Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069A259 + (ML20069A259)
- ML20069A270 + (ML20069A270)
- ML20069A274 + (ML20069A274)
- ML20069A276 + (ML20069A276)
- ML20069A279 + (ML20069A279)
- ML20069A282 + (ML20069A282)
- 05000416/LER-1982-166-99, Fire Barriers Broken in Control Bldg Computer Room & Upper Cable Spreading Room to Route Cables Under Maint Work Authorization.Caused by Planned Maint Activity.Penetration Closed & Sealed + (ML20069A284)
- ML20069A302 + (ML20069A302)
- ML20069A303 + (ML20069A303)
- ML20069A305 + (ML20069A305)
- ML20069A318 + (ML20069A318)
- ML20069A333 + (ML20069A333)
- ML20069A336 + (ML20069A336)
- ML20069A338 + (ML20069A338)
- ML20069A339 + (ML20069A339)
- RBG-14-524, Interim Deficiency Rept DR-95 Re Possible Defect in Plate & Face Plate Gaskets for Hydrogen Ignitor Model 6043 Assemblies.Initially Reported on 830204.Investigation Continuing.Next Rept Will Be Submitted by 830606 + (ML20069A343)
- ML20069A349 + (ML20069A349)
- ML20069A353 + (ML20069A353)
- ML20069A356 + (ML20069A356)
- ML20069A360 + (ML20069A360)
- ML20069A364 + (ML20069A364)
- ML20069A367 + (ML20069A367)
- NRC-94-4138, Forwards Rev 6 to AP600 Design Certification Test Program Overview, for 940505.Document Provides Overview of AP600 Test Programs Supporting AP600 Design Certification Application + (ML20069A369)
- ML20069A370 + (ML20069A370)
- ML20069A374 + (ML20069A374)
- ML20069A376 + (ML20069A376)
- ML20069A397 + (ML20069A397)
- ML20069A407 + (ML20069A407)
- 05000334/LER-1994-003, :on 940404,two Flow Orifices Were Found Improperly Installed.Caused by Improper Installation. Corrective Actions:Proper Installation of All Accessible Flow Orifices Verified + (ML20069A413)
- ML20069A417 + (ML20069A417)
- ML20069A423 + (ML20069A423)
- ML20069A427 + (ML20069A427)
- ML20069A443 + (ML20069A443)
- ML20069A444 + (ML20069A444)
- ML20069A448 + (ML20069A448)
- ML20069A452 + (ML20069A452)
- ML20069A455 + (ML20069A455)
- ML20069A460 + (ML20069A460)
- ML20069A462 + (ML20069A462)
- ML20069A463 + (ML20069A463)
- ML20069A468 + (ML20069A468)
- ML20069A475 + (ML20069A475)
- ML20069A476 + (ML20069A476)
- ML20069A482 + (ML20069A482)
- ML20069A487 + (ML20069A487)
- 05000456/LER-1994-008-03, :on 940421,both DGs Declared Inoperable Due to Misinterpretation of Surveillance Data.Caused by Personnel Error.Dg 550 Load Rejection Test for DGs 1A & 1B Reperformed After Adjusting Kvar Loading + (ML20069A493)
- 05000328/LER-1994-005-02, :on 940419,determined Containment Leak Rate TS Limits Exceeded.Caused by Failure of Relief Valve Bellows & Check Value Leaking Through Seat.Failed Valve Replaced.W/ + (ML20069A503)
- ML20069A509 + (ML20069A509)
- HL-4593, Forwards Simulator Certification Form 474 Quadrennial Rept, in Compliance W/Requirements of 10CFR55.45(b)(5)(ii) + (ML20069A528)
- ML20069A540 + (ML20069A540)
- ML20069A541 + (ML20069A541)