d AC40 - R A NRC MONTHLY OPERATING REPORT J2.
RE b k ATE t o/63 COMPLETED BY L. Mayweather TELEPHOSE 714/492-/700 Ext. 56223 OPERATING STATUS San Onofre Nuclear Generating Station, Unit 2 I
- U"I' h.***
i 5eptember inrough 30 5 epi. ember,1982 (Revised)
- 2. Reporting Per. d:
o
- 3. Licensed Thermal Power (MWt):
ll27
- 4. Nameplate Rating (Gross MWe):
106/
- 5. Design Electrical Rating (Net MWe):
1127
- 6. Maximum Dependable Capacity (Gross MWe):
1087
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Give Reasons:
NA
- 9. Power Level To Which Restricted.If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr..to-Date Cumulative 251.5 251.5 251.5 i1. Hours In Reporting Peu 42*O
- 12. Number Of Hours Reactor Was Critical O.0 0.0 0.0
- 13. Reactor Reserse Shutdows Hours.
- 14. Hours Generator On.i ine '
9 9
9 0
0 0
- 15. Unit Reserve Shutdown Heen 4,512 4,512 4,612
- 16. Gross Thermal EmerEy Generseed (MWH) 1,500 I,b00 I,buu-
- 17. Gross Electrical Energy Generseed (MWHI O
O O
- 18. Net Electrical Energy Generated (MWHI NA NA NA
- 19. Unit Service Factor NA NA NA
- 20. Unit Availability Facto, 0
0 0
- 21. Unit Capacity Factor (Udng MDC Net) 0 0
0
- 22. Unit Capacity Factor (Usag DER Net) 0 0
0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oves Nent 4, Months (Type. Date.and Durir.an of Each t:
None NA
- 25. If Shut Down At End Of Report Period.Estirmated Date of Startup:
- 26. Unitm in Test Status (Prior o Commerefal Operation):
Forecast Achiewd INITI4L CRITICALITY 9/82 9/ Zu/ U2 INITIAL ELECTRICITY Under review couuraCIAL OPERATION 8303150592 830215 PDR ADOCK 05000361 R
PDR p rssots; s,s ses, one
UNIT SHUTDOWNS AND POWER RI' DUCTIONS DOCKET NO.
50-361 UNIT NAME SONGS - 2 Revision DATE Feb. 15/1983 September,1982 COMPLETED BY I
Mauwonthar REPORT MONTH TELEPHONE 71a/io? 7700 Ext /56223 REVISED "L
c f, Ei L.icenwe
[g h'E
]g 3
Cauw A Corrective W.
Date h
3y 4
2sE I: vent 3,7 o-Attiem to f-jgg Report a mO
]U Prevent Recurrente H
d i
820922 S
242.E B
1 NA CA VALVEX Shutdown to repair packing leak in Pressurizer Spray Valves.
I 2
3 4
r: Forced Resum:
Methoti:
lishibit F. Instinctions S Schedulet!
A 1:quipment Failure (Emplain)
- 1. Manual for Preparation ol' Data R. Maintenance or Test 2-Manual Scram.
I'ntrs Sheets ro, I.itensee C. Refueling 3 Automatic Siram.
I vent Repois II I RII ile t NitRI G D Regulators Resttictieni 4-Continuation from previous 0161 I Opceatus Training A l.liente 1.tamination month F Admmtstrative
- 5. Reduction of 20% or greater
' * ' ' "."" ' " " ' ' I " PI" '
I ' ' '"b " l I S "" '"" '
ll-Olbre (I splaisip in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9.0ther (Explain)
....l.)....or
.ir.
- o.
AC40 - R A NRC MONTHLY OPERATING REPORT DOCKET NO.
