ML20065C566

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1982
ML20065C566
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/11/1982
From: Harris R
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20065C563 List:
References
NUDOCS 8209240192
Download: ML20065C566 (3)


Text

_ _ _ .

OPERATING DATA REPORT s

DOGE! NO. 50-387

< DAIL August 11,1982 COMPLETLD 11Y R. M. Ilarris 1 Lt.I PilONI; (215)770-5816 OPER ATING STATUS l

Susquehanna Steam Electric Station Unit 1 N"8!'*

1. Unit Name:
  • License issued 7/17/82 2 Reporting Period: July 1982*

3293 **MDC to be determined

1. Licenwd ThennalPower tMWts:
l. Nrmeplate Rating (Gion MWel: 1280 X 0.9 = 1052
5. Design I:lectrical Rating (Net MWel: 1052 - 41 = 1011 Fuel load commenced 7/27/82
    • at 12:20pm.
6. Masimum Dependabic Capacity (Grou MWel: _
7. Masimuin Dependable Capacity (Net MWe):

M. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Giie Reawns:

Initial Report i

9. Power Lesel To Which Restr cred.lf Ans Net MWe': zero Unit in initial fuel load phase. License restriction
10. Reasons l'or Restriction >. lf Any:

to 5% thermal _ power (164.6 MWt). Turbine Generator will not be synchronized at or below 5% thermal power -. -_

1his Month Yr to.Date Cumulatne 0 0 0 i1. Ilours in Reporting Period 0 0 0

12. Number Of flour Reactor Was Critical 0 0 0
13. Reactor Resene Shutdown Hours - ,,, _

0 0 0

14. Ilours Generator On-Line _

0 0 0 IS. Unit Revne Shutdown Hours 0 0 0

16. Grow Thermal Energy Generated (MWHi 0 0 0

! 17 Grow I.lectrical Energy Generated (MWHi 0 0 0

18. Net Elettrical Energy Generated (MWMi lo. Unit Senice factor N/A
20. Unit Asailability Factor N/A _
21. Unit Capacity factor (Using MDC Nett N/A
22. Unit Capacity factor (U>ing DI:R Neti N/A
23. Unit forced Outage Rate N/A i 24. Shutdowns Scheduled Oser Nest 6 Months iT,s pe. Date.and Duration of Each t None _ _ , _

i 25. If Shut Down At End Of Report Period.! stimated Date of Startup. _8/27/82 1 26. Units in Test Status (Prior to Commerci.il Operationi: Forecast Achiesed INiil \ L CRITICA LITY 8/27/82 INITIAL ELLCIRlCIIY 10/22/8_2 coyyERLirL op1 R A gloN 5/13/83 _

iu ,

B209240192 820012 PDR ADOCK 05000387 R PDR

- 0 SUSQUEHANNA STEAM ELECTRIC STATION '

DOCKET NO. 50-387 UNIT SilUTUOWNS AND POWER REDUCTIONS UNIT NAME SSEs Unit 1 DATE August 11, 1982_. _

COMPLETED BY R. M. Harris REPORT MONTil July 1982 TELEPHONE (215) 770-5816

-, {g  ; E Lkensce ,E -to "L Cause & Corrective N. . Date 3 3g { 2sE Event 3,7 g,? Action to

  • y5 5 3 @ =g Report e vi 's 5

,v Pievent Recurrente 6.

i None 1 . 2 3 4 F: Fosted Reason. Methm!: Exhibit G. Instructions S: Sdic<inled A 1:quipment Failure (Explain) l-Manual for Pieraiation of Data

!! Maintenance ci Test 2 Manual Scram- Entry Sheets Ioi 1.rcensee C Refuchng .LAutomatic Saam. (Sent Report (I l Rt File (NtfRIE D Regulatory Restriction 4 01her (E splam) O!61)

I Operator Training & Ucenw INaminalton F Administratise 5 G.Operatiornal lirror (thpl.iin) 1%1ubit I Saine Source etl77) li Other iE xplain)

- __m __ _-- -- --

.. g>

SUSQUEllANNA STEAM ELECTRIC STATION AVER 4GL D ALLY t; NIT POWER LEVEL DOCKE1 NO. __50-387 _

UNIT one DATE August 11,1982 COMPLETED BY R. M. Ilarris 1ELEPHONE (215l 770-5816 MONTH _ July 1982_

DAY AVER AGl: DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL t MWe Neti (MWe. Net )

g

  • _

g7 Zero*

  • Zero 2 __ _

ig 3 _ 19 _

Zero 4 *-

20 Zero 5

._ 2] Zero

  • 28#

6 22 .

  • Zero 7 23 ,

8 2.g Zero 9

  • Zero

.. 25 10

  • _ 26 Zero
  • Zero ll 2;
  • Zero 12 yg
  • Zero 1.1 . . . _ _

29 I4

_.- 30 Zero 15 11 Zero l 16 _ . .

  • License issued 12 noon on 7/17/82 INSTRUC110NS .

l On this format, hst the .6er gc daily umt e mer inct m MWe. Net for each day in 0.e repsinmg nu.nih.C. impute to i u.c nem,i +.ir ny>ut i .

(907) l-t - , _ _____ . __ _

_ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . _ . _ _ . . . _ _ _ . _ _ _ _ _ _ _