Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076M259 + (ML20076M259)
- ML20076M263 + (ML20076M263)
- ML20076M265 + (ML20076M265)
- ML20076M273 + (ML20076M273)
- ML20076M277 + (ML20076M277)
- ML20076M278 + (ML20076M278)
- ML20076M279 + (ML20076M279)
- ML20076M282 + (ML20076M282)
- ML20076M284 + (ML20076M284)
- 05000249/LER-1983-024-03, /03L-0:on 830615,while Performing Component Cooling Svc Water Pump Test,Pressure Regulating Valve Mo 3-1501-3B Could Not Be Opened Past 50% Using Differential Pressure Controller.Caused by High Resistance + (ML20076M286)
- ML20076M291 + (ML20076M291)
- ML20076M299 + (ML20076M299)
- ML20076M304 + (ML20076M304)
- ST-HL-AE-4917, Submits Eight Responses to RAI Re Compliance W/Station Blackout Requirements + (ML20076M305)
- ML20076M313 + (ML20076M313)
- 05000289/LER-1994-006-01, :on 941002,inadvertent Actuation of EG-Y-1B Occurred Due to Personnel Error.Lead replaced,86B/E Relay Reset & EG-Y-1B Breaker Automatically Closed + (ML20076M316)
- ML20076M330 + (ML20076M330)
- ML20076M335 + (ML20076M335)
- ML20076M337 + (ML20076M337)
- NRC-94-0102, Provides Status of Detroit Edison Initiatives on Pressure Locking & Thermal Binding of Gate Valves + (ML20076M341)
- ML20076M345 + (ML20076M345)
- ML20076M347 + (ML20076M347)
- LIC-94-0198, Discusses Info Re Use of Cecor Power Peaking Uncertainties at Fort Calhoun Station + (ML20076M348)
- ML20076M352 + (ML20076M352)
- ML20076M364 + (ML20076M364)
- ML20076M366 + (ML20076M366)
- ML20076M367 + (ML20076M367)
- ML20076M368 + (ML20076M368)
- 05000237/LER-1983-049-03, /03L-0:on 830616,while Attempting to Equalize Torus/Drywell Differential Pressure,Valves 2-1601-60 & 61 Would Not Open.Caused by Inadvertent Closure of Air Supply Isolation Valve 2-4713-512.Valve Opened + (ML20076M370)
- ML20076M372 + (ML20076M372)
- ML20076M375 + (ML20076M375)
- ML20076M376 + (ML20076M376)
- ML20076M407 + (ML20076M407)
- ML20076M410 + (ML20076M410)
- ML20076M414 + (ML20076M414)
- ML20076M424 + (ML20076M424)
- ML20076M429 + (ML20076M429)
- ML20076M430 + (ML20076M430)
- 2CAN119402, Clarifies Util Intention to Not Install Replacement Breakers in Next Practical Refueling Outage for ANO Unit 2, Per Concern Raised Re Circuitry Isolation During Electrical Distribution Sys Functional Insp of Facility + (ML20076M457)
- 05000271/LER-1994-011, :on 941005,failure to Properly Identify All Areas Requiring Emergency Lighting Units in Accordance w/10CFR50 App R,Section Iii.J Identified.Caused by Cognitive Human Error.Task Team Evaluation Initiated + (ML20076M462)
- 05000298/LER-1994-024, :on 941002,inoperable Condition of Halon Sys in Svc Water Pump Room Identified.Caused by Inadequate Procedures.Procedure 0.39, Fire Watch Will Be Revised.W/ + (ML20076M465)
- ST-HL-AE-4908, Forwards Change QA-023 to Operations QA Plan. Change Will Be Incorporated in Operations QA Plan in Next Biennial Update + (ML20076M469)
- ML20076M470 + (ML20076M470)
- ML20076M474 + (ML20076M474)
- NRC-94-4330, Forwards Proprietary AP600 Notrump Core Makeup Tank Preliminary Validation Rept, MT01-GSR-001,Rev 0.Rept Withheld (Ref 10CFR2.790) + (ML20076M483)
- ML20076M488 + (ML20076M488)
- ML20076M492 + (ML20076M492)
- NRC-94-0108, Forwards Test Rept Re Results of Special Control Ctr HVAC Fan Pressure Test + (ML20076M493)
- RBG-39360, Submits 1994 Evaluated Exercise objectives,90 Days in Advance,To Be Fulfilled During River Bend Station Emergency Planning Exercise + (ML20076M498)
- ML20076M499 + (ML20076M499)
- 05000266/LER-1994-011, :on 941004,discovered That on 940409 Redundant DHR Requirements Not Met During Refueling Outage Due to Inadequate Communication to Operators Re Interpretation of TS 15.3.1.A.3.b.Both RHR Pumps Secured + (ML20076M500)