50-361 Revision DATE Feb. 15/83 COMPLETED BY L Mayweather TELEPHOSE 71ala47 7700 Ext. 56223 OPERATING STATUS San Gnofre Nuclear Generating Station, Unit 2
- 1. Unit Name:
1 October,1982 through 31 October,1982 (Revised)
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt) 1127
- 4. Nameplate Rating (Gross MWe):
1087
- 5. Design Electrical Rating (Net MWe):
1127
- 6. Maximum Dependable Capacity (Gross MWe):
1087
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Throg 7)Since last Report.Give Reawns:
NA
- 9. Power Level To Which Restricted. lf Any (Net MWe):
NA
- 10. Reasons For Restrictions.lf Any:
This Month Yr.-to-Date Cumulative 745 996.5 996.5
- 11. Hours In Reporting Period 234.7 277.5 277.b
- 12. Number Of Hours Reactor was CritierJ 0.0 0.0 U.u 13 Reactor Reserve Shu(dows Hours. ~
i l85 194' I94
- 14. Heurs Generator On-i.ine 0
V u
- 15. Unit Reserve Shutdown Hours 139,128 143,640 144,b40
- 16. Grom Therinal Energy Generased (MWH) 18,162 19,662 I9,004 17 Coss Electncal Energy Genereced (MWHI IIL Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor NA NA NA NA NA NA
- 20. Unit Availability Factor 0
0 0
- 21. Unit Capacity Factor (Using MDC Net) 0 U
u
- 22. Unit Capacity Factor (Usag DER Net) 0 0
0
- 23. Unit Forced Outage Rate
- 24. Shetdowns Sciuduled Over Nekt 4 Month 4 Type. Oate. sad D=== of Each t:
None NA
- 25. If Shut Dov.m At End Of Report Period. Estimated Date of Startup:
- 26. Uniss In Test Status (Prior o Commercial Operation):
Forecast Achiesed 7/17/82 7/26/82 INITIAL CRITICALITY 9/82 9/ du/ d INITIAL ELECTRICITY Under review COMMERCIAL OPERATION p m (iln ns..n.
l
s52-361 UNIT SHUTDOWNS AND POWER REDt!CTIONS DOCKETNO.
DUdbD ~ 4 UNIT NAME Revisioeu n-teD. I n/ ua OCTOBER 1982 (Revised)
COMPT ETED e L. Mayweather REPORT MONTH TELFFHONE 714/492-7700 Ext. 56223 "i
.$ g "h
E ~h Licensce
,E*
Cause A Corre;tive W.
Date h
~j 4
jjg Event 3,7
?
Action to y:
E j ;7; g Repori e in U
]'
Pievent Recurrente 6
2 821001 S
560 B
1 NA CA VALVEX Shutdown to repair packing leak in pressurizer spray valve.
I 2
1 4
i: Forced Resum-Met hoil.
Exhibit F. instructions S. Scheduled A l'.quipment Failure (Explain) 1 Manual for Preparation of Data R Maintenance or Test 2 Manual Scram.
Entrs Sheets lin 1.icensee C. Refueling 4 Automatic Siram.
1:ven't Rep.no fI l RII ile (N!!RI G D-Regul.itor, Restriction 4-Continuation from previous 0161)
I -Opci.eios Training & Litense I.xamination
~
month F Administrative
" # " ' ' " "" ' " "' ' I ' l " '
- 5. Reduction of 20% or greater P
d Il Othes (1 splaint in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ITl"h" I I S "" S'"""
l 9.0ther (Explain) ocoole} en new etre
'a.
AC40 - RA s'
NRC MONTHLY OPERATING REPORT DOCKET NO.
Revision DATE Feb.15/83 COMPLETED BY L. Mavweather TELEPHOSE 71a/447 7700 Ext.
56223 OPERATING STATUS San Onofre Nuclear Generating Station, Unit 2
- 1. Unit Name:
i novemuer, is82 Unrougn 3u November,1982 (Revised)
- 2. Reporting Period.
3390 m
- 3. Licensed Thermal Power (MWt):
1127
- 4. Nameplate Rating (Gross MWe):
1087
- 5. Design Electrical Rating (Net MWe):
1177
- 6. Maximum Dependable Capacity (Gross MWe):
10R7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA NA
- 9. Power Level To Which Restricted. If Any (Net MWe):
pg
- 10. Reasons For Restrictiom.lf Any:
This Month Yr.-to Date Cumulative 720 1,71 6.5 1,716.5 II. Hours in Reporting Period 459 736.5 736.5
- 12. Number Of Hoers Reactor was Critical 0.0 0.0 0.0
- 13. Resctor Reserve Shuidows Hours.
