d AC40 - R A NRC MONTHLY OPERATING REPORT J2.

RE b k ATE t o/63 COMPLETED BY L. Mayweather TELEPHOSE 714/492-/700 Ext. 56223 OPERATING STATUS San Onofre Nuclear Generating Station, Unit 2 I

  • U"I' h.***

i 5eptember inrough 30 5 epi. ember,1982 (Revised)

2. Reporting Per. d:

o

3. Licensed Thermal Power (MWt):

ll27

4. Nameplate Rating (Gross MWe):

106/

5. Design Electrical Rating (Net MWe):

1127

6. Maximum Dependable Capacity (Gross MWe):

1087

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Give Reasons:

NA

9. Power Level To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to-Date Cumulative 251.5 251.5 251.5 i1. Hours In Reporting Peu 42*O

12. Number Of Hours Reactor Was Critical O.0 0.0 0.0
13. Reactor Reserse Shutdows Hours.
14. Hours Generator On.i ine '

9 9

9 0

0 0

15. Unit Reserve Shutdown Heen 4,512 4,512 4,612
16. Gross Thermal EmerEy Generseed (MWH) 1,500 I,b00 I,buu-
17. Gross Electrical Energy Generseed (MWHI O

O O

18. Net Electrical Energy Generated (MWHI NA NA NA
19. Unit Service Factor NA NA NA
20. Unit Availability Facto, 0

0 0

21. Unit Capacity Factor (Udng MDC Net) 0 0

0

22. Unit Capacity Factor (Usag DER Net) 0 0

0

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oves Nent 4, Months (Type. Date.and Durir.an of Each t:

None NA

25. If Shut Down At End Of Report Period.Estirmated Date of Startup:
26. Unitm in Test Status (Prior o Commerefal Operation):

Forecast Achiewd INITI4L CRITICALITY 9/82 9/ Zu/ U2 INITIAL ELECTRICITY Under review couuraCIAL OPERATION 8303150592 830215 PDR ADOCK 05000361 R

PDR p rssots; s,s ses, one

UNIT SHUTDOWNS AND POWER RI' DUCTIONS DOCKET NO.

50-361 UNIT NAME SONGS - 2 Revision DATE Feb. 15/1983 September,1982 COMPLETED BY I

Mauwonthar REPORT MONTH TELEPHONE 71a/io? 7700 Ext /56223 REVISED "L

c f, Ei L.icenwe

[g h'E

]g 3

Cauw A Corrective W.

Date h

3y 4

2sE I: vent 3,7 o-Attiem to f-jgg Report a mO

]U Prevent Recurrente H

d i

820922 S

242.E B

1 NA CA VALVEX Shutdown to repair packing leak in Pressurizer Spray Valves.

I 2

3 4

r: Forced Resum:

Methoti:

lishibit F. Instinctions S Schedulet!

A 1:quipment Failure (Emplain)

1. Manual for Preparation ol' Data R. Maintenance or Test 2-Manual Scram.

I'ntrs Sheets ro, I.itensee C. Refueling 3 Automatic Siram.

I vent Repois II I RII ile t NitRI G D Regulators Resttictieni 4-Continuation from previous 0161 I Opceatus Training A l.liente 1.tamination month F Admmtstrative

5. Reduction of 20% or greater

' * ' ' "."" ' " " ' ' I " PI" '

I ' ' '"b " l I S "" '"" '

ll-Olbre (I splaisip in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9.0ther (Explain)

....l.)....or

.ir.

  • o.

AC40 - R A NRC MONTHLY OPERATING REPORT DOCKET NO.

50-361 Revision DATE Feb. 15/83 COMPLETED BY L Mayweather TELEPHOSE 71ala47 7700 Ext. 56223 OPERATING STATUS San Gnofre Nuclear Generating Station, Unit 2

1. Unit Name:

1 October,1982 through 31 October,1982 (Revised)

2. Reporting Period:
3. Licensed Thermal Power (MWt) 1127
4. Nameplate Rating (Gross MWe):

1087

5. Design Electrical Rating (Net MWe):

1127

6. Maximum Dependable Capacity (Gross MWe):

1087

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Throg 7)Since last Report.Give Reawns:

