Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078J680 + (ML20078J680)
- ML20078J683 + (ML20078J683)
- ML20078J688 + (ML20078J688)
- ML20078J691 + (ML20078J691)
- ML20078J699 + (ML20078J699)
- ML20078J703 + (ML20078J703)
- 05000316/LER-1983-092-01, /01T-0:on 830926,during Routine Sampling of Boron Injection Tank,Sampling Valves at Tank Outlet Left Partially Open.Caused by Personnel Error.Appropriate Administrative Actions Taken Against Individual Involved + (ML20078J705)
- ML20078J718 + (ML20078J718)
- 05000328/LER-1995-001, :on 950105,turbine Tripped Followed by Reactor Trip.Caused by Pressure Surges in Transformer Cooling Oil, Actuating gas-operated Relay.Cr Personnel Responded as Prescribed by Emergency Procedures + (ML20078J723)
- ML20078J735 + (ML20078J735)
- ML20078J736 + (ML20078J736)
- BECO-LTR-95-010, Identifies Instances in Addition to Those Reported in Previous Correspondence,Informing NRC of Instances in Which Util Actual Corrective Actions for Dcrdr Project Differed Substantially from C/A Reported in Final Summary Rept + (ML20078J737)
- ML20078J746 + (ML20078J746)
- ML20078J747 + (ML20078J747)
- ML20078J750 + (ML20078J750)
- ML20078J760 + (ML20078J760)
- ML20078J768 + (ML20078J768)
- ML20078J772 + (ML20078J772)
- ML20078J779 + (ML20078J779)
- ML20078J797 + (ML20078J797)
- ML20078J798 + (ML20078J798)
- ML20078J810 + (ML20078J810)
- 05000306/LER-1983-022-03, /03L-0:on 830909,steam Flow Transmitter Found Out of Calibr Low by 1%.Cause Unknown.Transmitter Returned to Vendor for Analysis.Rosemount Model 1153HA6 Differential Pressure Transmitter Replaced + (ML20078J817)
- ML20078J822 + (ML20078J822)
- ML20078J827 + (ML20078J827)
- ML20078J834 + (ML20078J834)
- 05000328/LER-1983-121-03, /03L-0:on 830911,during Mode 5,lower Containment Airlock Failed Overall Leakage Test SI-159.1.Caused by Leakage Through Four Handwheel Packings Due to Normal Wear. Doors Overhauled + (ML20078J845)
- ML20078J846 + (ML20078J846)
- ML20078J847 + (ML20078J847)
- U-602407, Responds to NRC 941228 RAI on Potential Concern Re Requirements for Inoperable ECCS Actuation Instrumentation During Plant Shutdown Conditions,Per Review of Util Request to Implement Improved TS + (ML20078J850)
- ML20078J853 + (ML20078J853)
- NRC-95-4391, Forwards non-proprietary WCAP-14271 & Proprietary WCAP-14270 AP600 Low Pressure Integral Sys Test at or State Univ, Facility Scaling Rept. Rept WCAP-14270 Withheld (Ref 10CFR2.790) + (ML20078J856)
- ML20078J864 + (ML20078J864)
- ML20078J869 + (ML20078J869)
- ML20078J874 + (ML20078J874)
- ML20078J878 + (ML20078J878)
- ML20078J881 + (ML20078J881)
- ML20078J883 + (ML20078J883)
- BECO-94-124, Advises That Shroud Repair Plans & Analysis Will Be Submitted to NRC for Review & Approval No Later than 950116 + (ML20078J915)
- ML20078J923 + (ML20078J923)
- 05000416/LER-1995-001, :on 950106,discovered That 25% Grace Period for I&C Quarterly Surveillance 06-IC-1C51-Q-0001 Attachment IV Missed by Four Days.Ts 4.0.3 Initiated & Surveillance Successfully Performed + (ML20078J924)
- ML20078J926 + (ML20078J926)
- ML20078J930 + (ML20078J930)
- NRC-94-0120, Forwards Rev 0 to Fermi 2 COLR Cycle 5 + (ML20078J958)
- ML20078J972 + (ML20078J972)
- ML20078J977 + (ML20078J977)
- ML20078J978 + (ML20078J978)
- LIC-95-0018, Forwards OPPD Annual Accounting for Period of Jan-Dec 1994, as Required by FCS Decommissioning Funding Plan Trust Agreement + (ML20078J979)
- ML20078J983 + (ML20078J983)
- ML20078J985 + (ML20078J985)
- ML20078J997 + (ML20078J997)