Responds to NRC Re Violations Noted in IE Insp Rept 50-331/82-18.Corrective Actions:Valve line-ups Immediately Verified,Valves Properly Locked & Personnel Reinstructed
ML20069A360
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/28/1983
From: Root L
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20069A355 List:
References
NG-83-749, NUDOCS 8303150612
Download: ML20069A360 (2)


Text

Iowa Electric Light and kwer Company February 28, 1983 NG 749 UTEE.i[on u (X Nt(:1.fAH DMMON Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Connission 799 Roosevelt Road Glen Ellyn, IL 60137 Re:

Duane Arnold Energy Center

Subject:

Response to Inspection Report 82-18, concerning locked valves File:

A-102, NRC-4, Inspection Report 82-18

Dear Mr. Keppler:

This letter is in response to Mr. J. F. Streeter's letter of January 26, 1983 concerning a routine safety inspection at the Duane Arnold Energy Center conducted October 1 through November 30, 1982. The following response indicates the actions which have been taken to correct the one item of noncompliance noted in the subject Inspection Report.

l Item of Noncompliance l

Technical Specification 6.8.1 requires, in part, that procedures be adhered to for the surveillance and testing area.

Surveillance Test Procedure 41A006, Step 4.6.E requires that valves V-18-07, V-18-08, and V-18-16 be locked in their required position.

Contrary to the above, the chain lock was not attached to the pipe following l

the performance of STP 41A006 on October 20, 1982, af ter valves V-18-07, V-18-08, and V-18-16 were properly positioned.

Response

1.

Corrective action taken and results achieved:

The valve line-ups were immediately verified and the valves properly locked.

8303150612 830311 PDR ADOCK 05000331 G

PDR Gerwral Ofice

  • lu Ik)\\ 351
  • Cedar llapith. Irma 52406

Mr. James G. Keppler NG-83-749 February 28, 1983 Page Two 2.

Corrective action taken to avoid fucther noncompliance:

Prior to this occurrence, a procedural definition of a locked valve was drafted and was subsequently approved by the DAEC Operations Committee.

The definition was also reviewed and deem adequate by the Safety Committee.

All surveillance test procedures (STPs) and operating instructions (0Is) which involve safety systems with locked valves are being modified to 1) contain the procedural definition of a locked valve, and 2) provide for independent verification of valve lineup and locked status.

In addition, all personnel having responsibility for maintenance and verification of proper valve locking have been reinstructed as to the correct procedure of locking valves and the necessity for adherence.to the method.

3.

Date when full compliance will be achieved:

The definition of a locked valve was approved by the DAEC Operations Committee on September 9, 1982, and reviewed by the Safety Committee on January 28, 1983.

Personnel reinstruction was completed on December 1,1982.

Modification of all STPs and 0Is will be completed prior to startup after the current refueling outage.

Very truly yours, ke W. Y Larry D. Roo Assistant Vice President I

Nuclear Generation LDR/ DEW /kmf cc:

D. Wittner D. Arnold L. Liu S. Tuthill NRC Resident Inspector l

Ref: Commitment Control No. 830003 1

.