NA

9. Power Level To Which Restricted. lf Any (Net MWe):

NA

10. Reasons For Restrictions.lf Any:

This Month Yr.-to-Date Cumulative 745 996.5 996.5

11. Hours In Reporting Period 234.7 277.5 277.b
12. Number Of Hours Reactor was CritierJ 0.0 0.0 U.u 13 Reactor Reserve Shu(dows Hours. ~

i l85 194' I94

14. Heurs Generator On-i.ine 0

V u

15. Unit Reserve Shutdown Hours 139,128 143,640 144,b40
16. Grom Therinal Energy Generased (MWH) 18,162 19,662 I9,004 17 Coss Electncal Energy Genereced (MWHI IIL Net Electrical Energy Generated (MWH) 0 0

0

19. Unit Service Factor NA NA NA NA NA NA
20. Unit Availability Factor 0

0 0

21. Unit Capacity Factor (Using MDC Net) 0 U

u

22. Unit Capacity Factor (Usag DER Net) 0 0

0

23. Unit Forced Outage Rate
24. Shetdowns Sciuduled Over Nekt 4 Month 4 Type. Oate. sad D=== of Each t:

None NA

25. If Shut Dov.m At End Of Report Period. Estimated Date of Startup:
26. Uniss In Test Status (Prior o Commercial Operation):

Forecast Achiesed 7/17/82 7/26/82 INITIAL CRITICALITY 9/82 9/ du/ d INITIAL ELECTRICITY Under review COMMERCIAL OPERATION p m (iln ns..n.

l

s52-361 UNIT SHUTDOWNS AND POWER REDt!CTIONS DOCKETNO.

DUdbD ~ 4 UNIT NAME Revisioeu n-teD. I n/ ua OCTOBER 1982 (Revised)

COMPT ETED e L. Mayweather REPORT MONTH TELFFHONE 714/492-7700 Ext. 56223 "i

.$ g "h

E ~h Licensce

,E*

Cause A Corre;tive W.

Date h

~j 4

jjg Event 3,7

?

Action to y:

E j ;7; g Repori e in U

]'

Pievent Recurrente 6

2 821001 S

560 B

1 NA CA VALVEX Shutdown to repair packing leak in pressurizer spray valve.

I 2

1 4

i: Forced Resum-Met hoil.

Exhibit F. instructions S. Scheduled A l'.quipment Failure (Explain) 1 Manual for Preparation of Data R Maintenance or Test 2 Manual Scram.

Entrs Sheets lin 1.icensee C. Refueling 4 Automatic Siram.

1:ven't Rep.no fI l RII ile (N!!RI G D-Regul.itor, Restriction 4-Continuation from previous 0161)

I -Opci.eios Training & Litense I.xamination

~

month F Administrative

" # " ' ' " "" ' " "' ' I ' l " '

5. Reduction of 20% or greater P

d Il Othes (1 splaint in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ITl"h" I I S "" S'"""

l 9.0ther (Explain) ocoole} en new etre

'a.

AC40 - RA s'

NRC MONTHLY OPERATING REPORT DOCKET NO.

Revision DATE Feb.15/83 COMPLETED BY L. Mavweather TELEPHOSE 71a/447 7700 Ext.

56223 OPERATING STATUS San Onofre Nuclear Generating Station, Unit 2

1. Unit Name:

i novemuer, is82 Unrougn 3u November,1982 (Revised)

2. Reporting Period.

3390 m

3. Licensed Thermal Power (MWt):

1127

4. Nameplate Rating (Gross MWe):

1087

5. Design Electrical Rating (Net MWe):

1177

6. Maximum Dependable Capacity (Gross MWe):

10R7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA NA

9. Power Level To Which Restricted. If Any (Net MWe):

pg

10. Reasons For Restrictiom.lf Any:

This Month Yr.-to Date Cumulative 720 1,71 6.5 1,716.5 II. Hours in Reporting Period 459 736.5 736.5

12. Number Of Hoers Reactor was Critical 0.0 0.0 0.0
13. Resctor Reserve Shuidows Hours.
14. Hours Generator On.i.ine '

i~

361 555 555 0

0 0

15. Unit Reserve Shutdown Hours 310,000-453,640 453,640
16. Gross Thermal Energy Gew Med (MWH) 4D'/bU bb,412 bb,412 17 Gross Electrical Emergy CW (MWH)
18. Net Electrical Energy Generated (MWHI 17.400 17.400

