Rev 4 to Procedure AP-582, Loss of NNI-Y
ML20065C593
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/18/1994
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20065C588 List:
References
AP-582, NUDOCS 9404050238
Download: ML20065C593 (15)


Text

,

y j '.

h-I~

LONNIY REV 4

-AP-582 LO l

LOSS OF NNI-Y 1.0 ENTRY CONDITIONS

.LE a loss of NNI-Y AC or DC power exists IHEN use this-procedure.

2.0 INNEDIATE ACTIONS

-l There are no immediate actions for this procedure.-

t Document Section

- N F O R M AT I O N O N.L C. R. Nuclear i.

I

O 1

l l

l I

l-I This Procedure Addresses, Safety Related Components

/

Approved by MNPO kitu Date3//f/fV

'n () 'I '

9 AP-582 PAGE 1 of 15 LONNIY l

9404050238 940322 PDR ADOCK 05000302-P PDR-

a

-..g 2

- +~-

i l

l BLANK PAGE O

l 1

l O

1 v

AP-582 REV 4 PAGE 2 of 15 LONNIY l

I

3.0 FOLLOW-UP ACTIONS

[

ACTIONS DETAILS 1.

Control board instrumentation may be verified with the Redundant Instrument Panel during performance of this procedure.

3.1 Stabilize the plant with 1.

Valid instruments valid instruments include:

o RCS Press / RC-158-PI2

)

/ RC-159-PI2 0 FDW Flow / SP-8A-FIR 1 o Turb Hdr / SP-10A-PIR1 o Tave

/ RC-12-TAI o A DH Flow / DH-1-FIl o B DH Flow / DH-1-FI3-1 o PZR Level / RC-1-LIR1

/ RC-1-LIR3

)

2.

Position instrument selector switches to the NNI X powered

(~')

instrument V

l 3.2 Verify SASS modules o A red trip light on the swapped to the SASS module indicates alternate channel that the channel has swapped to the alternate instrument 3.3 Control RCS PRESS o Auto RCS PRESS control based on plant conditions, is unaffected using:

0 PZR Heaters o PZR Spray o PORV AP-582 REV 4 PAGE 3 of 15 LONNIY s

s

i 1

4 I

l

+

t 4

i i

i' 1

I 2

1 i

4 i

i u

4 i

1, BLANK PAGE I

l 1

1 i

AP-582 REV 4 PAGE 4 of 15 LONNIY

3.0 FOLLOW-UP ACTIONS (CONT'D1 ACTIONS DETAILS

+

i 3.4 Maintain PZR level > 50".

o Makeup control (MUV-31) is unaffected.

o E NNI-Y AC is N_QI energized, 1

M Letdown flow control (MUV-51) will fail to 50%.

o E MUV-51 is failed, M Letdown flow may be reduced by using MUV-50 or MUV-49.

E MUV-49 will NQI close, M close A_LL letdown cooler outlet isolation valves:

MUV-40, MUHE-1A, MUV-41, MUHE-18, MUV-505, MUHE-10.

3.5 Ensure both Condensate Pump E Condensate Pump controllers are selected to controllers are NOT

" HAND" and manually control energized, condensate flow with the M ensure the following:

individual pump controllers.

o VBDP-3 Bkr #38 is closed, o

24V DC Backup Power Supply, located in NNI Cabinet 3 Row 11, is energized, Top Row.

3.6 Notify S0TA, if available, of plant conditions.

O i

AP-582 REV 4 PAGE 5 of 15 LONNIY

\\

.~

l,,.c l

-l

}

i i

l i

l i

BLANK PAGE i

f

,f AP-582 ggy 4 PAGE 6 of 15 LONNIY

. ~..

~.

l..

3.0 F0LLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.7 Determine the status of o Observe the.4 power NNI-Y DC power.

supply monitor lights i

located in'NNI Cabinet 7 Row 3, Module 15.

o NNI-Y DC power is energized if at least 1 POS and 1 NEG light is lit.

f 3.8 Refer to Enclosure 2 for unreliable instrumentation.

3.9 Ensure the conditions Refer to Enclosure ~1.

maintained by the affected-interlocks are not exceeded.

3.10 WtiEN restoring power to NNI-Y, It[EH GO TO OP-501, Reactor Non-Nuclear Instrumentation beginning l

with Step 4.2.1.

i l

I l rG -

.j V

AP-582 REV 4 PAGE 7 of 15 LONNIY

- +

i BLANK PAGE J

AP-582 REV 4 PAGE 8 of 15 LONNIY

I.

Interlocks Affected by a loss of NNI-Y INTERLOCK DC DE-ENERGIZED AC DE-ENERGIZED NOV-112, MAKE-UP Disabled Disabled

-TANK LOW-LOW LEVEL if Y Transmitter if Y Transmitter INTERLOCK selected (will not selected (will not transfer upon LOW-LOW transfer upon.

MUTlevel)

LOW-LOW MUT level) i PORY Disabled Disabled (LOW POSITION)-

(will not Auto open)

(will not Auto open)

O I

l

(

AP-582 REV 4 PAGE 9 of 15 LONNIY

.~,,..,.,.,,m...