- 14. Hours Generator On.i.ine '
i~
361 555 555 0
0 0
- 15. Unit Reserve Shutdown Hours 310,000-453,640 453,640
- 16. Gross Thermal Energy Gew Med (MWH) 4D'/bU bb,412 bb,412 17 Gross Electrical Emergy CW (MWH)
- 18. Net Electrical Energy Generated (MWHI 17.400 17.400
'17.400 NA NA NA
- 19. Unit Service Factae NA NA RA
- 20. Unit Availability Factor 0
0 0
2I. Unit Capecity Factor (Using MDC Net) 0 0
0
- 22. Unit Capacity Factor IUsing DER Net)
U U
u
- 23. Unit Forced Outage Rate
- 24. Shesdowns Scheduled Over Next 4 Months 4 Type.Date. mad Dg of Each t:
Ha
- 25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
- 26. Unit,in Test Staras IPrior o Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 7/17/82 7/26/82 9/82 9/20/62 INITIAL ELECTRICITY Under review COMMERCIAL OPERATION p r...til ne = s.. r,.
Page 1 of 2 UNIT EMUTDOWNS AND POWER RFDUCTIONS DOCKET NO.
50-361 UNIT NAME SONGS - 2 Revision DATE Feh. 15/R3 November 1982 (Revised)
COMPLETED 9Y l Ma wa2 + ha v*
REPORT MON TH TELEPHONE 71 A,/ADA 77nn Ext. 56223 "s
=e c
i e. cg Licensee f.,
Cauw A Correceive 2E E
U"
h 32 4
2 ; oc Event 37
- n. ?
Acii,m to 3 '$
cl!
j di g Repois tr triU j'
Prevent Recurrente 6
3 821109 F
69 H
2 82-138 CH xxxxxx Loss of power supply to Feedwater Cont rol System.
Supply connections secured in place to permit inadvertent dislodging 4
821111 F
14 H
3 82-144 IA CRDRVF.
Overheating of Control Element Drive Mechanism cabinet.
Added controls on work performed in cabine vicinity.
5 821112 S
10 B
3 N0 IA zzzzzz Manual trip for testing.
6 821113 F
9 A
3 NO HH VALVEX High steam generator level caused by failed open feedwater regulating valve Corrective action under study.
7 821113 F
6 H
3 82-139 IA CRDRVE Slipped Control Element Assemblies.
Gripper voltage increased on all regulating rods.
Voltage duration increased by 100msc. for CEA 23.
'l i
2 1
4 l~ : F.irced Resum Methoil:
Ensubii F. Instinctions S. Scheduled A l:quipment Failure (Emplain) 1 Manual lor Prepar.iti.m of' Data R Maintenance of Test 2-Manual Scram.
Entry Sheets l'or I iten<ce l'-Refueling 4 Automatic St ram.
I:vens Repost al I R1I ile INI'R1 G p-Regul.itors Restriction 4 Continuation from previous oinii I Opce.elos Training & Litense I.tamination month F Atiministrative G-Opce.stional I f or iliplain t
- 5. Reduction of 20% or greater ll Othes el splain t h W p m 24 W s ITI"b" I I S ""' S"" #
9.0ther (Explain) i l
neal,l en new etre
{
Page 2 of 2 em 50-361 UNIT SHUTDOWNS AND POWER RFI)UCTIONS DOCKET NO.
UNIT NAME DUNUh 2 Revision DATE February 16/83 November,1982(Revised) cOurs.ETED BY L Mavweather REPOR T MON TH TELEPHONE 714/492-7700 Ex. 56223
.{ g i
h{h Licensee jg h
Cauw A Corrective liste h
32 4
2ga Event u7
}'?
o-Action to W
y$
jgg Repint er ifi0 Prevent Recurrente 6
8 821117 F
148 A
3 NA HC HTEXCH Sea water leak into the condenser.
Repaired condenser tubes.
9 821123 F
5 A
3 NA HH VALVEX High steam generator level caused by faulty feedwater regulating valve.
Corrective action under study.
10 821126 F
98 A
3 NA HH VALVEX High steam generator level caused by faulty feedwater regulating valve.
Corrective action under study, I
2 1
4 I: Forced neamn:
~4ethod:
lishihii F. Instructions S. Schedisled A l:quipment Failure (Explain) 1 -Manual for Preparation or liara R.Maintensuce of Test 2-Manual Scram.
. Entr> Sheets sin lxensee C Refueling 4 Automatic Sir.im.