'17.400 NA NA NA

19. Unit Service Factae NA NA RA
20. Unit Availability Factor 0

0 0

2I. Unit Capecity Factor (Using MDC Net) 0 0

0

22. Unit Capacity Factor IUsing DER Net)

U U

u

23. Unit Forced Outage Rate
24. Shesdowns Scheduled Over Next 4 Months 4 Type.Date. mad Dg of Each t:

Ha

25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
26. Unit,in Test Staras IPrior o Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 7/17/82 7/26/82 9/82 9/20/62 INITIAL ELECTRICITY Under review COMMERCIAL OPERATION p r...til ne = s.. r,.

Page 1 of 2 UNIT EMUTDOWNS AND POWER RFDUCTIONS DOCKET NO.

50-361 UNIT NAME SONGS - 2 Revision DATE Feh. 15/R3 November 1982 (Revised)

COMPLETED 9Y l Ma wa2 + ha v*

REPORT MON TH TELEPHONE 71 A,/ADA 77nn Ext. 56223 "s

=e c

i e. cg Licensee f.,

Cauw A Correceive 2E E

U"

h 32 4

2 ; oc Event 37

n. ?

Acii,m to 3 '$

cl!

j di g Repois tr triU j'

Prevent Recurrente 6

3 821109 F

69 H

2 82-138 CH xxxxxx Loss of power supply to Feedwater Cont rol System.

Supply connections secured in place to permit inadvertent dislodging 4

821111 F

14 H

3 82-144 IA CRDRVF.

Overheating of Control Element Drive Mechanism cabinet.

Added controls on work performed in cabine vicinity.

5 821112 S

10 B

3 N0 IA zzzzzz Manual trip for testing.

6 821113 F

9 A

3 NO HH VALVEX High steam generator level caused by failed open feedwater regulating valve Corrective action under study.

7 821113 F

6 H

3 82-139 IA CRDRVE Slipped Control Element Assemblies.

Gripper voltage increased on all regulating rods.

Voltage duration increased by 100msc. for CEA 23.

'l i

2 1

4 l~ : F.irced Resum Methoil:

Ensubii F. Instinctions S. Scheduled A l:quipment Failure (Emplain) 1 Manual lor Prepar.iti.m of' Data R Maintenance of Test 2-Manual Scram.

Entry Sheets l'or I iten<ce l'-Refueling 4 Automatic St ram.

I:vens Repost al I R1I ile INI'R1 G p-Regul.itors Restriction 4 Continuation from previous oinii I Opce.elos Training & Litense I.tamination month F Atiministrative G-Opce.stional I f or iliplain t

5. Reduction of 20% or greater ll Othes el splain t h W p m 24 W s ITI"b" I I S ""' S"" #

9.0ther (Explain) i l

neal,l en new etre

{

Page 2 of 2 em 50-361 UNIT SHUTDOWNS AND POWER RFI)UCTIONS DOCKET NO.

UNIT NAME DUNUh 2 Revision DATE February 16/83 November,1982(Revised) cOurs.ETED BY L Mavweather REPOR T MON TH TELEPHONE 714/492-7700 Ex. 56223

.{ g i

h{h Licensee jg h

Cauw A Corrective liste h

32 4

2ga Event u7

}'?

o-Action to W

y$

jgg Repint er ifi0 Prevent Recurrente 6

8 821117 F

148 A

3 NA HC HTEXCH Sea water leak into the condenser.

Repaired condenser tubes.

9 821123 F

5 A

3 NA HH VALVEX High steam generator level caused by faulty feedwater regulating valve.

Corrective action under study.

10 821126 F

98 A

3 NA HH VALVEX High steam generator level caused by faulty feedwater regulating valve.

Corrective action under study, I

2 1

4 I: Forced neamn:

~4ethod:

lishihii F. Instructions S. Schedisled A l:quipment Failure (Explain) 1 -Manual for Preparation or liara R.Maintensuce of Test 2-Manual Scram.

. Entr> Sheets sin lxensee C Refueling 4 Automatic Sir.im.

