN REQUIREMENTS

'x_ _

SPECIFIED IN REF.1. , .3.

p.

a 3 . . .

20.'000 L- # '

q- - .

i'

, < . J: s, f m- q.n _. d )

- OC II UNIT 2 v 12 LOCATION: SAN ONOFRE NUCLEAR GENERATING STATION 8 ]

,v>

' Mk B - w+ miw SALTWATER COOLING PUMP E m

TAG NO. 2P-307 IST CURVES 8 N

u Southern Collfornia Edison 1 8 MADE CKD RE IRE GS DM OTHER as 41067 Sh.4 "

I s4 l5 L __

fusooo3(o- vO'_

~