I vent Rep nr til Rilite tnt'R1 G I)-Meritaion Restriction 4-Continuation from previous otr,si 1 Orre.sen Training & Lic ense I.mamination month F-Adonnistrative G-Orci.iiional I e ror i1 splain t
- 5. Reduction of 20% or greater Il Othee tI splain in the Past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I ' 'I"h" l I S "" * ""' "
9.0ther (Explain)
... o l ).......n.
~o AC40 - R A P
e' NRC MONTHLY OPER ATING REPORT 50-361 RevlYo*n$TE Feo. i5/83 E
COMPLETED BY L. Mayweather TELEPHONE 714/492-7700 Ext. 56223 OPERATING STATUS San Onoke Mear Gener@g Madon, UnM 2,
- 1. Unit Name.
i vecemoer i n tnrougn ai vecember 1982 (Revised)
- 2. Reporting Period:
3390
- 3. Licensed Thermal Power (MWt):
IIu
- 4. Nameplate Rating (Gross MWe):
1087
- 5. Design Electrical Rating (Net MWe):
lI27
- 6. Maximum Dependable Capacity (Gross MWe):
~
1087
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gi+e Reawns:
un
- 9. Power Level To Which Restricted,If Any (Net MWe):
Ma
- 10. Reasons For Restrictions.If Any:
NA This Month Yr..to Date Cumulative 744 2,'460.5 2,460.5 I1. Hours in Reporting Period 297 1,033.5 1,033.5
- 12. Number Of Hours Resetor Was Critical 0
0 0
- 13. Reactor Reserve Shu(dows Hours.
- 14. Hours Generator On.i.ine ~
i~
269 824-824 0
0 0
- 15. Unit Reserve Shutdown Hours 474,700 928,340 928,340
- 16. Grom Thermal Energy Generseed (MWH) 128,600 195,OI2 IUb,Uiz 17 Grom Electrical Energy Generseed (MWHI 108,620 126,020 126,020 IK. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor NA NA NA NA NA NA
- 20. Unit Availability Factar 0
0 0
' 21. Unit Capacity Factor (Using MDC Net) 0 0
0
- 22. Unit Capacity Factor IUng DER Net) 0 0
0
- 23. Unit Forced Outage Rate
. 24. Shetdowns Scheduled Owr Nent 6 Months (Type.Date.and Di==t an ofEach::
4 None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o Comuneresol Operationi:
Forecast Achined 7/17/82 7/26/82
,g,y g,,
9/82 U/ZU/d2 INITIA L ELECTRICITY COMWERCIAL OPERADON Under review p emoot,\\ us
- a. eno
~h' 0-361 UNIT SHUTDOWNS AND POWER RFDUCTIONS DOCKET NO.
UNIT NAME D U *'d RevisionDATE Feb. 15/83 December 1982 (Revised)
COMPLETED BY I. Mavweather REPORT MON TH TELEPHONE
/14/4 W-//Uu ext.56223 "y
Ek Licensee
$3, Cause & Corrective
.$ E g
Date
(
3g j
j ~y Event 37 9.?
Action to
$5 c2 j di g Repoet tr td O
}'
Prevent Returrente 6
10 821126 A
3 A
4 NA HA VALVEX High steam generator level caused by faulty feedwater regulating valve.
Corrective action under study.
11 821212 F
472 A
3 82-168 IA INSTRll Trip on high LPD/ low DNBR signal caused by faulty reed switch.
Faulty reed switch replaced. Unit remained down for repair of RCP seals and turbine valves.
I 2
1 4
I: Forced Resum:
Method.
I!=Inhit F. Instructions S Scheduled A l:quipment Failure (Explain)
- 1. Manual hn Prepar.itn n of Day B. Maintenance or Test 2 Manual Scram.
I'nin Shriis l'or I.isensce C. Refueling 4 Automatic Ss ram.
I went Repore il I RII ile (NURI G D.Regni.itors Restrieflon 4-Continuation from previous on.Il I.Opce.alos 1 raining & 1it ense I.xamite.:Iion month F. Adnunistrative 0-Opci iion.it I iror fl%plaini
- 5. Reduction of 20% or greater ll-Othe il spl. sin) in the East 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
' ' ' '"'" ' I I S """ S""'"
9.0ther (Explain) n.el.I.......n.
,