I vent Rep nr til Rilite tnt'R1 G I)-Meritaion Restriction 4-Continuation from previous otr,si 1 Orre.sen Training & Lic ense I.mamination month F-Adonnistrative G-Orci.iiional I e ror i1 splain t

5. Reduction of 20% or greater Il Othee tI splain in the Past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I ' 'I"h" l I S "" * ""' "

9.0ther (Explain)

... o l ).......n.

~o AC40 - R A P

e' NRC MONTHLY OPER ATING REPORT 50-361 RevlYo*n$TE Feo. i5/83 E

COMPLETED BY L. Mayweather TELEPHONE 714/492-7700 Ext. 56223 OPERATING STATUS San Onoke Mear Gener@g Madon, UnM 2,

1. Unit Name.

i vecemoer i n tnrougn ai vecember 1982 (Revised)

2. Reporting Period:

3390

3. Licensed Thermal Power (MWt):

IIu

4. Nameplate Rating (Gross MWe):

1087

5. Design Electrical Rating (Net MWe):

lI27

6. Maximum Dependable Capacity (Gross MWe):

~

1087

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gi+e Reawns:

un

9. Power Level To Which Restricted,If Any (Net MWe):

Ma

10. Reasons For Restrictions.If Any:

NA This Month Yr..to Date Cumulative 744 2,'460.5 2,460.5 I1. Hours in Reporting Period 297 1,033.5 1,033.5

12. Number Of Hours Resetor Was Critical 0

0 0

13. Reactor Reserve Shu(dows Hours.
14. Hours Generator On.i.ine ~

i~

269 824-824 0

0 0

15. Unit Reserve Shutdown Hours 474,700 928,340 928,340
16. Grom Thermal Energy Generseed (MWH) 128,600 195,OI2 IUb,Uiz 17 Grom Electrical Energy Generseed (MWHI 108,620 126,020 126,020 IK. Net Electrical Energy Generated (MWH)
19. Unit Service Factor NA NA NA NA NA NA
20. Unit Availability Factar 0

0 0

' 21. Unit Capacity Factor (Using MDC Net) 0 0

0

22. Unit Capacity Factor IUng DER Net) 0 0

0

23. Unit Forced Outage Rate

. 24. Shetdowns Scheduled Owr Nent 6 Months (Type.Date.and Di==t an ofEach::

4 None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior o Comuneresol Operationi:

Forecast Achined 7/17/82 7/26/82

,g,y g,,

9/82 U/ZU/d2 INITIA L ELECTRICITY COMWERCIAL OPERADON Under review p emoot,\\ us

a. eno

~h' 0-361 UNIT SHUTDOWNS AND POWER RFDUCTIONS DOCKET NO.

UNIT NAME D U *'d RevisionDATE Feb. 15/83 December 1982 (Revised)

COMPLETED BY I. Mavweather REPORT MON TH TELEPHONE

/14/4 W-//Uu ext.56223 "y

Ek Licensee

$3, Cause & Corrective

.$ E g

Date

(

3g j

j ~y Event 37 9.?

Action to

$5 c2 j di g Repoet tr td O

}'

Prevent Returrente 6

10 821126 A

3 A

4 NA HA VALVEX High steam generator level caused by faulty feedwater regulating valve.

Corrective action under study.

11 821212 F

472 A

3 82-168 IA INSTRll Trip on high LPD/ low DNBR signal caused by faulty reed switch.

Faulty reed switch replaced. Unit remained down for repair of RCP seals and turbine valves.

I 2

1 4

I: Forced Resum:

Method.

I!=Inhit F. Instructions S Scheduled A l:quipment Failure (Explain)

1. Manual hn Prepar.itn n of Day B. Maintenance or Test 2 Manual Scram.

I'nin Shriis l'or I.isensce C. Refueling 4 Automatic Ss ram.

I went Repore il I RII ile (NURI G D.Regni.itors Restrieflon 4-Continuation from previous on.Il I.Opce.alos 1 raining & 1it ense I.xamite.:Iion month F. Adnunistrative 0-Opci iion.it I iror fl%plaini

5. Reduction of 20% or greater ll-Othe il spl. sin) in the East 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

' ' ' '"'" ' I I S """ S""'"

9.0ther (Explain) n.el.I.......n.

,