TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II September 20, 1982 BLRD-50-439/81-28 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 5c ers
Dear Mr. O'Reilly:
cn QO BELLEFONTE NUCLEAR PLANT UNIT 2 - CORROSION OF DIESEL GENERATOR CONTROL 3
}* -o 4
PANEL - BLRD-50-439/81 FIFTH INTERIM REPORT c 'i TE3 E
t The subject deficiency was initially reported to NRC-0IE Inspector
[
SN J. Crlenjak on March 20, 1981, in accordance with 10 CFR 50.55(e) as
- ).
NCP. 1380. This was followed by our interim reports dated April 20, I
- 7' June 25, October 2, and December 18, 1981. As discussed with D. Quick by telephone on August 25, 1982, this report was delayed. Enclosed
+
is our fifth interim report. We expect to submit our next report by February 7, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, ager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 J10fs5*
w B209240222 820920 PDR ADOCK 05000439 S
PDR An Equal Opportunity Employer a
/.
ENCLOSURE BELLEFONTE hUCLEAR PLANT UNIT 2 CORROSION OF DIESEL GENERATOR CONTROL PANEL NCR 1380 BLRD-50-439/81-28 10 CFR 50.55(e)
FIFTH INTERIM REPORT Description of Deficiency 1
One of the Bellefonte diesel generator's control panels was improperly stored onsite by TVA. As a result, the ferrous metal parts of the subcomponent voltage regulation panel have oxidized to the extent that the 3
component is not capable of performing the fbnction for which it was intended. In addition, corrosion of other components in the control panel (plates, nuts, and bolts, etc.) of the diesel have rendered it inoperable in its present condition.
Interim Progress The vendor (Transamerica Delaval) has notified TVA that the diesel's damaged voltage regulation panel, a component of control panel 2RT-ELCP-2-B, is beyond repair and must be replaced. A delivery date of December 1982 has been establish for delivery of the replacement voltage regulation panel.
TVA is investigating the cause of this deficiency and the actions to 3
prevent recurrence.