_,.,m.,,...-,,

.y.._,%,,v

_q

...,%,.,y-c,,,

,,yp._,.

O BLANK PAGE O

O V

AP-582 REV 4 PAGE 10 of 15 LONNIY

l-t Page 1 of 3 4 ()

Unreliable Instrumentation Due to a Loss of NNI-Y DC Power L

UNRELIABLE INSTRUMENT TITLE 4

ICS Panel RC-5A-TI2 Loop A NR T RC-58-TI2

. Loop B NR T,,

RC-7B-TAI.

Lo6p B T RC-14-FIR RCS Totaf* Flow RC-14B-FI Loop B RCS Flow SP-7B-FI Loop B S/U FW Flow i

TGF Panel SP-48-TI B Main Stm Temp SP-4B-TIR (B)

B Main Stm Temp PSA Panel CD-101-LI Hotwell Level MU-2-PI MVP Disch Press MU-4-FI Letdown Flow MU-5-TI Letdown Temp O

MU-18-DPI Postfilter DP SF-1-LII.

SF Pool A Level SF-1-LI2 SF Pool B Level ES Panel BS-1-FI2 B.RB Spray Flow CF-1-PI2 A CFT Press CF-1-PI4 B CFT Press CF-2-LI2 A CFT Level CF-2-LI4 B CFT Level DH-2-TI2 B DH Cooler Outlet Temp DH-6-TI2 B DH Suction Temp DH-1-FI2 B DHP Flow MU-23-FI4 Loop Al WR HPI Flow MU-23-FI3 Loop B2 WR HPI Flow O

AP-582 REV 4 PAGE 11 of 15 LONNIY

O

)

i i

1 i

1 1

BLANK PAGE 4

1 Ol 1

l l

O l

AP-582 REV 4 PAGE 12 of 15 LONNIY l

e,.

Page 2 of 3 I

. Unreliable Instrumentation Due to a Loss of NNI-Y DC Power UNRELIABLE INSTRUMENT

. TITLE Recundant Instrument Panel DH-1-FI7 B DHP Flow MU-4-FIl-Letdown Flow MU-14-LI2 MUT Level MU-24-FI2 Makeup ' Flow RC-1-LI4 PZR Level RC-2-TI2 PZR Temp RC-3B-PI2 RCS Press WR RC-4A-TI4 Loop A'WR Th RC-48-TI4 Loop B WR T3 RC-5A-TI4 Loop A WR T i

i RC-58-TI4.

Loop B WR T RC-131-PIl RCSPressLil SP-1A-LIS A OTSG S/U Level SP-1B-LI4 B OTSG S/U Level SP-1A-LI7 A OTSG Oper Level SP-18-LI7 B OTSG.0per Level SP-6A-PI4 A OTSG Press SP-6B-PI4 B OTSG Press O

SP-78-FIl Loop B S/U FW Flow SP-8A-FI2 Loop A MFW Flow SP-88-FI2 Loop B MFW Flow l

4 O

AP-582 REV 4 PAGE 13 of 15 LONNIY

5.

l I

i l

t i

i i

I t.

i 4

i tt 3i J

J h

k 1

I s

i BLANK PAGE-i N

)

j-i i

1 e

4 l

1 l

J I

4 I

4 i

i e

1

)

i-i-

3 i

1 4

1 1

4 1

4 4

i 4

1 i

4-i l

1 AP-582

.REV 4 PAGE 14 of 15 LONNIY i

h*.

w Page 3 of 3 Unreliable Instrumentation Due to a Loss of NNI-Y AC Power UNRELIABLE INSTRUMENT TITLE ICS Panel RC-5A-TI2 Loop A NR T RC-5B-TI2 Loop B NR T,c TGF Panel SP-48-TI B Main Stm Temp SP-48-TIR (B)

B Main Stm Temp PSA Panel MU-2-PI MVP Disch Press MU-4-FI Letdown Flow MU-5-TI Letdown Temp MU-18-DPI Postfilter DP RC-131-PI RCS Press LR SF-1-LII SF Pool A Level SF-1-LI2 SF Pool B Level ES Panel BS-1-FI2 B RB Spray Flow CF-1-PI2 A CFT Press CF-1-PI4 B CFT Press CF-2-LI2 A CFT Level CF-2-LI4 B CFT Level DH-1-FI2 B DHP Flow DH-2-TI2 B DH Cooler Outlet Temp DH-6-TI2 B DH Suction Temp Redundant Instrument Panel MU-4-FIl Letdown Flow RC-4A-TI4 Loop A WR Th RC-5A-TI4 Loop A WR T RC-131-PIl RCSPressLk SP-1A-LI7 A OTSG Oper Level SP-18-LI7 B OTSG Oper Level i

SP-6A-PI4 A OTSG Press SP-68-PI4 B OTSG Press SP-8A-FI2 Loop A MFW Flow SP-8B-FI2 Loop B MFW Flow V

AP-582 REV 4 PAGE 15 of 15 LONNIY

'