GENER AL $ ELECTRIC MEDIUM VOLTAGE SWITCHGEAR BUSINESS SECTION GENERAL ELECTRIC COMPANY e P.O. BOX 488
- BURLINGTON, IOWA 52601 * (319) 753-8400 March 9, 1983 Mr. Richard DeYoung, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. DeYoung:
In compliance with the requirements of Part 21 of the NRC's Rules and Regulations, Reporting of Defects and Noncompliances, we are submitting the attached copy of the results of our investigation of a report of defects made under the requirements of NRC Rules and Regulations 10CFR50.55(e) on or about August 2, 1982.
10CFR50.55(e) Report Issued by Bechtel Power Corp.
Bechtel Report No. DER 82-41 Site:
Arizona Public Service Co.
Palo Verde Nuclear Generating Site Units 1, 2 and 3 Construction Consultants:
Bechtel Power Corporation Norwalk, California 90650 Equipment Supplied:
4.16kV Switchgear Equipment, manufactured by:
General Electric Company Switchgear Business Department Burlington, Iowa 52601 If you have questions or desire additional information, please contact me.
}L w.
p votevd'J PWD/md P. W. Dwyer, Manager Attachment Development & Design Engineering 8303150585 830309 PDR ADOCK 05000520 l
S PDR 1
e GENER AL $ ELECTRIC MEDIUM VOL TAGE SWITCHGEAR BUSINESS SECTION GENERAL ELECTRIC COMPANY
- P.O. BOX 488
- BURLINGTON, IOWA 52601 * (319) 753-8400 March 9, 1983 Mr. L. R. Fickel GENERAL ELECTRIC COMPANY EUSD 9350 E. Flair Drive El Monte, CA 91734
Dear Sir:
On or about October 26, 1982, you received a Deficiency Evaluation Report, DER 82-41, from the Bechtel Power Corporation alerting you to two conditions concerning control wire terminations within the 4.16kV switchgear equipment supplied by the General Electric Company, G.E. Req'n. 480-54640, Bechtel Spec. 13-EM-009.
l The purpose of this letter is to document the results of our investigation into the situation reported by Bechtel/ Arizona Public Service DER 82-41.
For clarification, we will separately address the two conditions l
stated in the report.
CONDITION IDENTIFICATION Item 1 "Two conductors were found pulled from the crimped area of the lug barrel.
It was l
detennined at that time that some of the lugs within the equipment area did not exhibit identifying marks which identify correct use of crimping tools and dies."
INVESTIGATION An investigation by General Electric's I&SE Department determined that there had been two terminals pulled away from the wire. The exact cause of this could not l
be determined as the terminals had already been repaired.
In addition, it was determined that the identifying marks were present although difficult to see.
l
GENERAL $ ELECTRIC Mr. L. R. Fickel Page Two March 9, 1983 However, we intnediately performed a 100% inspection of all crimped connections at our Burlington Manufacturing location to find out if there were any loose connections or evidence of the use of improper crimping tools.
This inspection, plus subsequent inspections at the Palo Verde site performed by Bechtel, Arizona Public Service, and GE Installation and Service Engineering personnel, recorded no further examples of these reported conditions.
CONCLUSION We believe the two loose terminals were an isolated incident which would normally be discovered during facility installation and check-out.
We believe a general safety hazard does not exist based on our thorough inspections of factory and field previously reported.
Further corrective action is not required.
CONDITION IDENTIFICATION Item 2 "The attached General Electric (GE) letter provides the criteria and corrective action for providing acceptable termination crimps in the switchgear furnished by GE under Bechtel specification 13-EM-009. A followup random inspection performed by Bechtel Construction using GE criteria in Unit 3 switch-i gear (7 cubicles noted below) revealed that not all lug terminations were in compliance; however, no open circuits were apparent."
INVESTIGATION The internal requirement that the wire be " flush to 1/16 protruding" from the barrel was engineered to provide easy inspection.
It is not a field requirement for a satis-factory joint.
l We sent our I&SE engineer to inspect the reported terminals in Unit #3.
Under close inspection all wires were secure although a few were back in the barrel as much as.070 to.090.
None were back.125".
1 I
i
~
GENER AL $ ELECTRIC Mr. L. R. Fickel Page Three March 9, 1983 Further, a number of questionable terminals were returned to Burlington from Units #1 and #3.
These were similar to the findings from Unit #2. All in all, more than 10,000 terminals were checked with none being found outside the limits previously dis-cussed.
Although we believed these joints to be fully satis-factory, an additional test was run to verify that they were satisfactory to carry current. Temperature rises of the terminals for 10 and 20 amps were measured at various dimensions of the barrel to wire end up to
.125" - no significant difference in heating was found.
Therefore, we believe all of these joints were satisfactory for their intended purpose.
CONCLUSION We believe that the factory internal inspection standards are too conservative to be used as a general field inspection criterion.
As long as the wire is securely crimped, and not recessed more than 1/8", it is satisfactory. The evidence from extensive field inspections indicates that field terminals meet these requirements and further field inspections are not needed.
We therefore believe that a safety hazard does not exist, as even the inspection of thousands of terminals did not identify terminals beyond the 1/8" or loose.
p c. P 4. p P. W. Dwyer, Manager Development & Design Engineering PWD/md cc:
W.G. Bingham Bechtel Power Corp.
P. O. Box 60860 Terminal Annex Los Angeles, CA 90060 R.F. Greene Plant Manager General Electric Company Burlington, IA 52601
O GENERAL $ ELECTRIC Mr. L. R. Fickel Page Four March 9, 1983 R.A. Kantmann General Electric Company Burlington, IA 52601 E. Phillipe General Electric Company EUSD 9350 E. Flair Drive El Monte, CA 91734 P.S. Rinne General Electric Company A&ES P. O. Box 10419 Phoenix, AZ 85064 R.L. Shaw General Electric Company EUSD P. O. Box 10419 Phoenix, AZ 85064 C.G. Weymouth General Electric Company P. O. Box 10419 Phoenix, AZ 85064 l
l l
l l
l
.