Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065C409 + (ML20065C409)
- ML20065C420 + (ML20065C420)
- ML20065C422 + (ML20065C422)
- ML20065C433 + (ML20065C433)
- ST-HL-AE-2135, Forwards Results of Safeteam Investigation of Allegation 4-86-A.Evaluation Concludes Concerns Would Not Effect Safe Plant Operation,Health & Safety of Public & Cause Abnormal Radiation Exposure to Plant Personnel + (ML20065C438)
- ML20065C444 + (ML20065C444)
- ML20065C445 + (ML20065C445)
- ML20065C448 + (ML20065C448)
- ML20065C453 + (ML20065C453)
- ML20065C454 + (ML20065C454)
- ML20065C455 + (ML20065C455)
- ML20065C458 + (ML20065C458)
- ML20065C460 + (ML20065C460)
- ML20065C461 + (ML20065C461)
- ML20065C463 + (ML20065C463)
- NRC-94-0029, Annual Radioactive Effluent Release Rept for Period of Jan-Dec 1993 + (ML20065C466)
- ML20065C507 + (ML20065C507)
- ML20065C512 + (ML20065C512)
- RC-94-0095, Forwards Amend 33 to Physical Security Plan.Encl Withheld Per 10CFR73.21 + (ML20065C514)
- ML20065C517 + (ML20065C517)
- ML20065C526 + (ML20065C526)
- ML20065C542 + (ML20065C542)
- ML20065C547 + (ML20065C547)
- 05000499/LER-1994-001-01, :on 940301,SDG 21 Experienced Inadvertent Start.Caused by Weakened Transistor in non-1E Fiber Optic Start Circuits & Faulty Power Supply (PS-2).Fiber Optic Boards G,C & J & PS-2 Power Supply Replaced + (ML20065C548)
- ML20065C549 + (ML20065C549)
- ML20065C554 + (ML20065C554)
- 05000498/LER-1993-023, :on 931231,inadvertent ESF Actuation of Sdg 12 Occurred During Testing.Sdg Will Be Placed in Pull-to-Stop Whenever Maint Activities Performed Involving Connecting Measuring or Test Equipment to Sdg Electrical Circuits + (ML20065C561)
- PLA-1231, Forwards Monthly Operating Rept for Jul 1982 + (ML20065C562)
- ML20065C566 + (ML20065C566)
- ML20065C569 + (ML20065C569)
- ML20065C573 + (ML20065C573)
- 05000498/LER-1994-004, :on 940119,determined Surveillance Performed to Comply W/Sr 4.4.4.1.b for Rvs Needed to Be Enhanced Because PORVs Not Tested from Mcb.Procedure 1(2)PSP03-RC-0010 Replaced w/OPSP03-RC-0010 + (ML20065C578)
- ML20065C580 + (ML20065C580)
- ML20065C584 + (ML20065C584)
- ML20065C585 + (ML20065C585)
- ML20065C589 + (ML20065C589)
- ML20065C590 + (ML20065C590)
- ML20065C593 + (ML20065C593)
- ML20065C595 + (ML20065C595)
- ML20065C601 + (ML20065C601)
- 05000368/LER-1982-028, Forwards LER 82-028/03L-0 + (ML20065C608)
- 0CAN039403, Advises That Util Will Not Complete Enhancement to Chemistry Dept Procedures Until 940701 as Committed to in Response to Insp Repts 50-313/93-07 & 50-368/93-07 + (ML20065C613)
- 05000368/LER-1982-028-03, /03L-0:on 820820,RCS Leakage Calculations Indicated Unidentified Leakage Greater than Tech Spec Limit of 1 Gpm.Cause Undetermined.Manway Will Be Examined During Refueling Outage to Determine Cause + (ML20065C614)
- ML20065C618 + (ML20065C618)
- ML20065C622 + (ML20065C622)
- ML20065C626 + (ML20065C626)
- ML20065C630 + (ML20065C630)
- ML20065C635 + (ML20065C635)
- ML20065C638 + (ML20065C638)
- 05000313/LER-1982-019, Forwards LER 82-019/03L-0 + (ML20065C644)
- ML20065C645 + (ML20065C645)