Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059H638 + (ML20059H638)
- IR 05000458/1993024 + (ML20059H642)
- ML20059H645 + (ML20059H645)
- LIC-93-0304, Addresses Previously Noted Commitment & License Condition Based on Projected Load Capacity Factor at Beginning of Cycle 15 + (ML20059H647)
- ML20059H649 + (ML20059H649)
- ML20059H650 + (ML20059H650)
- ML20059H651 + (ML20059H651)
- ML20059H655 + (ML20059H655)
- ST-HL-AE-4679, Requests Enforcement Discretion for TS 3/4.1.3.3, Position Indication Sys Shutdown + (ML20059H656)
- ML20059H659 + (ML20059H659)
- ML20059H660 + (ML20059H660)
- ML20059H661 + (ML20059H661)
- ML20059H663 + (ML20059H663)
- L-93-283, Forwards Addl Info to Clarify Exemption Request Re Biometrics Access Control,Per 10CFR73.55.Encls Withheld,Per 10CFR73.21 + (ML20059H664)
- ML20059H665 + (ML20059H665)
- ML20059H666 + (ML20059H666)
- SNRC-2121, Requests Exemption from Requirements of 10CFR140.11(a)(4) to Permit Util Withdrawal from Participation in Secondary Financial Protection Program & Reduction of Primary Level Coverage from $200 Million to $100 Million + (ML20059H667)
- ML20059H668 + (ML20059H668)
- ML20059H670 + (ML20059H670)
- ML20059H672 + (ML20059H672)
- ML20059H673 + (ML20059H673)
- ML20059H677 + (ML20059H677)
- ML20059H678 + (ML20059H678)
- ML20059H679 + (ML20059H679)
- ML20059H681 + (ML20059H681)
- ML20059H682 + (ML20059H682)
- ML20059H685 + (ML20059H685)
- ML20059H687 + (ML20059H687)
- ML20059H688 + (ML20059H688)
- ML20059H690 + (ML20059H690)
- ML20059H691 + (ML20059H691)
- ML20059H692 + (ML20059H692)
- ML20059H693 + (ML20059H693)
- ML20059H694 + (ML20059H694)
- ML20059H695 + (ML20059H695)
- LIC-93-0272, Special Rept:On 930928,Containment Penetration E-11 Was Breached to Support Installation of Test Flange for SG Eddy Current Testing.Impairment Permit 3457 Generated,Fire Watch Established.Eddy Current Testing Completed 931030 + (ML20059H696)
- ML20059H698 + (ML20059H698)
- ML20059H699 + (ML20059H699)
- ML20059H701 + (ML20059H701)
- ML20059H703 + (ML20059H703)
- ML20059H704 + (ML20059H704)
- ML20059H705 + (ML20059H705)
- ML20059H706 + (ML20059H706)
- ML20059H707 + (ML20059H707)
- ML20059H709 + (ML20059H709)
- 05000412/LER-1993-011-01, :on 931006,containment Closure Deficiency During Refueling Occurred.Caused by Incomplete Installation of Temporary Seal on Spare Penetration Through Primary Containment Bldg.Control Room Notified + (ML20059H710)
- ML20059H711 + (ML20059H711)
- ML20059H712 + (ML20059H712)
- ML20059H713 + (ML20059H713)
- ML20059H714 + (ML20059H714)
- 05000277/LER-1993-014, :on 931006,discovered Crev Control Switches in Off Instead of Auto Position.Caused by Poor Communication Between Plant Personnel.Control Switches Properly Aligned + (ML20059H716)