Monthly Operating Rept for Sept 1983
ML20078J683
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/01/1983
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-3227, NUDOCS 8310170603
Download: ML20078J683 (7)


Text

-.

OPERATING DATA REPORT DOCKET NO.

50-286 DATE 10/01/83 COMPLETED BY L-Kellv TELEPHONE (9141 739-8200 OPERATING STATUS

1. Unit Name: Jndian Point No. 3 Nuclear Power Plant

. otes

2. Reporting Period:

sentember 1983

3. Licensed Thermal Power (MWt):

3025

4. Nameplate Rating (Gross MWe):

1013

5. Design Electrical Rating (Net MWe): -

965

6. Maximum Dependable Capacity (Gross MWe):

1000 965

7. Maximum Dependable Capacity (Net.MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,If Any (Net.MWe):
10. Reasor.s For Restrictions. lf Any:

This Month Yr.-to-Date Cumulative 720 6551.0 62,112.0

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 0

333.7 34,424.5

13. Reactor Resc:ve Shutdown Hours 0

0 0

j i

14. Hours Generator On-Line 0

229.1 33,142.0 f

15. Unit Reserve SNtdown Hours 0

0 0

0 282,244 86,425,645

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 68.310 26.366.610 0

60,735 25.244.178

18. Net Electrical Energy Generated (MWH1 0

3.5 53.4

19. Unit Service Factor 0

3.5 53.4

20. Unit Availability Factor 0

1.0 42.1

21. Unit Capacity Factor (Using MDC Net) 0 10 42.1
22. Unit Capacity Factor (Using DER Net) 100 91.6 19._4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

25 If Shut Down At End Of Report Period. Estimated Date of Startup:

January 1984 26 Units in Test Status tPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

/O COMMERCIAL OPERATION D310170603 831001 PDR ADOCK 05000286 RL E1

DOCKET NO.

50-286 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME NO-3 _

DATE October 1.

1983 COMPLETED R I

lv REPORT MONTil sentember 1983 3

.3== =a Licensee c%,

5"

.=2 _e s

ci c

c Cause & Corrective 7

o S-3 Action to No.

Date g

3g g

,;g g 5 Evens s?

$E E

3i 5 y Report a

<E 0

$U Prevent Recurrence o

O 3

830618 F

720 A

3 N/A N/A Electrical malfunction in the main generator.

I I

2 3

4 F: Forced Reason:

Methoel:

Exlubit F-Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data H-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NURI.G-D. Regulatory Resiriction 4-Ot her (Explain) 0161) 1 -Operator Training & Iicense lisamination F-Administ rative 5

G-Operational Er ror (l'xplain)

Exhibit 11-Same Source 19/77)

Il-Ot her ( E xplain)

AVERAGE DAILY UNIT POWER LEVEL COCKET NO.

50-286 Indian Point UNIT No. 3 DATE october 1, 1983 COMPLETED BY L-Kelly TELEPHONE (914) 739-8200 MONTH september 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) iMwe-Net) 1 0

17 0

2 0

0 gg 3

0 39 0

4 0

20 0

5 0

21 0

6 0

0 22 7

0 23 0

8 0

0 24 9

0 0

25 10 0

0 26 11 0

27 0

0 32 0

yg 13 0

U 29 0

0 14 30 15 0

33 16 0

INSTRUCTIONS On this format list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77 )

i!ri i

3 8

9 1

H N

r T O

e N I

b O T

m M C

e A

tp E

e V

S I

TC ERR OC NO I

T T

R C

O N

F U

E.

F L

i A

E H

CNANETN IAM YLHTNOM TN E

S M

P I

U Q

E EN O

N E

T AD f

RW M

9 e

a i!

l1, j

l I

1 Il:

4

MONTHLY I & C CATECORY I REPORT September 1983 MONTH W.R. I DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION IC-1906 5/05/83 Control Room A'ir-Conditioning Improper indication in " Normal" Replaced agastat relay.

Damper "C".

mode.

IC-1981 7/22/83 Plant Vent Radiation Monitor Filter paper does not advance Replaced filter drive motor R-13.

f 6

e 4

O O

9 i

f SUfeiARY OF OPERATING EXPERIENCE SEPTEMBER 1983 Indian Point Unit 3 remains in a forced outage caused by a malfunction in the main electrical generator.

Repairs are now in progress and it is estimated that the unit will be returned to service in January 1984.

I

indian Point 3 tuckar Power Plant e

P.O. Box 215 Buchanan, New Yorx 10511 914 139.8200

  1. > NewYorkPbwer 4# Authority October 7, 1983 IP-LK-3227 Docket No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of September, 1983.

Very truly yours, (9

h John rons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WPO S. V. Fuller, NYO

[

W. R. Yario, NYO INPO Records Center

  1. I Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339

-