Notifies That Number of Differences Identified Between Info in NRC Database & That Previously Provided by Util in Response to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, as Requested in NRC
ML20069A452
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/18/1994
From: Tremblay L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-56, GL-92-01, GL-92-1, NUDOCS 9405250205
Download: ML20069A452 (1)


Text

,

r

,VIIRMONT YANKEE P

NUCLEAR POWER CORPORATION

..q Ferry Road, Brattleboro, VT 05301-7002 f

ENGINEERINGOFFICE

'/

580 MAIN STREET BOLTON, MA 01740 (508) 779-6711 May 18,1994 BVY 94-56 United States Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555

References:

a.

License No. DPR-28 (Docket No. 50-271) b.

Letter, USNRC to VYNPC, NVY 94-47, dated April 18,1994

Subject:

Generic Letter 92-01, Revision 1, " Reactor Vessel Stmetural Integrity" In Reference (b), the NRC requested Vermont Yankee to verify that the information previously 3rovided by Vermont Yankee in response to the subject Generic Letter has been accurately entered

)y the NRC into the database as enclosed with Reference (b). It was re NRC within 30 days of any inconsistencies which may be identified; guested that w if no inconsistency is identified, the NRC Staff will consider our actions related to the subject Generic Letter to be complete.

The purpose of this letter is to provide formal notification to you, as requested in Reference (b), that a number of diffennces have been identified between the information in the NRC database and that previously provided by Vermont Yankee in response to the subject Generic letter. We have been in contact with the Vermont Yankee NRC/NR.R Project Manager and your technical staff regarding these differences.

We are presently completing our evaluation of Reference (b) and will provide a more detailed response as soon as our evaluation effons have been completed. Should you have any questions, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER C RPORATION

$$\\

y Leonard A. Tremblay, Jr., P.E.

Senior Licensing Engineer cc:

USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager-VYNPS I O