ML20076M366
| ML20076M366 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/11/1983 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-73(83), NUDOCS 8307200289 | |
| Download: ML20076M366 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
! y 'p b. g i! "E ),.
6 r
nj 14 p rpToj; y
ti i ji 4 i
- t. l ] t,.
pg 4
<uL t.,
4
~
e i.,i a <
s.,
s, t
P.o. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.
- 55 PUBLIC $oVARE Semng The Best Location on the Nation MURRAY R. EDELMAN VICE PRESIDENT July 11, 1983 NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement 1
U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Borg-Warner Valve Radiographs (RDC 73(83)]
Dear Mr. Keppler:
l Our interim report to you dated June 10, 1983, stated that our final report on the subject valve radiographs would be submitted July 10, 1983.
The forty-l four valves selected as a representative sample were re-radiographed by Magnaflux Corporation. These radiographs were then submitted to Borg-Warner for their J
review and acceptance.
I Borg-Warner and their Authorized Nuclear Inspector (ANI) have completed their review and returned the film to site.
PNPP personnel are currently performing their evaluation.
Results of both reviews will be discussed at a meeting scheduled at the PNPP site July 12 and 13,1983.
Participants at this meeting include those identified in our June 10, 1983, report.
As discussed between Mr E. Riley of The Cleveland Electric Illuminating Company and Mr. J. Konklin of your office on July 8, 1983, our final report on this subject is now scheduled to be submitted August 31, 1983.
1 Please call if there are additional questions.
Sincerely, h
l Murray R.
elman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner U.S. Nuclear Regulatory Commission NRC Site Office c/o Document Management Branch Washington, D.C.
20555 Director Office of Inspection and Enforcement Records Center, SEE-IN U.S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D.C.
20555 1100 Circle 75 Parkway, Suite 1500,p FGO7200289 830711 Atlanta, Georgia 30339 g
PDR ADOCK 05000440 g
S PDR JUL 141983 'l'