ML20065F960

From kanterella
Jump to navigation Jump to search
Forwards Inservice Testing Program for Pumps & Valves for 120-month Insp Period Beginning W/Fuel Load Per 10CFR50.55a.Rept Supersedes Revision 0 Submitted w/810803 Ltr
ML20065F960
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/22/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
Shared Package
ML20065F964 List:
References
EF2-59-173, NUDOCS 8210010456
Download: ML20065F960 (1)


Text

. . . _ . . _ . _ . .- ._ , - - - - .

Harry Truber ,\

_ r$ w and Constructon Deholt gy oNok'ES"E$al"le*22e

' * * #" September 22, 1982 EF2 - 59,173 Mr..L. L. Kintner

'U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 ,

Subject:

Submittal of Fermi 2 Report on Inservice Testing of Pumps and Valves L

Enclosed with this letter are forty copies of Revision 1 to Report No. DET-16-0201, " Inservice Testing Program, 1 Enrico Fermi Atomic Power Plant Unit 2". The report completely replaces and supercedes Revision 0 submitted with letter EF2-54,208 dated August 3, 1981. Appropriate.

FSAR sections will be revised to reference the new report in a forthcoming amendment.

The report submitted herein describes the Inservice Testing Program for pumps and valves important to safety for the 120-month inspection period beginning with fuel load as required by 10 CFR 50.55a (g)(4).

In addition, in accordance with 10 CFR 50 55a (g)(5),

, relief is requested in the report from certain of the -

specified code requirements.

Should you have any additional questions, please con-tact Mr. L. 2. Schuerman, (313) 649-7562.

l Sincerely, Enclosure lA^f N e .