OPERATING DATA REPORT DOCKET NO.
50-286 DATE 10/01/83 COMPLETED BY L-Kellv TELEPHONE (9141 739-8200 OPERATING STATUS
- 1. Unit Name: Jndian Point No. 3 Nuclear Power Plant
. otes
- 2. Reporting Period:
sentember 1983
- 3. Licensed Thermal Power (MWt):
3025
- 4. Nameplate Rating (Gross MWe):
1013
- 5. Design Electrical Rating (Net MWe): -
965
- 6. Maximum Dependable Capacity (Gross MWe):
1000 965
- 7. Maximum Dependable Capacity (Net.MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net.MWe):
- 10. Reasor.s For Restrictions. lf Any:
This Month Yr.-to-Date Cumulative 720 6551.0 62,112.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
333.7 34,424.5
- 13. Reactor Resc:ve Shutdown Hours 0
0 0
j i
- 14. Hours Generator On-Line 0
229.1 33,142.0 f
- 15. Unit Reserve SNtdown Hours 0
0 0
0 282,244 86,425,645
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 68.310 26.366.610 0
60,735 25.244.178
- 18. Net Electrical Energy Generated (MWH1 0
3.5 53.4
- 19. Unit Service Factor 0
3.5 53.4
- 20. Unit Availability Factor 0
1.0 42.1
- 21. Unit Capacity Factor (Using MDC Net) 0 10 42.1
- 22. Unit Capacity Factor (Using DER Net) 100 91.6 19._4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
25 If Shut Down At End Of Report Period. Estimated Date of Startup:
January 1984 26 Units in Test Status tPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
/O COMMERCIAL OPERATION D310170603 831001 PDR ADOCK 05000286 RL E1
DOCKET NO.
50-286 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME NO-3 _
DATE October 1.
1983 COMPLETED R I
lv REPORT MONTil sentember 1983 3
.3== =a Licensee c%,
5"
.=2 _e s
ci c
c Cause & Corrective 7
o S-3 Action to No.
Date g
3g g
,;g g 5 Evens s?
$E E
3i 5 y Report a
<E 0
$U Prevent Recurrence o
O 3
830618 F
720 A
3 N/A N/A Electrical malfunction in the main generator.
I I
2 3
4 F: Forced Reason:
Methoel:
Exlubit F-Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data H-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NURI.G-D. Regulatory Resiriction 4-Ot her (Explain) 0161) 1 -Operator Training & Iicense lisamination F-Administ rative 5
G-Operational Er ror (l'xplain)
Exhibit 11-Same Source 19/77)
Il-Ot her ( E xplain)
AVERAGE DAILY UNIT POWER LEVEL COCKET NO.
50-286 Indian Point UNIT No. 3 DATE october 1, 1983 COMPLETED BY L-Kelly TELEPHONE (914) 739-8200 MONTH september 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) iMwe-Net) 1 0
17 0
2 0
0 gg 3
0 39 0
4 0
20 0
5 0
21 0
6 0
0 22 7
0 23 0
8 0
0 24 9
0 0
25 10 0
0 26 11 0
27 0
0 32 0
yg 13 0
U 29 0
0 14 30 15 0
33 16 0
INSTRUCTIONS On this format list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77 )
i!ri i
3 8
9 1
H N
r T O
e N I
b O T
m M C
e A
tp E
e V
S I
TC ERR OC NO I
T T
R C
O N
F U
E.
F L
i A
E H
CNANETN IAM YLHTNOM TN E
S M
P I
U Q
E EN O
N E
T AD f
RW M
9 e
a i!
l1, j
l I
1 Il:
4
MONTHLY I & C CATECORY I REPORT September 1983 MONTH W.R. I DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION IC-1906 5/05/83 Control Room A'ir-Conditioning Improper indication in " Normal" Replaced agastat relay.
Damper "C".
mode.
IC-1981 7/22/83 Plant Vent Radiation Monitor Filter paper does not advance Replaced filter drive motor R-13.
f 6
e 4
O O
9 i
f SUfeiARY OF OPERATING EXPERIENCE SEPTEMBER 1983 Indian Point Unit 3 remains in a forced outage caused by a malfunction in the main electrical generator.
Repairs are now in progress and it is estimated that the unit will be returned to service in January 1984.
I
indian Point 3 tuckar Power Plant e
P.O. Box 215 Buchanan, New Yorx 10511 914 139.8200
- > NewYorkPbwer 4# Authority October 7, 1983 IP-LK-3227 Docket No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1983.
Very truly yours, (9
h John rons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WPO S. V. Fuller, NYO
[
W. R. Yario, NYO INPO Records Center
- I Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339
-