Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1982-068, Forwards LER 82-068/03L-0.Detailed Event Analysis Encl + (ML20065F574)
- ML20065F584 + (ML20065F584)
- ML20065F614 + (ML20065F614)
- ML20065F617 + (ML20065F617)
- 05000272/LER-1982-068-03, /03L-0:on 820827,100-ft Elevation Containment Air Lock Declared Inoperable After Excessive Leakage Discovered Past Inner Door Seals.Caused by Closing Door W/Excessive Force.Seal Replaced.Installation of Snubbers Proposed + (ML20065F651)
- 05000387/LER-1982-015, Forwards LER 82-015/03L-0 + (ML20065F683)
- ML20065F708 + (ML20065F708)
- ML20065F710 + (ML20065F710)
- BSEP-82-1948, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-25 & 50-325/82-25.Corrective Actions:Plant Operating Procedures Rewritten & Signoffs Added.Operations Engineer Responsible for Procedure Changes + (ML20065F722)
- ML20065F725 + (ML20065F725)
- 05000387/LER-1982-015-03, /03L-0:on 820824,from Start of Initial Fuel Load Until 820825,spray Pond Level & Temp Not Monitored.Caused by Omission of Tech Spec 4.7.1.3 Requirements from Procedures. Procedure Rewritten + (ML20065F732)
- ML20065F739 + (ML20065F739)
- 05000311/LER-1982-088, Forwards LER 82-088/03L-0.Detailed Event Analysis Encl + (ML20065F744)
- 05000311/LER-1982-088-03, /03L-0:on 820824,containment Fan Coil Unit 25 Declared Inoperable After Low Svc Water Flow Observed.Caused by Air Regulator Being Out of Adjustment.Air Regulator Adjusted & Fan Coil Unit Satisfactorily Tested + (ML20065F766)
- ML20065F779 + (ML20065F779)
- ML20065F811 + (ML20065F811)
- PLA-1296, Forwards Description of Actions to Be Taken to Correct Deficiencies in Physical Security Plan,Per 820901-02 Discussions.Revised Plan Forthcoming.Encl Withheld (Ref 10CFR73.21) + (ML20065F814)
- WBL-20-007, 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 2 + (ML20065F821)
- 05000311/LER-1982-093, Forwards LER 82-093/01T-0.Detailed Event Analysis Encl + (ML20065F827)
- ML20065F837 + (ML20065F837)
- ML20065F842 + (ML20065F842)
- ML20065F856 + (ML20065F856)
- ML20065F863 + (ML20065F863)
- 05000311/LER-1982-093-01, /01T-0:on 820910,containment Fan Coil Unit 21 Declared Inoperable When Svc Water Leak Discovered.Caused by Erosion of Cooling Coil.Leaking Coil Blanked Off.Design Change Submitted to Replace Coils W/Erosion Resistant Matl + (ML20065F866)
- ML20065F873 + (ML20065F873)
- ML20065F877 + (ML20065F877)
- ML20065F884 + (ML20065F884)
- ML20065F887 + (ML20065F887)
- ML20065F896 + (ML20065F896)
- ST-HL-AE-4744, Responds to Violations Noted in Insp Rept 50-498/94-05 & 50-499/94-05.Corrective Actions:Procedure 0PGP03-ZR-0039 Revised to Direct Issuance of Station Problem Rept If Anomalous Measurements Obtained on Monitoring Program + (ML20065F903)
- ML20065F913 + (ML20065F913)
- ML20065F917 + (ML20065F917)
- 05000277/LER-1993-013, Forwards LER 93-013-00.LER Originally Distributed to All Individuals & Organizations Except DCD Due to Administrative Oversight + (ML20065F925)
- ST-HL-AE-3583, Revises Response to Violations Noted in Insp Repts 50-498/90-05 & 50-499/90-05,changing Completion Date for Corrective Action So That Actions May Be Completed as Part of Overall Emergency Preparedness Enhancement Program + (ML20065F926)
- ML20065F949 + (ML20065F949)
- 05000311/LER-1982-102, Forwards LER 82-102/03L-0.Detailed Event Analysis Encl + (ML20065F956)
- ML20065F960 + (ML20065F960)
- ML20065F965 + (ML20065F965)
- ML20065F975 + (ML20065F975)
- 05000311/LER-1982-102-03, /03L-0:on 820823,130-ft Elevation Containment Air Lock Declared Inoperable After Excessive Leakage Discovered Past Inner Door Seals.Caused by Closing Door W/Excessive Force.Seal Replaced.Installation of Snubbers Proposed + (ML20065F979)
- 05000282/LER-1990-013, :on 900830,inadvertent Mispositioning of Control Switch of 11 Shield Bldg Ventilation Heater Controls Identified.Caused by Workman Unknowingly Moving Switch. Protective Covers Installed Over Switches + (ML20065F980)
- ML20065F984 + (ML20065F984)
- ML20065F988 + (ML20065F988)
- ML20065F990 + (ML20065F990)
- ML20065F999 + (ML20065F999)
- ML20065G004 + (ML20065G004)
- LD-90-075, Forwards Amend H to CESSAR - Design Certification + (ML20065G011)
- ML20065G014 + (ML20065G014)
- ML20065G028 + (ML20065G028)
- ML20065G032 + (ML20065G032)
- ML20065G034 + (ML20065G034)